Loading...
HomeMy WebLinkAboutD-2690221i r% A 0-r. % ■. -R 12" STORM PIPE —1 CONNECTION 5' DITCH SECTION DR6 27 - M 0 111101 :1 CENTER OF OF DETAIL )W STRUCTURE rO CENTER OF OM CENTER OF CL CL GRATE BARRIER 1 Q A ss11--s NOTE: FOR DETAILS NOT SHOWN SEE WSDOT STANDARD PLAN B- 95.20 -00 TYPICAL CATCH BASIN LOCATION N.T.S. CONCRETE BLOCK QUARRY SPALLS LA3 -CONCRETE BLOCK ANCHOR CONCRETE FOOTING KEYED INTO UNDISTURBED SOIL AS SHOWN 6` MIN. TYPICAL LOCATION NO. �0 ,p 214055R�,O • �' GIST 1 s"'ONAL A i TO AVOID CONFLICTS. tE LOCATIONS D + V OR 4 (D), WHICH EVER IS GREATER %R ..vr ■. ► + 6' FINISHED GRADE 1211 QUARRY SPALLS ® 1• /BEVELED END SECTION CONSTRUCTION GEOTEXTILE FOR NENT EROSION CONTROL - !+ ■ . . ■ PLACE ROCK VABOVE CROWN BOTH SIDES OF CONSTRUCTION ,� ,:; I� j • FOR PERMANENT 8 � tj EROSION CONTROL LOOSE RIPRAP SECTION A-A DATE P.E. STAMP BOX �S M° S r° �o �` of WAs, � ti� A V PIPE DISCHARGE PROTECTIO1 1 atvAL EN 1q11(9 DAT P.E. STAMP BOX �iw Washington State -7! Department of Transportation 4 AA 0 corridor Program In DAVID EVANS ILFIIVCER BERGER ® AMASSOCIATESmc. ® 415 - 118th Avenue SE Bellevue Washington 98005 -3518 Civil Inc. Phone: 425.519.6500 TRI -STATE CONSTRUCTION, INC q enC� and e a c�cctu�i i g virq"• QUARRY SPALLS * FINISHED - .M (re FACE OF WALL II . • - ffl_§_[_� � � � , i 1 � 1 � 1 SECTION QUARRY SPALLS _2 W4 22 1 Plot 8 DD6 I -405 SHEET 76 OF 392 SHEETS PIPE OUTFALL -WALL DRAIN N.T.S. FILE NAME C: tWorkIProjectW iseXBTJV00021dms02269\BTJV0002 DE DR 405- AB.dgn TIME 11:29:47 AM REGION STATE DATE 8/19/2010 AS -BUILT 716/10 MS I NO. PLOTTED BY kxla NDC 65 - REVISED DETAILS 08101/08 DJ C 10 WAS) DESIGNED BY E. ANDERS NDC 59 - ISSUE FOR CONSTRUCTION REVS 06109/08 MS JOB NUMBER ENTERED BY S. WHITE IFC 5/22/0$ JMS CHECKED BY J. TORRIE ANDC 46 - REVISIONS 05105108 JMSY CONTRACT NO. PROJ. ENGR. L. HODGSON ® ISSUED AT RISK 04/01108 JMS C LREGIONAL ADM. D. DYE REVISION DATE BY -7295 6` MIN. TYPICAL LOCATION NO. �0 ,p 214055R�,O • �' GIST 1 s"'ONAL A i TO AVOID CONFLICTS. tE LOCATIONS D + V OR 4 (D), WHICH EVER IS GREATER %R ..vr ■. ► + 6' FINISHED GRADE 1211 QUARRY SPALLS ® 1• /BEVELED END SECTION CONSTRUCTION GEOTEXTILE FOR NENT EROSION CONTROL - !+ ■ . . ■ PLACE ROCK VABOVE CROWN BOTH SIDES OF CONSTRUCTION ,� ,:; I� j • FOR PERMANENT 8 � tj EROSION CONTROL LOOSE RIPRAP SECTION A-A DATE P.E. STAMP BOX �S M° S r° �o �` of WAs, � ti� A V PIPE DISCHARGE PROTECTIO1 1 atvAL EN 1q11(9 DAT P.E. STAMP BOX �iw Washington State -7! Department of Transportation 4 AA 0 corridor Program In DAVID EVANS ILFIIVCER BERGER ® AMASSOCIATESmc. ® 415 - 118th Avenue SE Bellevue Washington 98005 -3518 Civil Inc. Phone: 425.519.6500 TRI -STATE CONSTRUCTION, INC q enC� and e a c�cctu�i i g virq"• QUARRY SPALLS * FINISHED - .M (re FACE OF WALL II . • - ffl_§_[_� � � � , i 1 � 1 � 1 SECTION QUARRY SPALLS _2 W4 22 1 Plot 8 DD6 I -405 SHEET 76 OF 392 SHEETS