HomeMy WebLinkAboutS-20630ALOW WET WELL LEVEL — ° ° ° ° ° ° ° ° °
NEW SIGNAL WIRE TO BE CONNECTED FROM THE
CONTRACTOR TO CONNECT TO CORRESPONDING NEW
PUMP FAIL —
FIELD DEVICES FOR REMOTE ALARM ANNUNCIATION.
(TYPICAL)
I WET WELL CONTAINMENT LEAK — - ° - ° - ° ' ° ' ,
❑❑
I
CONNECT WET WELL CONTAINMENT LEAK SENSOR IN
I INTRUSION — ° ° ° ° °
PARALLEL NTH INTRUSION ALARM. THIS CONNECTION
i I
FOR COTTONWOOD LIFT STATION ONLY.
HIGH WET WELL LEVEL — ° ° ° °
I
EXTEND UNUSED ALARM WIRES TO TELEMETRY ENCLOSURE.
PUMP NO. 2 RUN —
I I
LABEL AND TAPE EACH IRE FOR FUTURE CONNECTION.
( --- —��- - -I - -- —
PUMP NO, 1 RUN
— —
LINE
POWER
1
I------------ - - - -L-1 T T T T
II
1 1
❑ ❑ ❑
❑ ❑
I I I
1
EXISTING TERMINAL BLOCK FOR
j
EXISTING MASTER CONSOLE CABINET
I I
CONNECTION TO FIELD DEVICES I
LOCATED AT THE RENTON CITY SHOP
I
I
❑❑
❑❑❑
(3555 NE 2ND ST.).
120 VAC POWER SUPPLY
EXISTING RTU — MOUNT IN ELECTRICAL
ENCLOSURE. SEE DWG. E02 & E14 FOR
LOCATION.
I —I
I I
I I
I— — -------------------- - - - - --
EXISTING LINE PROTECTION UNIT
EXISTING DEDICATED TELEPHONE LINE
COTTONWOOD LIFT STATION
ALARM PANEL SECTION_ CHANGE
ENGRAVING ON INTRUSION LIGHT.
EXISTING REMOTE TELEMETRY UNIT SEE DETAIL A THIS SHEET.
NTS
F -
EXISTING LINE PROTECTION UNIT I EXISTING EQUIPMENT AND LOGIC —
I � DO NOT DISTURB.
I
I 5T
EXISTING DEDICATED TELEPHONE LINE /— I TONE RCVR r - -- - - -�
l I LINE FAIL
uFr srnnoN
I
I POWER FAIL P R R C I I I
I C E INTRUSION WET WELL CONTAINMENT LEAK G N PUMP 1 ANE Poems
G RUN FAIL FAIL I
N E HIGH WET WELL LEVEL A R PUMP 2 IN1a/ "
I WEr
N I M O I I RuN EAK �
E E PUMP NO. 2 RUN M L I I
I R R PUMP N0. 1 RUN B E /- SEE CONSOLE MODIFICATION
I I Imo/ THIS SHEEL
L R
E I I GE RIM GE RIM
I I I I
I I I I
I I I I
I I I
I I I I
I I I I
I I
I I
L —
J
TYPICAL HEADQUARTERS CABINET BLOCK DIAGRAM
NTS
p H.
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
4.F
16727
RH2 ENGINEERING P.S. DATE OIpsxe "`°�i SIGNED:
NAL
WW/� —// — 2063' 0o /o7 /sz
EXPIRES 8/2/96
EXISTING HEADQUARTERS
CABINET
NTS
NEW SIGNAL WIRE TO BE CONNECTED FROM THE
NEW FIELD DEVICES TO THE EXISTING SIGNAL CHANNEL.
❑❑
❑❑ ❑❑
❑❑
I i
COTTONWOOD LIFT STATION
❑ ❑
❑ ❑ ❑ ❑
❑ ❑
WORK TO BE PERFORMED THIS CONTRACT.
I
I I
I I
O
O
a
I PUMP 1
LINE
POWER
❑ ❑
❑ ❑ ❑
❑ ❑
RUN
PUMP 2
FAIL
INTR/
FAIL
j
❑❑
❑❑❑
F-1
-HWET
RUN LEAK WELL
I
I
I
❑❑
❑❑❑
❑❑
GE RTM
GE RIM
�
❑ ❑
O o
❑ ❑ ❑ ❑
a
❑ ❑
I
� CHANGE ENGRAVING
TO MATCH.
❑❑
❑❑ ❑❑
❑❑
❑ ❑
❑ ❑ ❑ ❑
❑ ❑
L
1:11:1
0 0
❑ ❑ 1:11:1
0
❑ ❑
CONSOLE MODIFICATIONS
FD
❑❑ ❑❑
❑❑
TN
COTTONWOOD
❑❑
Fl L-1 ❑❑
11 [-1
NTS
8a;
❑ ❑
L_ ❑IL j
EXISTING HEADQUARTERS
CABINET
NTS
SCHEDULE A & B
IA i I I I I AI I I I Y I I I A I A ! A I A I I I Y I I 1 IX I 1 I 1 I
NEW SIGNAL WIRE TO BE CONNECTED FROM THE
NEW FIELD DEVICES TO THE EXISTING SIGNAL CHANNEL.
NEW WET WELL CONTAINMENT LEAK SIGNAL WIRE TO BE
® ®
® ® CONNECTED IN PARALLEL WITH THE INTRUSION SIGNAL
WIRE TO THE EXISTING CHANNEL.
I --
I
'I
I
WORK TO BE PERFORMED THIS CONTRACT.
I
I
L - - - -
I
--
NOTE: SEVERAL COMPONENTS IN THE MASTER CONSOLE ARE NOT SHOWN ON
THIS PLAN.
SCHEDULE A & B
IA i I I I I AI I I I Y I I I A I A ! A I A I I I Y I I 1 IX I 1 I 1 I