HomeMy WebLinkAboutD-286206oilu
v
c
v
0
0
v
u
U
E
V
V
t
u
v
0
.3
E
V
.0
r
0
0
z
0
E
u
r
0
c
v
0
0
v
v
u
N
�o
t
C
D
U
Ir
qt
of
u
a
v
.r-
L)
v
0
N
�o
rn
Q
3
r
U
c
0
0
c
V
'c
0
0
0
c
.A
�b
0
0
t
E
XX�
�5
tc
SAME
J
00 L6
N 0
a.
a�
U V)
rl
C32
00 FlT
r-
w
Of
5
LJ
R
F- J 00
V)
°' r` w
J + W
W V)
w
V)
25
20
15
10
5
0
.
18 +00
�
Q
J
crY
J
0
m 00
W
~
W
J
0
C; LO
tp
Z et
W Lr)
Z
0
N
t0
t0
N
L&J p
U
()
(N
J
LLj
w
_j
H
M V)
*
(n
cr_
25
POND
20
* FLOW CONTROL STRUCTURE
0
0
rn
SEE
KCRS DWG 2--025
N
N
N
15 12"
DI A. RISER TOP ELEV.
24.00
1ST
ORIFICE: 5.0" DIA., I.E.
20.90
''
uj
-
Lj
-
2ND
ORIFICE: 3.0" DIA., I.E.
23.34
3RD
ORIFICE: 2.5" DIA., I.E.
2154
10
B2
C32
12" HDPE 0.539
13.2 LF 12" HDPE 7.579
119 LF
L
J
00
19 +00
J +
0 T_
N
_j
R 0 j2`
V) 74
w
00
t0
1.4 t0
W N
J
94 W
2 Of
to to
N N
5 .
W W
4W
50 +00 20 +00
n
ENGINEERING— STREETS— WATER— SEWER— PARKS— BUILDING-
�_
1908
[ 0st Somd on OW M y 10 &3" a Gj OOM Dy HWW104 F.o No" 0 W" �40"4 j C" IdmW < <- J6. diV Sc 10
21+00
J
N 00
000 N
W + J
N W
Q
m N cr_
21
C32
Li 0
� J
W
Q
J
0 O
� O
(n
o ao
a r'i
C6 00
U ±
N
V Q
W V)
20+00
25
20
ADPE 0.889
15
10
5
0
25
---------------------------
h- -- -----------------------
B3 22 20
C C32
3.5 LF 12" HDPE—j 55 LF
2.859 '...
EXPOSE TOP HALF
R OF PIPE AND
BACKFILL WITH
25.0 LF N CDF TO TOP OF
N SUBGRADE
N
7
N W
N
w
N' N
N N
NN R
W W
22 +00
by I ° °`• CONSULTANTS
designed I MD 1 2/20/01
drown 8JA 2/20/01 33301 9TH AVENUE SOUTH
checked GIP 2/20 /01
FEDERAL WAY, WASHINGTON
proj on CCW 2/20/01 BERGER/ABAM 98003 -2640
pro j dir GIP 2/70/01 E ` S ` E I ' ' " ` VOICE: (206)431 -2300
field bk no FAX: (206)431 -2250
ROLL 20.�
15
A
5
n
36 "0 GAS CASING
TEMPORARY SHORING
a
1
] \4�
:NCHED)
A STA 13+ 39, 55' LT
END CASING
-SOLDIER PILE
:--AUGER PILE
SOLDIER PILE
FASCIA PANEL
GAS CARRIER PIPES (BY QTHERS ) '-
A STA 12 +949 8' LT CDF BACKFILL
BEGIN CASING
CDF BACKFILL, CDSM OVERLAP
1 0
G�
� EDGE OF SEAL"
pm
GAS CASING INSTALLATION WITHIN
C3, SCALE: 1 M =zo' LIMITS OF CDSM
APPROX LIMIT 30 -
PROPOSED FINISH GRADE
r
OF CDF /CDSM. _ _ � � � EXISTING GRADE
SEE SHEET S10.
STA 12 +940 8' L _ 8 "0 D.I. WATER MAIN CROSSING
BEGIN CASING 12 "0 D.I. WATER MAIN CROSSING
TOP ELEV 19.9'
20
- STA 13 +39, 55' LT
END CASING
TOP ELEV 19.0'
6" MIN, TYP
PROVIDE ETHAFOAM HS -600
65 LF 36 "0 GAS CASING PLANK FOAM BOARD OR
GAS CARRIER PIPES EQUAL AS CLEARANCE
(BY OTHERS) SEPARATION
io
z GAS CASING PROFILE-
SCALE: 1 " =20' LOOKING NW
TEMPORARY SHORING
PROPOSED BLOCK WALL EXISTING GRADE
FINAL GRADE
EXCAVATION LIMITS
GAS CARRIER PIPES (BY OTHERS)
GAS CASING
EXCAVATE & 5' CDSM IN OVERLAP A SECTION A—A
BACKFILL IMINI - SCALE: NTS
W /CDF
TEMPORARY SHORING
GAS CASING EXISTING GRADE
GAS CARRIER PIPES (BY OTHERS)
EXCAVATE &
BACKFILL W /COF
23 +00 5' MIN
DRAINAGE PROFILE
SHEET 2
SOLDIER PILE WALL
FINAL GRADE
Exca,vAnoN e SECTION B—B
LIMITS _ SCALE: NtS
-2'MIN OVERLAP
CDSM
SOUTH 180th STREET GRADE SEPARATION
FR ��
124
�1'RECORO COPY
x* AOOENDUM NO. 3
no i date, revisions
r
-= x8c,02
C36
sheet 38 of 144
job no A00084
scale 10=200H, 1 "= 5' V
dote 20-Feb -2001 /
5-
41
C' V -�
w
v:
z
C, C
c
J
:E
^N
'L
•r
X
c
�N
4