Loading...
HomeMy WebLinkAboutS-221803SCALE: 1 " =40' _- - _ -- - _ - J � , 1 � 2 FF__. t I r V'9 R R -, I L" ` Lu I ' • I - r - CL - - - GYMNASIUM 1 I MANHOLE No 3 .2 FINISH FLOOR 1 0 ELEVATION= RIM = 43.50 : - 442.69 }_E o,. IN= T 38a5� REMOVE ST UH I -- - I - CO 3 f W i = 3 - , ., 4, =404 1 F IE 4" 10 IS` 6° PVC V 1.00 N REMOVE EXIST SANITARY j % F 8 PVC G PIPES { 11 I i 455 LF 0 SEWER � PLUG [ - 0 4 FINISH FLOOR ELEVATION= 446.62 4 WYE I E%` =42.84 F > FINISH FLOOR i 'I 1 I MAh`A-IOLE No 2 48 °*I MANHOLE No 1 48 "0 I ELE VAT ON _ - .64 RIfA-= 45.66 1 RIM = 45.88 c4.z - - _ _ I E 4 - 39.80 1 - 9 _ 7 IN - I $ = 7 ?69 c4 , 1 - 37.34 E 205 LF OF 6" PVC -CO o 2 4 j S E FT C vr` IE IN 37 2 E $° IN E _ ° OUT 3 TE MAI 3 t q" r 8° OU 7. 17 S @ 1.0% [�= 39.39 C4.2 i TYP jJy� 4 104 L OF 8° PVC - - - FOR I \ , y� n '4 ° WYE C N -- CO No E 38 "• :1 ; TO PORTABLE r' i 1 _ I� - \ IE -4 00 r J CO 3 30 LF'OF 4° PVC ,- „•tu. v_ T Svlf�Yr~Y _ '1 � ° PROTECT EXIST TREE ROOTS DURING i `t 4g, WYE '; - 1 INSTALLATION OF SANITARY SEWER., -� si r ,t., • - - TUNNEL AS NECESSARY. _ _�iII ��� Nrl atS:dl I�1• 90 LF fOF 8' -- s SANITARY./ SEWER NOTES &, SPECIFICATIONS : PVC @ 0.4% i. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STA' ARC' SMALL TAKE PREC£B£NCE OVER ALL OTHER PLANS, r / PLUG EXIST LINE \ . _ 1 AND SPECIFICATIONS 6F THE CITY OF RENTON AND THE LATE EDITION 9. A COPY OF THESE' APPROVED PLANS M$T 13E ON THE JOB SITE WHENEVER' OF THE WSflDT1APW/STANDARDS AND SPECIFICATIONS. CONSTRUCTION IS IN PROGRESS. _ °_ i - CONNECT NEW 8" 2_ THE MRS OF WORK IN THE $JREET RIGHT -OF -WAY SHALL. BE L6TEO TO 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL � TO EXIST MANHOLE &3(O A M. 70.3:30 P.M. ON VIE EKDAYS U . ESS OTHERWISE APPROVED IN DRAWIIIG OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND ! ? IE = 36.81 7' j _ . WRITS BY THE TRANSPORTATION DIVISIB6N AT 2T7 -6222. ALL STREET SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED' PROFESSIONAL AS f WELL A$ PLACEMENT AND COMPACTION OF REOU#tED -f _ it 4 �'J _ CLOSURES, PARTIAL OR 'FULL, SHALL BE APPROVED BY THE TRANSPORTATION SURVEYOR. BEDDING MATERIAL, T,p UNIFORM GRADE' SO THAT THE ENTIRE = / " 24 H__!Il$IS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND i.BACKF�L' SHALL "BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNORMLY_ TiF 24 NO RS- IN ADVANCE. LAYERS WITH A- LOOSE AVERAGE DEPTH OF -6 INCHES, MAXIMUM DEPTH DENSE UNYIELDING BASE PIPE BEDDING SHALL BE PEA GRAVEL I^ 9I SHALL BE NO OED U,, 6� ABOVE BELOW THE P 3. ALL CONSTRUCTION SHALL BE IN !ACCORDANCE WITH 'STANDARD 8 INCHES. THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF V 16. SANITARY SEWER PEE -SHALL BE POLYVINYL CHLORIDE (PVC) SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTOr PREPARED MAXI:KI�i'- DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE RUBBER GASKETED ASTM D 3034, SDR 35. BY IIAS- NNGTON STATE >, 5- �r T ,r o nr no TA T- eI - � THE SE CHAPTER AMERICAN PUBLIC', WORKS ASSQC7ATION, PWi flfAi T£R:'vR Lxc]a me rc �a,. ,v ,� 17. IN PAVED AREAS. MANHOLE COVERS MUST SLOPE TO MATCH i7ATf3i F TIiPI (APWAI'/INB DTI! Sr !°lE4.Iic"�.-�MCkATK .`- TT TE4 ALS TO COMPLETE _THE FILL OVER PIPE SHALL BE THE PAVING SLOPE. 4. ALt�: OC,A116NiS' )F EXISTiNiG 'UTK ITES SHOWN ARE APPdtOXIiI1; ,AND -.IT AS' DI SCRIBED. _ SHALL BE THE CONTRACTOR'S RESPONSBN.ITY TO VERIFY THE TRUE AND 12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED CORRECT LOCATION SO A$ TO AVOID DAMAGE OR_DISTURBANCE. ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY �5 e�� \�/ `? S. A Pf!€MTRUCTION CONFERENCE - AND A 24 HOUR- =-NOTE SCALE -BE - REQUITED COMPACTED. CUTS WO THE EXISTING ASPHALT SHALL BE NEATLINIE CUT ��1ft�e�Re o�AwINS PRIOR TO STARTING NEV CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE o c osc2srs6 ITV 4 O SECU � NECESSARY PERAtlTS PRIOR TO' STARTING PLACED gIMEgAT£LY AFTER BACKfILL AND COMPACTION. A PERMANENT CITY OF RENTON CtONISTRUCT ,N�SPECT BE ACCOMPLISHF BY A;, _ . A FOOT YD(: A70 SHALL BE PLACED WITHIN IO DAYS AND SHALL BE PER . THE CITY OF HENTUFll SHALL B£ THE CONTRACTOR'S Y CITY OF - R£NTON CURRENT STANDARDS. ELEVATION DATUM -CITY OF RENTON - 9f o B B oEPOUtrsaENT of PUBLIC WORKS jer ADVANCE OF BACKFILLM ALL 13. DATUM 'SHALL BE CITY - OF RENTON, U.S.C. AND G.S. BENICH MARK - RAILROAD SPIKE tfii U7EITY POLE. 0S' �ssi �srE� � K """ SIERRA I�®$�$�S ELEIMBVTARY SCI�IOOL ' i�lCTIONr WALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE UP ON NORTH SIDE OF POLE -003. AT THE S.W. CORlER .� ,r TCWT NOTIFY IS SOLELY'SRE dMSIBI.E FOR THE MEANS. METHODS AND STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE OF THE INTERSECTION OF N.E. 18TH ST. AND SHELTON �s f WATER UTWTY P�AIV 40 EROSION AFTER THE COMPLETION CONSTRUCTION. AVE. N.E. PER CITY 8F RENTON ,FIELD BOOK 588, PG. SITE WASTE SS CONSTRIIC SON A,lVlli FOR THE SA €ETV OF 1MOtIf£RS AND �. PI VENT TEENANCES SHALL BE LAO ON' A PROPERLY PREPARED 61 62.'CffY OF pENTON' BENCf1 MARK '192- Assam DLB �diN rTHE ONST( 10N= $ E. PPE Ia%a 2 -28 -95 "A wry. s� "" O£ THE P OF THE CONTRAC fqi TO OBT#/i STREET USE PREPARED FOUNDA,TDN IN ACCORDANCE WITH SECTION ' 7- 17.300 OF THE BENCH MARK ELEVATION - 42954 1 u- w >_..:.. „, AMY OTHER RE�.ATED 'PERMITS PRIOR' T:O,ANY CONSTRUCTION, CURRENT -STATE OF WASHMTON STANDARD SPECIFICATIO�iSS FOR ROAD AND LIES eooa r+>a+ APPROVED BY 7H€ CITY OF RENTON DEVELOPMENT SERVICES DIVISION,' BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF, THE ' sr rwa o� �rraoas w sw�r. c:a ar. d .zo �y� , Sha.../, 31% 24 - „ I ,L 157