Loading...
HomeMy WebLinkAboutD-271109T T N r N CL CL BANK FULL WIDTH 1/3 1 1/3 1/3 SCOUR POOL EXCAVATED 0 J U_ GAPS BETWEEN BOULDERS IN TOP COURSE OF "HOOK" N 1/3 BOULDER ON SLOPES: SOIL LEVELED AT PLANTING HOLE LOCATION; PLANTS INSTALLED UPRIGHT (SEE NOTE 3) 011� BIODEGRADEABLE COIR WEED MAT INSTALLED AT TREES AND SHRUBS PLANTED ABOVE TOP OF BANK (SEE NOTE 7) UNDISTURBED NATIVE SOIL 06M71 ar 09bozmm ev CONSULTING ENGINEERS 701 DEXTER AVENUE NORTH SUITE 200 SEATTLE, WASHINGTON 98109 (206) 284 -0860 ROOTS SPREAD INTO PLANTING HOLE (SEE NOTE 3) ORDINARY HIGH WATER MARK APPROX. EL. 22.0 NAVD 88 LIVE STAKES 4' MIN. LENGTH ALL DISTURBED AREAS - SHALL BE SEEDED WITH NATIVE GRASSES 6" NATIVE -- TOPSOIL FILL STAKED GEOTEXTILE L •, v •;I MZ TOP OF BANK TOP OF BANK EL. VARIES LIVE STAKES , 4' MIN. LENGTH 3 MAX. ALL DISTURBED AREAS SHALL BE SEEDED WITH NATIVE GRASSES z 6" NATIVE��`�����,� TOPSOIL FILL STAKED GEOTEXTILE oQoo,000,o,QLLU ,o�u,00�uoou NATIVE TOPSOIL BACKFILL ' BALLAST BACKFILL 1' MIN. THICKNESS SCALE: 1 " = 6" TOP OF ROOT BALL 1/2- ABOVE FINISH GRADE i O — PLANTING HOLE BACK — FILLED WITH NATIVE SOIL (SEE NOTE 3) REVISION TOP OF BANK EL. VARIES ORDINARY HIGH WATER MARK APPROX. EL. 22.0 NAVD 88 TOE OF BANK ELEVATION VARIES CREEK BOTTOM °Iz N 3' -0" MIN. TOE ROCK FINISH GRADE NATIVE TOPSOIL BACKFILL ' BALLAST BACKFILL - 1' MIN. THICKNESS CREEK BANK REGRADE AND TREATMENT BANK PROTECTION z NOT TO SCALE 8 BIODEGRADEABLE COIR WEED MAT INSTALLED AT LIVE STAKES PLANTED ABOVE TOP OF BANK (SEE NOTE 7) 90" APPROX. 75% OF LENGTH OF STAKE BELOW GRADE SURVEYED: DESIGNED: B.B. DRAWN: P.M. CHES.C. BY DATE APPR APPROVED: B.B. BANK STREAM RESTORATION NOTES - GEOTEXTILE WRAPPED PLANTING AREA MATTRESSES V -1.5' THICK 1. LIMITS AND GRADES SHOWN ARE APPROXIMATE. 4' MIN. BANK EMBEDMENT FIELD ADJUST PER ENGINEER QUANTITIES FOR —LIVE BRANCH BUNDLES BIDDING SHALL BE BASED ON PLANT SCHEDULE. 6" THICK, 5' MIN. BANK EMBANKMENT 2, PLANT QUANTITIES, SPECIES, AND SPACING ARE ORDINARY HIGH WATER MARK INDICATED BELOW APPROX. EL. 22.0 NAVD 88 —TOE OF BANK 3. LIVE STAKES WHICH ARE NOT PLANTED WITHIN 8 ELEVATION VARIES HOURS OF CUTTING SHALL BE SOAKED IN WATER —CREEK BOTTOM FOR 24 HOURS MINIMUM PRIOR TO Sitka willow INSTALLATION. STAKES WHICH HAVE ALREADY 148 DEVELOPED ROOTS SHALL NOT BE USED. PRIOR TO INSTALLATION OF LIVE STAKE TRIM SIDE o BRANCHES CLOSE WITH SHARP BLADE. CREATE N PILOT HOLE (1 -2" DIAMETER) PERPENDICULAR TO FINISH GRADE. GENTLY INSTALL STAKES, 3' -0" MIN. TOE ROCK BUTT- END -DOWN, INTO PILOT HOLE. IF STAKES 2' ARE POUNDED INTO PILOT HOLES, USE LIVE STAKE, 5' LENGTH DEAD -BLOW HAMMER. INSTALL STAKES SUCH 2 vertical feet above OHW. THAT APPROXIMATELY 75% OF THE LENGTH OF THE ENTIRE STAKE IS BELOW GRADE AND SUCH THAT A MINIMUM OF 3 BUD SCARS REMAIN ABOVE GRADE. AVOID DAMAGING THE BUDS WHEN INSTALLING THE STAKE. AFTER INSTALLATION, BACKFILL PILOT HOLE WITH NATIVE SOIL. ROCKS, TRASH OR DEBRIS FOUND IN WILLOW LIVE STAKE; EXCAVATED SOIL SHALL NOT BE USED TO 3/4" TO 1 1/2" DIAMETER, BACKFILL THE PLANTING HOLE. TAMP SOIL 3fi" TO 48" HEIGHT AROUND STAKE. BACKFILL SOIL SHALL MAKE GOOD CONTACT WITH THE STAKE, LEAVING NO AIR POCKETS. MINIMUM 3 BUD SCARS ABOVE 4. PRIOR TO INSTALLATION OF 1 GALLON CONTAINER GROUND (SEE NOTE 2) PLANTS, CLEANLY PRUNE ANY BROKEN BRANCHES AND SCARIFY OUTER 1 INCH OF ROOTBALL. FINISH GRADE CLEANLY PRUNE BROKEN, DEAD, OR DISEASED ROOTS. IF ROOTBOUND, TEASE OUT OR CUT CIRCLING ROOTS. EXCAVATE CIRCULAR PLANTING y \/ HOLE WITH VERTICAL SIDES AS SHOWN IN DETAIL 24 (THIS SHEET). SCARIFY SIDES AND BOTTOM OF PLANTING HOLE. ON SLOPES, LEVEL SOIL AT PLANTING HOLE LOCATION TO ENSURE COVERAGE NATIVE STUBBED OF ROOTS ON DOWNHILL SIDE OF PLANT AND NATIVE SOIL INSTALL PLANT UPRIGHT. PLACE ROOTBALL ON PILOT HOLE UNDISTURBED NATIVE SOIL AT BASE OF PLANTING BACK — FILLED WITH HOLE AND SPREAD ROOTS OUT TO SIDES OF PIT. NATIVE SOIL CLEANLY TRIM ANY ROOTS THAT ARE TOO LONG (SEE NOTE 2) TO LAY STRAIGHT IN PLANTING HOLE. PLANTS SHALL BE UPRIGHT, PLUMB, AND TOP OF ROOTBALL SHALL BE Y" ABOVE FINISH GRADE. BACK -FILL PLANTING ROLE WITH NATIVE SOIL EXCAVATED FROM PLANTING HOLE AND TAMP SIDE BRANCHES SOIL AROUND ROOTS TO PREVENT AIR POCKETS. TRIMMED CLOSE (SEE NOTE 2) ROCKS LARGER THAN 1" DIAMETER AND ANY TRASH OR DEBRIS FOUND IN EXCAVATED SOIL LIVE STAKE INSTALLATION DETAIL KT� S HALL NOT BE USED TO BACKFILL THE PLANTING HOLE. BACKFILL SOIL SHALL MAKE GOOD SCALE: 1" = V -0" - CONTACT WITH THE ROOTBALL, LEAVING NO AIR POCKETS. 09 5. IMMEDIATELY AFTER PLANT INSTALLATION, D-2 1 7 THOROUGHLY WATER IN EACH INSTALLED PLANT. OR LIVE STAKE. PLANT SCHEDULE PLANTING AREA SPECIES SPACING QUANTITY TYPE & SIZE NOTES 1 M N x d 1 N LOWER BANK 295 sf Safi sitchensis Sitka willow 1' 148 LIVE STAKE, 5' LENGTH Location: Between OHW and Corpus stolonifera Red -osier dogwood 2' 37 LIVE STAKE, 5' LENGTH 2 vertical feet above OHW. UPPER BANK 805 sf 1 GALLON PLANT IN SINGLE - SPECIES Symphoricarpos albus Snowberry 4' 20 CONTAINER GROUPS OF 2 -3 PLANTS Location: Between upper limit 1 GALLON PLANT IN SINGLE- SPECIES of tower Bank Planting Area Rosa nootkana Nootka rose 4' 20 CONTAINER GROUPS OF 2 -3 PLANTS and upper Limit of Planting. 1 GALLON Salix scouleriana Scouler's willow 4' 10 CONTAINER SCALE: AS SHOWN ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY HORIZONTAL- NAD 1983/1991 DATUM - CITY OF ba RENTON Planning /Building /Public Works Dept. DATE: 4/6/07 RENTON VILLAGE STORM SYSTEM PROJECT FlELDBOOK- PAGE: CHANNEL RESTORATION DETAILS 9 -" 12 o r b > Cn �N 1 M N x d 1 N