Loading...
HomeMy WebLinkAboutS-2722214 N o N L Ln W 06 Ln " O F- m N Ln ui � Lu Ln Lu 1 +70 W LU Q CI- L~L.I c Lu m Ocr_l V) - MH ,fF20 af W� - W Q w _ cn Lu Z — co a m o d y o — -- - - -. -_ - - -- - 24 °H20_ - z 0 0 0 — �< -- b- - - - - -- -- -- _- -- ` i ; { 1130 WN as \ -,E 559.62' N01'20'03 "E P a 3, I?.ii -- -�-- -- _ O p l 1 Conc. Walk °LLO NOTE.• WORK ON BURNETT AVE S, BETWEEN S 3rd ST AND S 4th ST MUST BE s COMPLETED PRIOR TO SEPTEMBER 15, 1999. tCKD .�, AS -BUILT CERTIFICATION I HEREBY CERTIFY THAT THE HORIZONTAL AND VERTICAL CONNECT EXIS77NG SIDE SEWERS TO NEW MAIN C� c� LOCATIONS OF THE SANITARY SEWERS SHOWN HEREON NO SIDE SEWER REPLACEMENT REQUIRED /N r ARE THE RESULT OF OF A FIELD SURVEY MADE BY ME OR UNDER MY DIRECTION- BURNETT = BURNETT AVE S. a 722121 m� a ci® �I �1 `Aaz LAO _ > _ �,�,�,� F.D. RINGEL L.S. 23613 DATE: u 66 +00 65 +00 64 +00 63 +00 62 +00 61+00 a ------------------- - - -------- - - - 61 +61, 10.2RT --- -- ............ 66 +22, 12.4RT - - - - - -MH f2O STA '6E+78,- �9:J1BT c - MK 19 STA 64 -F26, 10.35 RT -_ - - - - - AD: 18 STA Sf�- 9:9y -R.L REMOVE EXISTING MH AND o : : : : REMOVE EXIS77NG MH AND R/M FLEWS MH38.35 - - - - - - ¢ - REPLACE WITH NEW 54" MH REPLACE VATH NEW 54" MH - - - - - - - 0 o w RIM EL = 38,.5t 38.68 : ° : : : : : : RlAf EL = 38.34 38.51 - - - : - - - IE 8" (N) = 3298 33.15 - - - ° IE 8" (S) = 3289. 33.00 - E 8" {N). _ .39.'48 34:73 ............. IE 8" iN) - 34.12 33.95 .- ......o ......... ... o /E 8° S = .34-62 33-8 5------------------------- ---'-----'--- -.........---..... .........................----. .......- .... ---.. _................. .....- ...... y IE 8" (5) _ -34.63 �) ° - o EXSTING SURFACE ELEVATION 40.. .. .. - - - - - -- - -- - - - -- - - - - - -- .. .......... .........: a ° _ 0 ...... G. - - - - - - - - - - - - - - 0 - - - 35 REMOVE EXISTING SEWER - - - - - - - _ - - _ w - -- - - - -- -- - -- - -- -- ..... - ......... .....5 __ Z - - -- ° l%JQLFB° PVC ®�42 -- - - REMOVE E %IS71NG SEWER 0 0.35% 3 O I EX.SSS 35.1± TA 66 +45.73.10.8 t2T - �7 R M ELM= 38 60 4 +25.66, 10.35 :RT - - - - 266 - '26% - - : .W LF OF 8" CURED -IN -PLACE LINER LF B" PVC ®0.49 .......RIM = - ...... .. - ...... _ ...... .. __ _ _ _ 0 HORIZ {'IP£ EL 38. 8 .........:................ ........ ............................... ..........----------- . _ .. --- - - - -- --- ----------- --- - .- ......:..............- - - - -:- :.........:... B ND SEE D TA--- -T ....:.---.... .....3 -IE 5 =- 34.3 - - - - SCALE - - IE N = 34.3 - - - - - - - - SSAMHOSTA 61+12, 19.85ERT - (�n RIM EL = 38.04 Horiz. 1" _ .20' ° - " Jo Vert. 1" = :5' E (N & s) = 32s a a SHEET 12 wwp.� .a�at \—T27 \\ - 2 SCANNED JUL 2 7 2001 ROLL 173 098 T I N \ G I I im I I #340 BURNETT AVE S\ \\ I ABANDON 3P Ln 0 114f° ® I N 1 +17 .29 1 +09 0 +47 Q 2 +41 - 2 +28 1 +94 1 +31 1 +26 0 +85.5 ° a 4 "H20 ® Conc Walk ' "- - .— _ — — MH #19 x o j URNETT AVE ° NOi'27'04 "E oo 560.32' - —'-}'" - -------- I-- 1 +02 _.___- - q - — - — MH X18 - 8" PVC L_-0 y o — -- - - -. -_ - - -- - 24 °H20_ - z 0 0 0 — �< -- b- - - - - -- -- -- _- -- ` i ; { 1130 WN as \ -,E 559.62' N01'20'03 "E P a 3, I?.ii -- -�-- -- _ O p l 1 Conc. Walk °LLO NOTE.• WORK ON BURNETT AVE S, BETWEEN S 3rd ST AND S 4th ST MUST BE s COMPLETED PRIOR TO SEPTEMBER 15, 1999. tCKD .�, AS -BUILT CERTIFICATION I HEREBY CERTIFY THAT THE HORIZONTAL AND VERTICAL CONNECT EXIS77NG SIDE SEWERS TO NEW MAIN C� c� LOCATIONS OF THE SANITARY SEWERS SHOWN HEREON NO SIDE SEWER REPLACEMENT REQUIRED /N r ARE THE RESULT OF OF A FIELD SURVEY MADE BY ME OR UNDER MY DIRECTION- BURNETT = BURNETT AVE S. a 722121 m� a ci® �I �1 `Aaz LAO _ > _ �,�,�,� F.D. RINGEL L.S. 23613 DATE: u 66 +00 65 +00 64 +00 63 +00 62 +00 61+00 a ------------------- - - -------- - - - 61 +61, 10.2RT --- -- ............ 66 +22, 12.4RT - - - - - -MH f2O STA '6E+78,- �9:J1BT c - MK 19 STA 64 -F26, 10.35 RT -_ - - - - - AD: 18 STA Sf�- 9:9y -R.L REMOVE EXISTING MH AND o : : : : REMOVE EXIS77NG MH AND R/M FLEWS MH38.35 - - - - - - ¢ - REPLACE WITH NEW 54" MH REPLACE VATH NEW 54" MH - - - - - - - 0 o w RIM EL = 38,.5t 38.68 : ° : : : : : : RlAf EL = 38.34 38.51 - - - : - - - IE 8" (N) = 3298 33.15 - - - ° IE 8" (S) = 3289. 33.00 - E 8" {N). _ .39.'48 34:73 ............. IE 8" iN) - 34.12 33.95 .- ......o ......... ... o /E 8° S = .34-62 33-8 5------------------------- ---'-----'--- -.........---..... .........................----. .......- .... ---.. _................. .....- ...... y IE 8" (5) _ -34.63 �) ° - o EXSTING SURFACE ELEVATION 40.. .. .. - - - - - -- - -- - - - -- - - - - - -- .. .......... .........: a ° _ 0 ...... G. - - - - - - - - - - - - - - 0 - - - 35 REMOVE EXISTING SEWER - - - - - - - _ - - _ w - -- - - - -- -- - -- - -- -- ..... - ......... .....5 __ Z - - -- ° l%JQLFB° PVC ®�42 -- - - REMOVE E %IS71NG SEWER 0 0.35% 3 O I EX.SSS 35.1± TA 66 +45.73.10.8 t2T - �7 R M ELM= 38 60 4 +25.66, 10.35 :RT - - - - 266 - '26% - - : .W LF OF 8" CURED -IN -PLACE LINER LF B" PVC ®0.49 .......RIM = - ...... .. - ...... _ ...... .. __ _ _ _ 0 HORIZ {'IP£ EL 38. 8 .........:................ ........ ............................... ..........----------- . _ .. --- - - - -- --- ----------- --- - .- ......:..............- - - - -:- :.........:... B ND SEE D TA--- -T ....:.---.... .....3 -IE 5 =- 34.3 - - - - SCALE - - IE N = 34.3 - - - - - - - - SSAMHOSTA 61+12, 19.85ERT - (�n RIM EL = 38.04 Horiz. 1" _ .20' ° - " Jo Vert. 1" = :5' E (N & s) = 32s a a SHEET 12 wwp.� .a�at \—T27 \\ - 2 SCANNED JUL 2 7 2001 ROLL 173 098