S-206305
S -3A" L_ 0 2' -2Yz° PLAN VIEW TOP OF VAULT ® 23'00 II � 3' -6" (Tire) 0 00 0 s ^! SUGGESTED PIPE AND PUMP INSTALLATION SEQUENCE: 1.) THE LIFT STATION RECEIVES A MAJORITY OF FLOW FROM THE OPERATION OF THE FLUSHING STATION. THE FLUSHING STATION OPERATES WHEN A TIMER SWITCH TRIGGERS IT TO PUMP LAKE WATER INTO THE COLLECTION SYSTEM PIPE WHICH DRAINS INTO THE LIFT STATION. COORDINATE WITH CITY OF RENTON SEWER MAINTENANCE PERSONNEL TO HAVE THE FLUSHING STATION NON— OPERATIONAL DURING CONSTRUCTION HOURS. THE LIFT STATION MUST BE OPERATIONAL DURING NON— WORKING HOURS. 2.) EXPOSE EXISTING 6" SEWER FORCE MAIN. INSTALL WYE TO TAP PIPE. CONNECT TEMPORARY DISCHARGE PIPING WITH ISOLARON1 AND CHECK VALVES. 3.) ASSEMBLE TEMPORARY PUMPING COMPONENTS AND BACKUP EQUIPMENT. SEE TECHNICAL SPECIFICATION FOR REQUIREMENTS. TEST OPERATION OF TEMPORARY PUMPING SYSTEM. REMOVAL OF EXISTING PUMPS SHALL NOT BEGIN UNTIL TEMPORARY PUMPING SYSTEM OPERATION HAS BEEN DEMONSTRATED TO THE ENGINEER. 4.) REMOVE EXISTING PUMPS, PIPING, AND ELECTRICAL EQUIPMENT FROM LIFT STATION WET WELL. PLUG END OF FORCE MAIN AT WET WELL TO PREVENT BACKFLOW. 5.) INSTALL MECHANICAL VALVE VAULT, RETAINING WALL SYSTEM, ELECTRICAL POWER AND CONTROL SYSTEMS, AND PIPING FROM WET WELL WALL THROUGH MECHANICAL VALVE VAULT TO THE FORCE MAIN CONNECTION. 6_) CLEAN WET WELL AND CONSTRUCT NEW FLOOR, RISER, AND TOP SLAB. COAT INTERIOR OF WET WELL. 7.) INSTALL RAIL SYSTEM, SUBMERSIBLE PUMPS, AND DISCHARGE PIPING IN WET WELL. &) CONNECT DISCHARGE PIPING TO EXISTING FORCE MAIN AND TEST OPERATION OF NEW PUMPING SYSTEM. 9_) AFTER TESTING IS APPROVED BY ENGINEER, NEW PUMPING SYSTEM MAY BE USED BY CONTRACTOR TO OPERATE LIFT STATION WHILE COMPLETING THE REMAINDER OF ITEMS FOR THIS CONTRACT. PROPOSED CONCRETE RISER AND COVER °- CENTLRLNE OF VAULT SUMP DISCHARGE PIPING PIPING LEGEND 1W DIA_ PIPING, ROUTE COPPER PIPING FROM VAULT SUMP PUMP eL -a CENTERLINE OF WET WELL TO WET WELL WALL, USE PVC PIPING INSIDE LIFT STATION. _19.30' Q Q 0 Q i i:i �7 — PUMP DISCHARGE PIPING END DISCHARGE 4 FEET ABODE WET WELL F100R_ SECURE PIPE t, TO LIFT STATION WALL WITH PIPE HANGERS- El ') I HYDRAULIC SEALING FLANGE WITH RUBBER DIAPHRAGM EXISTING CONCRETE WET WELL SEALING GASKET ( L� Q 4" DI 90' LONG RADIUS DISCHARGE BASE BEND (FLxFL) BOTTOM OF VAULT 1 _ - C ' O WITH BASE PLATE AND S.S. FASTENERS € R . 3 1� III 0 OD 4" DI 90' BEND (FLxFL) € 1 ) IL <D NOT USED BOTTOM OF SUMP PIT 1� r ( '® Q 4° FLANGE COUPLING ADAPTER c © 4° COUNTERWEIGHT SWING CHECK VALVE (FLxFL) QH 4° GATE VALVE (FLxFL) OBLIQUE VIEW 4° DI TEE (FLxFLxFL) 1" — 2' -0" JJ 4" DI SPOOL (MJxMJ), APPROX. LENGTH = 4' -6" SEE DWG_ GRATING O. C1 SYSTEM' EQUIPMENT LEGEND EXISTING PIPE > I SEE DWG. N0. C14 FOR DETAILS. OK 4° COUPLING ADJUSTABLE PIPE SUPPORT, BOLT TO FLANGE, EQUAL TO STANDON. j �I QM 4" DI SPOOL (PExPE), APPROX. LENGTH = 3' -3" 01 SUBMERSIBLE NON —CLOG SEWAGE PUMP ® EXISTING 8" PIPE STUB € ) s QN 4" DI SPOOL (FLxPE), APPROX LENGTH 11' -7" OO PUMP REMOVAL RAIL SYSTEM WITH PUMP CARRIER GUIDE BRACKET EXISTING 8" INLET PIPE QO AND LIFTING CHAIN ATTACH LIFTING CHAIN TO PUMP CARRIER GUIDE 4" DI SPOOL (FLxPE), APPROX LENGTH 2' -6" BRACKET AT ONE END AND HOOK TO TOP SLAB OF WET WELL AT OTHER REVISED TO CONFORM t 4" DI SPOOL (FLxPE), APPROX. LENGTH = 2' -6" END WITH S —O" OF SLACK CHAIN. SECURE RAILS TO TOP SLAB AND TO CONSTRUCTION RECORDS l E r GRATING FRAME NTH S.S. FLAT BAR, ANGLE, AND BOLTED CONNECTIONS. 4" DI SPOOL (FLxPE), APPROX. LENGTH = 1' -2" [ ti 4" DI SPOOL (FLxPE), APPROX. LENGTH = 3' -0" Q3 SUMP PUMP EQUAL TO PACO PIP 7020 RH2 ENGINEERING P.S. DATE I� QS I'/," BRASS UNION ® LEVEL TRANSDUCER AND FLOAT SWITCHES SUPPORTED FROM L T ( t j s ® 829, CENTERLINE OF C) 1?5" BRASS SWING CHECK VALVE RACK ATTACHED TO I —BEAM. PROVIDE PROPER CLEARANCE LEVEL SET POINTS j e — — UNUSED PIPE STUB FOR LEVEL TRANSDUCER AND FLOAT SWITCHES TO OPERATE CORRECTLY �U 1W BRASS GATE VALVE 50 FEET OF -Y4" FLEXIBLE HOSE AND NOZZLE ON WALL MOUNTED RACK. COUPLING, COPPER TO PVC 45,20643 ® (2) Ya- DIA. TIE RODS, EMBED INTO CONCRETE NOTES: L BLOCKING OUTSIDE VAULT WHERE SHOWN. CORE DRILL ALL PENETRATIONS THROUGH EXISTING CONCRETE WET WELL. GROUT WATERTIGHT AFTER PIPE INSTALLATION. HIGH LEVEL ALARM 6.50' 3&" HOSE BIB, 2' -0" ABOVE VAULT FLOOR. PLUG EXISTING DISCHARGE PIPE PENETRATION WITH GROUT TO PROVIDE WATERTIGHT SEAL. INTERIOR SURFACE OF GROUT Q7 'e TO MATCH SURFACE OF EXISTING NET WELL. (D 4" DI 90' BEND (MJxMJ) SANDBLAST INTERIOR WALLS OF WET WELL AFTER EQUIPMENT REMOVAL AND BEFORE INSTALLATION OF NEW PUMPING SYSTEMS. 5.69'_ _ j ! I INV. ELEV. INTERIOR SURFACE OF CONCRETE WET WELL SHALL BE EXAMINED BY THE ENGINEER BEFORE INSTALLATION OF CONCRETE, CENTERLINE OF INLET '_ _ _5.60' NEW 8" PIPE TO MANHOLE COATINGS, AND PUMPING SYSTEMS TO EVALUATE STRUCTURAL INTEGRITY OF EXISTING CONCRETE. PUMP START 5.20' ©� © ® SEE DWG. NO. C12 FOR CONTINUATION OF FORCE MAIN M` SCHEDULE B ONLY CITY OF RENTON — 1992 LIFT STATION IMPROVEM 1.40' I'r' x SCHEDULE A: COTTONWOOD L.S. REPLACEMEN' LEAD /LAC PUMP STOP _ _. of Fsx. SCHEDULE B: LAKE WASHINGTON L.S. #2 REHABILr ,`' <`' cam owc rvo. �.B No. LOW LEVEL ALARM 'r 9 r.� A F M11 191.068 M E HAN I p L WET WELL BOTTOM 0'50 >t /1 - 16727 +s sii s s: it I � � �.s. ELEVATION VIEW RF�rsTERQ9 KKR PLAN AND DETAILS A v SIGNED: 1�� ^� M11 Sioxv. 10/09/92 - I I �`�i i;ti � I uc i ifm 0 ADDENDUM 1 MLM DRE 9/26/92 WIMP- /I�LO�.3 1" — 2'-0° uds rti w,s s s s li BxPSaes e/z/sB _ _ I LKWSHD6 TVP DRE SHOWN OCT 03, 1994 24 1 Al I I I I I I I A I I I Y I A I I 1A II II i I g I ' I I I