HomeMy WebLinkAboutD-2690221i
r% A 0-r. % ■. -R
12" STORM PIPE —1
CONNECTION
5'
DITCH SECTION DR6
27
-
M 0 111101 :1
CENTER OF
OF DETAIL
)W STRUCTURE
rO CENTER OF
OM CENTER OF
CL CL
GRATE BARRIER
1 Q A ss11--s
NOTE:
FOR DETAILS NOT SHOWN SEE
WSDOT STANDARD PLAN B- 95.20 -00
TYPICAL CATCH BASIN LOCATION
N.T.S.
CONCRETE BLOCK
QUARRY SPALLS
LA3
-CONCRETE BLOCK ANCHOR
CONCRETE FOOTING
KEYED INTO
UNDISTURBED SOIL
AS SHOWN
6` MIN. TYPICAL
LOCATION NO.
�0 ,p 214055R�,O
• �' GIST 1
s"'ONAL
A
i TO AVOID CONFLICTS.
tE LOCATIONS
D + V OR 4 (D), WHICH EVER IS GREATER
%R ..vr ■.
► + 6'
FINISHED GRADE
1211 QUARRY SPALLS
® 1•
/BEVELED END SECTION
CONSTRUCTION GEOTEXTILE FOR
NENT EROSION CONTROL -
!+ ■ . . ■
PLACE ROCK VABOVE CROWN
BOTH SIDES OF
CONSTRUCTION ,� ,:; I� j •
FOR PERMANENT 8
�
tj
EROSION CONTROL
LOOSE RIPRAP
SECTION A-A
DATE
P.E. STAMP BOX
�S M° S r° �o
�` of WAs, � ti�
A
V
PIPE DISCHARGE PROTECTIO1
1 atvAL EN
1q11(9
DAT
P.E. STAMP BOX
�iw Washington State
-7! Department of Transportation
4 AA 0
corridor Program
In DAVID EVANS
ILFIIVCER BERGER ® AMASSOCIATESmc.
® 415 - 118th Avenue SE
Bellevue Washington 98005 -3518
Civil Inc. Phone: 425.519.6500
TRI -STATE CONSTRUCTION, INC
q enC� and e a c�cctu�i i g
virq"•
QUARRY SPALLS *
FINISHED - .M
(re
FACE OF
WALL
II . • -
ffl_§_[_� � � � , i 1 � 1 � 1
SECTION
QUARRY
SPALLS
_2
W4
22
1 Plot 8
DD6
I -405
SHEET
76
OF
392
SHEETS
PIPE OUTFALL -WALL DRAIN
N.T.S.
FILE NAME
C: tWorkIProjectW iseXBTJV00021dms02269\BTJV0002 DE DR 405- AB.dgn
TIME
11:29:47 AM
REGION
STATE
DATE
8/19/2010
AS -BUILT
716/10
MS I
NO.
PLOTTED BY
kxla
NDC 65 - REVISED DETAILS
08101/08
DJ C
10
WAS)
DESIGNED BY
E. ANDERS
NDC 59 - ISSUE FOR CONSTRUCTION REVS
06109/08
MS
JOB NUMBER
ENTERED BY
S. WHITE
IFC
5/22/0$
JMS
CHECKED BY
J. TORRIE
ANDC 46 - REVISIONS
05105108
JMSY
CONTRACT NO.
PROJ. ENGR.
L. HODGSON
® ISSUED AT RISK
04/01108
JMS
C
LREGIONAL ADM.
D. DYE
REVISION
DATE
BY
-7295
6` MIN. TYPICAL
LOCATION NO.
�0 ,p 214055R�,O
• �' GIST 1
s"'ONAL
A
i TO AVOID CONFLICTS.
tE LOCATIONS
D + V OR 4 (D), WHICH EVER IS GREATER
%R ..vr ■.
► + 6'
FINISHED GRADE
1211 QUARRY SPALLS
® 1•
/BEVELED END SECTION
CONSTRUCTION GEOTEXTILE FOR
NENT EROSION CONTROL -
!+ ■ . . ■
PLACE ROCK VABOVE CROWN
BOTH SIDES OF
CONSTRUCTION ,� ,:; I� j •
FOR PERMANENT 8
�
tj
EROSION CONTROL
LOOSE RIPRAP
SECTION A-A
DATE
P.E. STAMP BOX
�S M° S r° �o
�` of WAs, � ti�
A
V
PIPE DISCHARGE PROTECTIO1
1 atvAL EN
1q11(9
DAT
P.E. STAMP BOX
�iw Washington State
-7! Department of Transportation
4 AA 0
corridor Program
In DAVID EVANS
ILFIIVCER BERGER ® AMASSOCIATESmc.
® 415 - 118th Avenue SE
Bellevue Washington 98005 -3518
Civil Inc. Phone: 425.519.6500
TRI -STATE CONSTRUCTION, INC
q enC� and e a c�cctu�i i g
virq"•
QUARRY SPALLS *
FINISHED - .M
(re
FACE OF
WALL
II . • -
ffl_§_[_� � � � , i 1 � 1 � 1
SECTION
QUARRY
SPALLS
_2
W4
22
1 Plot 8
DD6
I -405
SHEET
76
OF
392
SHEETS