Loading...
HomeMy WebLinkAboutS-22630B70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 ST 12 +_'5, 11.0' RT r EDGE OF PAVEMENT WITH CURB ISTA 12 +25, 13.0' RT 260.00 250.00 240.00 is 260.00 250.00 240.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 STA 12 +75, 12.6' RT STA 13 +00, 13.0' RT EDGE OF PAVEMEN -T WITI+ CURB AND 3 BLOCK HIGH 260.00 / I 260.00 250.00 ASPHALT DISPLACED EAST OF CRACK. 250.00 NO REPAIR REQUIRED, TYPICAL. CRACK R/W 260.00 1 BLOCK HIGH WALL 260.00 240.00 ASPHALT DISPLACED EAST OF CRACK. 240.00 R/w NO REPAIR REQUIRED, TYPICAL CRACK 230.00 I STA = 13 +00 230.00 thtw� - e NOTES: GROSS SECTION .CENTERLINE IS APPROXIMATE CENTER OF EXISTING ROADWAY. FOR PAVEMENT PATCHING, REFER TO ASPHALT PAVEMENT PATCH DETAIL /SHEET 6. FOR PAVEMENT EXTENSION, REFER TO ASPHALT PAVEMENT EXTENSION DETAIL /SHEET 6. FOR TRENCHES, REFER TO TRENCH DETAIL /SHEET 6. FOR 8,LOCK WALLS, REFER TO BLOCK WALL DETAILS /SHEET 6. CROSS SECTION INFORMATION NOTE. PAVEMENT AND CURB WORK DELETED FROM CONTRACT SCALE: r' = 10' ASC.SC�- �1s oT aesy� Q �e4 REVISED TO CONFORM e o TO CONSTRUCTION RECORDS q MARK MILLER 10/24/00 2220 0 + ISTO' ti SIGNED:' RH2 ENGINEERING INC. DATE StONAL 06112198 EXPIRES 9/21 /00� r r I STA 12 +75, 12.6' RT EDGE -OF- PAVEMEtVF WLTH --CURB AND 3 BLOCK HIGH WALL STA 12 +00, 4.4' RT r 260.00 260.00 - EDGE OF -PAVEMENT WITH CURB II STA 12 +00, R IW R/W 260.00 1 BLOCK HIGH WALL 260.00 250.00 ASPHALT DISPLACED EAST OF CRACK. 250.00 NO REPAIR REQUIRED, TYPICAL CRACK 250.00 I I + 250.00 240.00 -- _ 240.00 RiW R,IW I STA = 12 +75 240.00 S T T A 240.00 - 12 +00 230.00 230.00 230.00 230.00 SEA 12 +50, 14.0' RT - EDGE-Of- PAV€M€NT -W14H -CURB AND 3 BLOCK HIGH WALL RIW 260.00 R/W 260.00 ASPHALT DISPLACED EAST OF CRACK. 260.00 EXTRUDED-CURB -- 260.00 250.00 NO REPAIR REQUIRED, TYPICAL. CRACK 250.00 250.00 f 250.00 240.00 240.00 R/W RAW STA =' 12+50 to 308 240.00 STA = 11 +75 240.00 230.00 � / ,-Now - 230.00 230.00 230.00 220.00_ 220.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 thtw� - e NOTES: GROSS SECTION .CENTERLINE IS APPROXIMATE CENTER OF EXISTING ROADWAY. FOR PAVEMENT PATCHING, REFER TO ASPHALT PAVEMENT PATCH DETAIL /SHEET 6. FOR PAVEMENT EXTENSION, REFER TO ASPHALT PAVEMENT EXTENSION DETAIL /SHEET 6. FOR TRENCHES, REFER TO TRENCH DETAIL /SHEET 6. FOR 8,LOCK WALLS, REFER TO BLOCK WALL DETAILS /SHEET 6. CROSS SECTION INFORMATION NOTE. PAVEMENT AND CURB WORK DELETED FROM CONTRACT SCALE: r' = 10' ASC.SC�- �1s oT aesy� Q �e4 REVISED TO CONFORM e o TO CONSTRUCTION RECORDS q MARK MILLER 10/24/00 2220 0 + ISTO' ti SIGNED:' RH2 ENGINEERING INC. DATE StONAL 06112198 EXPIRES 9/21 /00� r r I