SCALE: 1 " =20' RIM EL= 28.45
3 18 E &VI IE =16.4
12' S I] 16.95
6" NE IE =17.75
5" NW E =17.75
IN VAULT
12 "W
(PLAN W -2114
*2 REVISION TO NEW 8" WATER SERVICE
TO TRITON TOWERS BLDG
PROFILE VIEW (nts)
Ex. 6" W to Ex. Tele Conduits
Building Vaults
THRIFTWAY STORE
*1 NEW BOX CULVERT
ASBUILT LOCATION
EX. 8 "W FIRE SPRINKLER
S RENTON
VILLAGE PL
Added 6" GV
2 45 ELs (FL) New 8" Service,
1 Spool (FL) 6 "x8" Reducer
Thrust Block
*1 AS —BUILT CONSTRUCTION NOTES
*7a Found 6 "conduit w/ 3 lines
in it. Said to be old Boeing
line owned /maintained by
Qwest for medical offices in
Triton Tower Bldg.
71b Found 2 4" com. lines
running east —west.
EXISTING GRADE
P. 8
�4' aF WA9q��,�.�✓.
0 � 2
b Am, a
�o A 37338 q ryW
d'OIST
�SS'.ONAL G
EXPIRES: 8/20/2007
RIM
EL= 2921
RIM
EL =28.41
8"
NW IE =17.91
8"
N IE =17.91
8"
SW IE =17.91
8"
SW IE =17.91
CUT AND' CAP EX 8"W
NORTH OF TEE - =
INSTALL 8 "MJ PLU, AND CU N NEW:
THRUST BLOCK 1
6" TEE (FL , 2 -6VGVp(I *X AS
� -D4w�l 1 — 61"X" ' INCREASE
W w' -2-- 6 SLE S
-B OC-K
1 / Q1 -6 "GV XFL)
I SEE PdURE FOR F
Z2 CONTRACTOR TO MAINTIAN 15 FOOT CLEARANCE FROM
PSE OVERHEAD POWER LINES.
EXISTING GRADE
)E
(FL X MJ)
irWUtNLa 1-UK 7L -INUM YVA 1 1=1
)N ABOVE NEW BOX CULVERT
1. INSTALL CONCRETE DEAD -MAN BLOCKS ON EXISTING 12" WATER LINE ON
/ EAST AND WEST SIDE OF NEW BOX CULVERT, ALLOW 5 -DAY CURING TIME.
2. CUT IN 2 NEW 12" ISOLATION GATE VALVES, AND INSTALL 12" X 8" TEE
ON EAST SIDE OF BOX CULVERT. SHACKLE NEW VALVES AND TEE TO
/ 9 DEAD -MAN BLOCKS WITH 6- 3/4" SHACKLE RODS (TYPICAL).
CITY CREW WILL PERFORM CUT IN OF VALVES.
3. INSTALL TEMPORARY 12 -INCH END CAPS ON EACH SIDE OF EXISTING
12 -INCH WATER LINE.
4. INSTALL NEW 8" D.I. WATER LINE FROM NEW TEE ON EAST SIDE OF BOX
CULVERT TO EXISTING 6" WATER LINE IN PLANTING STRIP TO SOUTH.
INSTALL DEADMAN BLOCK ON EX 12 "W
CUT IN NEW: 5. PRESSURE TEST, DISINFECT, FLUSH NEW 8 -INCH LINE.
12 "X 8" TEE (FL X FL)
�1 - 12" GV (FL X MJ) 6. AFTER OBTAINING SATISFACTORY PURITY TESTS, CITY CREW WILL CONNECT
1 - 8" GV (FL X MJ) NEW 8 -INCH LINE TO EXISTING 6" WATER LINE ON SOUTH SIDE, AND
-1 - 12" ADAPTER (FL X MJ) WILL INSTALL NEW 6 -INCH TEE AND VALVES.
rxsN_- eLee_K-
T] -
ST _BL T - 7. CITY CREW WILL CLOSE NEW VALVES TO ISOLATE THE SECTION OF THE
_W_ 12_.01 W 12 -INCH LINE THAT WILL BE RELOCATED BY CONTRACTOR.
2 % 8. REMOVE ISOLATED SECTION OF EXISTING 12 -INCH WATER LINE AND
INSTALL NEW BOX CULVERT.
55' 8 "DI W > Ss - 9. INSTALL NEW 12 -INCH WATER LINE ABOVE BOX CULVERT, WITH 6 -INCH
a 0 EL= 62 THICK ETHAFOAM PAD UNDER 12 -INCH WATER LINE ABOVE BOX CULVERT,
00 oN�OM 18" E &w IE- 9.57 INCLUDING VERTICAL BENDS, TEMPORARY END CAPS AND BLOW -OFFS.
TV a "PVC S IE= SHACKLE ALL PIPES, FITTINGS, BENDS, END CAPS, WITH 6 -3/4"
—�L - SHACKLE RODS.
ROTECTTRI E 10.PRESSURE TEST, DISINFECT AND FLUSH NEW SECTION OF 12 —INCH
-- / WATER LINE.
11.AFTER OBTAINING SATISFACTORY PURITY TESTS, CITY CREW WILL CONNECT
NEW 12 —INCH WATER LINE TO NEW 12" VALVES AT BOTH ENDS OF BOX
V:E
RE ME R CULVERT AND SHACKLE PIPES TO EXISTING DEADMAN BLOCKS.
/ CONSTRUCTION NOTES
I EX.
3" I
IN
iZ _
io TO TRI
CALL 48 HOURS BEFORE YOU DIG
1-800-424-5555
)OMESTI01 METE
ATION M TER O CONTRACTOR SHALL REMOVE AND PRESERVE SIGN AND SMALL TREES AND
T (w_5 ) SHRUBS THAT INTERFERE WITH WATER MAIN WORK. PLACE ROOTBALL IN
TOWERS NE BURLAP OR CONTAINER AND WATER. REPLANT IN SAME LOCATION AFTER
WATER RELOCATION IS COMPLETED.
O2 REMOVE EX. 8" WATER AS NEEDED AFTER NEW 8" WATER IS COMPLETED
AND CONNECTED TO EX. 6" WATER FOR OFFICE BUILDING. PLUG AND CF
OPEN ENDS WITH CONCRETE.
O3 RELOCATE 55'1 NEW 12" WATER MAIN OVER NEW BOX CULVERT AFTER
BOX CULVERT IS INSTALLED.
EXISTING GRADE
4'6"± 3't 8' MIN.
8' MIN.
2T1 � 1T1 NEW 12 "DI PIPE I 5' MIN. ' 8't
NSPOOLS (TYPICAL)
LEG ^
LENGTHS AS NEEDED 18" MIN
EX 12" DI W
6 3/4" SHACKLE SPOOL SPOOL
RODS (TYPICAL) 12" SLEEVE (MJ)
4
DEADMAN BLOCK NEW 12" GATE VALVE
(TYR EACH SIDE) (MJ X MJ)
2- 12" 22 1/2 ' BENDS (MJ X ...
SHACKLE TO VALVE, DEADMAN BLOCK,
AND THROUGH ALL BENDS TO OPPOSITE
SIDE. (TYPICAL BOTH SIDES)
BACK -UP POWER
12"
WATER
SS MH
GENERATOR
_ 44 -
RIM
EL =29.19
18"
E &W IE =1'89
GAS METER
`75 '
8"
NE IE =11.44
WITH BOLLARDS
INSTALL DEAD BLOCK
N EX
12 "W
X"
N IE=
CUT IN NEW 2" GV (MJ X
J)
BLOCK
VZL"rl
6Z
NE
STAL
30
- '
.. EX. 1.5"
-
- --
METER
-
—�-
0w
`?
M E VALVE.
---
CUT AND' CAP EX 8"W
NORTH OF TEE - =
INSTALL 8 "MJ PLU, AND CU N NEW:
THRUST BLOCK 1
6" TEE (FL , 2 -6VGVp(I *X AS
� -D4w�l 1 — 61"X" ' INCREASE
W w' -2-- 6 SLE S
-B OC-K
1 / Q1 -6 "GV XFL)
I SEE PdURE FOR F
Z2 CONTRACTOR TO MAINTIAN 15 FOOT CLEARANCE FROM
PSE OVERHEAD POWER LINES.
EXISTING GRADE
)E
(FL X MJ)
irWUtNLa 1-UK 7L -INUM YVA 1 1=1
)N ABOVE NEW BOX CULVERT
1. INSTALL CONCRETE DEAD -MAN BLOCKS ON EXISTING 12" WATER LINE ON
/ EAST AND WEST SIDE OF NEW BOX CULVERT, ALLOW 5 -DAY CURING TIME.
2. CUT IN 2 NEW 12" ISOLATION GATE VALVES, AND INSTALL 12" X 8" TEE
ON EAST SIDE OF BOX CULVERT. SHACKLE NEW VALVES AND TEE TO
/ 9 DEAD -MAN BLOCKS WITH 6- 3/4" SHACKLE RODS (TYPICAL).
CITY CREW WILL PERFORM CUT IN OF VALVES.
3. INSTALL TEMPORARY 12 -INCH END CAPS ON EACH SIDE OF EXISTING
12 -INCH WATER LINE.
4. INSTALL NEW 8" D.I. WATER LINE FROM NEW TEE ON EAST SIDE OF BOX
CULVERT TO EXISTING 6" WATER LINE IN PLANTING STRIP TO SOUTH.
INSTALL DEADMAN BLOCK ON EX 12 "W
CUT IN NEW: 5. PRESSURE TEST, DISINFECT, FLUSH NEW 8 -INCH LINE.
12 "X 8" TEE (FL X FL)
�1 - 12" GV (FL X MJ) 6. AFTER OBTAINING SATISFACTORY PURITY TESTS, CITY CREW WILL CONNECT
1 - 8" GV (FL X MJ) NEW 8 -INCH LINE TO EXISTING 6" WATER LINE ON SOUTH SIDE, AND
-1 - 12" ADAPTER (FL X MJ) WILL INSTALL NEW 6 -INCH TEE AND VALVES.
rxsN_- eLee_K-
T] -
ST _BL T - 7. CITY CREW WILL CLOSE NEW VALVES TO ISOLATE THE SECTION OF THE
_W_ 12_.01 W 12 -INCH LINE THAT WILL BE RELOCATED BY CONTRACTOR.
2 % 8. REMOVE ISOLATED SECTION OF EXISTING 12 -INCH WATER LINE AND
INSTALL NEW BOX CULVERT.
55' 8 "DI W > Ss - 9. INSTALL NEW 12 -INCH WATER LINE ABOVE BOX CULVERT, WITH 6 -INCH
a 0 EL= 62 THICK ETHAFOAM PAD UNDER 12 -INCH WATER LINE ABOVE BOX CULVERT,
00 oN�OM 18" E &w IE- 9.57 INCLUDING VERTICAL BENDS, TEMPORARY END CAPS AND BLOW -OFFS.
TV a "PVC S IE= SHACKLE ALL PIPES, FITTINGS, BENDS, END CAPS, WITH 6 -3/4"
—�L - SHACKLE RODS.
ROTECTTRI E 10.PRESSURE TEST, DISINFECT AND FLUSH NEW SECTION OF 12 —INCH
-- / WATER LINE.
11.AFTER OBTAINING SATISFACTORY PURITY TESTS, CITY CREW WILL CONNECT
NEW 12 —INCH WATER LINE TO NEW 12" VALVES AT BOTH ENDS OF BOX
V:E
RE ME R CULVERT AND SHACKLE PIPES TO EXISTING DEADMAN BLOCKS.
/ CONSTRUCTION NOTES
I EX.
3" I
IN
iZ _
io TO TRI
CALL 48 HOURS BEFORE YOU DIG
1-800-424-5555
)OMESTI01 METE
ATION M TER O CONTRACTOR SHALL REMOVE AND PRESERVE SIGN AND SMALL TREES AND
T (w_5 ) SHRUBS THAT INTERFERE WITH WATER MAIN WORK. PLACE ROOTBALL IN
TOWERS NE BURLAP OR CONTAINER AND WATER. REPLANT IN SAME LOCATION AFTER
WATER RELOCATION IS COMPLETED.
O2 REMOVE EX. 8" WATER AS NEEDED AFTER NEW 8" WATER IS COMPLETED
AND CONNECTED TO EX. 6" WATER FOR OFFICE BUILDING. PLUG AND CF
OPEN ENDS WITH CONCRETE.
O3 RELOCATE 55'1 NEW 12" WATER MAIN OVER NEW BOX CULVERT AFTER
BOX CULVERT IS INSTALLED.
EXISTING GRADE
4'6"± 3't 8' MIN.
8' MIN.
2T1 � 1T1 NEW 12 "DI PIPE I 5' MIN. ' 8't
NSPOOLS (TYPICAL)
LEG ^
LENGTHS AS NEEDED 18" MIN
EX 12" DI W
6 3/4" SHACKLE SPOOL SPOOL
RODS (TYPICAL) 12" SLEEVE (MJ)
4
DEADMAN BLOCK NEW 12" GATE VALVE
(TYR EACH SIDE) (MJ X MJ)
2- 12" 22 1/2 ' BENDS (MJ X ...
SHACKLE TO VALVE, DEADMAN BLOCK,
AND THROUGH ALL BENDS TO OPPOSITE
SIDE. (TYPICAL BOTH SIDES)
D- 211115
MOVE
12"
WATER
D- 211115
12" WATER MAIN RELOCATION
NOT TO SCALE
JIM
REVISION
-- SPOOL
6" THICK ETHAFOAM PAD
OVER BOX CULVERT
6 3/4" SHACKLE
RODS (TYPICAL)
M 111111=1
4
SHACKLE RODS (AS REQUIRED)
6 -3/4" FOR 12 —INCH PIPE
(SEE CITY DETAIL B089)
3" CLR
CONCRETE SHALL BE KEYED 12"
MIN. AGAINST UNDISTURBED EARTH
BOTH FACES
X12" PIPE
1.5' MIN.
I b.J \_ CLASS 5 1/2 SACK CONCRETE
3" CLR 3000 PSI MIN
EX 12" DI Al PLAN VIEW
#4 REBAR 8" O.C. E.W.
-- - CENTER IN CONCRET
SPOOL��
NEW 12" GATE VALVE LE-
DEADMAN BLOCK `O >
(FL X MJ) SEE DETAIL
12 "X 8" TEE (FL X FL) 6 3/4" SHACKLE ">
12" ADAPTER (FL X MJ) RODS (TYPICAL) 1 4--
6' MIN.
SECTION VIEW
RECOMMENDED FOR APPROVAL TYPICAL CONCRETE DEADMAN ANCHOR DETAIL B
By,_Daniet_Carey - -__ Date;_4 /9/07_- NOT TO SCALE -
By, ---------------- Date: --------
By'---------------- Date'------- -
By'---------- - - - - -- Date'-- - - - - -- AS—BUILT Ll — 1 O
AS SHOWN
Ho N,- XM ,su;,sa, CITY OF 4/6/07
RENTON VILLAGE STORM SYSTEM PROJECT Fl DBM:
RENTON ME
one ;NCX DATUM wuw"c no:
Al 11 I - Planning /Building /Public Works Dept.
;F..XE.. WATER MAIN RELOCATION
SfJiE ACNftgXGLY ��RR �! SHEE,: 7 " 12
NEW 4' X 6' BOX CULVERT
12" WATER MAIN RELOCATION
NOT TO SCALE
JIM
REVISION
-- SPOOL
6" THICK ETHAFOAM PAD
OVER BOX CULVERT
6 3/4" SHACKLE
RODS (TYPICAL)
M 111111=1
4
SHACKLE RODS (AS REQUIRED)
6 -3/4" FOR 12 —INCH PIPE
(SEE CITY DETAIL B089)
3" CLR
CONCRETE SHALL BE KEYED 12"
MIN. AGAINST UNDISTURBED EARTH
BOTH FACES
X12" PIPE
1.5' MIN.
I b.J \_ CLASS 5 1/2 SACK CONCRETE
3" CLR 3000 PSI MIN
EX 12" DI Al PLAN VIEW
#4 REBAR 8" O.C. E.W.
-- - CENTER IN CONCRET
SPOOL��
NEW 12" GATE VALVE LE-
DEADMAN BLOCK `O >
(FL X MJ) SEE DETAIL
12 "X 8" TEE (FL X FL) 6 3/4" SHACKLE ">
12" ADAPTER (FL X MJ) RODS (TYPICAL) 1 4--
6' MIN.
SECTION VIEW
RECOMMENDED FOR APPROVAL TYPICAL CONCRETE DEADMAN ANCHOR DETAIL B
By,_Daniet_Carey - -__ Date;_4 /9/07_- NOT TO SCALE -
By, ---------------- Date: --------
By'---------------- Date'------- -
By'---------- - - - - -- Date'-- - - - - -- AS—BUILT Ll — 1 O
AS SHOWN
Ho N,- XM ,su;,sa, CITY OF 4/6/07
RENTON VILLAGE STORM SYSTEM PROJECT Fl DBM:
RENTON ME
one ;NCX DATUM wuw"c no:
Al 11 I - Planning /Building /Public Works Dept.
;F..XE.. WATER MAIN RELOCATION
SfJiE ACNftgXGLY ��RR �! SHEE,: 7 " 12