Loading...
HomeMy WebLinkAboutD-26911211 3" CSBC 8" QUARRY SPALLS i- NONWOVEN GEOTEXTILE FOR SOIL STABILIZATION 2' -0 /I COMMON BORROW • : -. --• • 2.0•• CCESS ROAD 3" CSBC 8" QUARRY //- SPALLS i 1,6„ \ ( 2'0" NONWOVEN GEOTEXTILE FOR SOIL STABILIZATION 6" BACKFILL FOR SAND DRAINS TYPICAL ANCHOR TRENCH DETAIL N.T.S. GEOMEMBRANE /PROTECTION MAT FULL WIDTH OF RAMP NOTES: 1. CELLULAR CONFINEMENT MAT REQUIRED ON SLOPES STEEPER THAN 3HAV. SEE CELLULAR CONFINEMENT DETAILS. COMMON BORROW 116111 TOPSOIL 6" BACKFILL FOR SAND DRAINS 2. INSTALL GEOMEMBRANE PROTECTION MAT OVER HPDE LINER IN RAMP AREA. SEE DETAIL. 3. INSTALL HDPE BOOT (DESIGNED BY LINER MFR.) AROUND ALL PIPE PENETRATIONS TO PROVIDE LEAK PROOF SEAL. 4. ANCHOR AT TOP OF SLOPES PER TYPICAL ANCHOR TRENCH DETAIL. DESIGNED BY REGIONAL ADM. 11-611 TOPSOIL 6" BACKFILL FOR SAND DRAINS 6" BACKFILL FOR SAND DRAINS �--- CELLUAR CONFINEMENT MAT. FILL CELLS WITH BACKFILL FOR SAND DRAINS. SEE NOTE 1. HDPE LINER, 40 -MIL NONWOVEN GEOTEXTILE FOR SOIL STABILIZATION PREPARED SUBGRADE LINER DETAIL N.T.S. C: lWorklProjectWiselBTJV00021dms022681BTJV0002 DE DR 167- AB.dgn 2:35:53 PM REGION STATE FED,AID PROJ.NO. 8/12/2010 10 WAS d10 E. ANDERS 2 AS -BUILT 716/10 MS JOB NUMBER S. WHITE NDC 98 - LINER DETAILS 1/29109 Ims J. TORRIE 0 IFC 6/27108 JS CONTRACT NO. C -7295 LOCATION NO. L. HODGSON A ISSUED AT RISK 3/14108 JS D. DYE REVISION DATE BY �1. S To JO K ,3F W A S11 4/ i- DATE P.E. STAMP BOX 12" TOPSOIL EL. 18.50 101- Ar- MM911k1" Ll GEOMEMBRANE- PROTECTION MAT NONWOVEN GEOTEXTILE FOR SOIL STABILIZATION i w - - 12" TOPSOIL �I INSTALL GEOMEMBRANE PROTECTION MAT OVER r AND IN RAMP AREA. GEOMEMBRANE - PROTECTION MAT NONWOVEN GEOTEXTILE FOR SOIL STABILIZATION E---- - -- 0 12" TOPSOIL N TA E Washington State Department of Transportation Corridor DAVID EVANS ILFINGEty BERGE� ANDASSOCIATE$IAtC. rj� �( 415 - 118th Avenue SE Bellevue Washin ton 98005 -3518 Civil Inc. Phone: 4259.6500 TRI- STATE CONSTRUCTION, INC 101 -. [ORT FM • w 112