HomeMy WebLinkAboutS-27230Fo
Y U)
ILLI w w -j
(If II
C) 0
<
3.
M
LL-
00 E
L -LJ Zu4
o!a-
D,
,E
CL
o
�S9S�
mn�
mne
A PORTION OF SW 1/4 OF THE SE 1/4 OF SECTION 31, T 23 N, R 5 E, WM.
SOUTH S. 55TH ST.
no
120
FINISHED GRADE (TIP.)
EXIS77NG GROUND (TYP.) L5
115 iff
36+
w
10 263 -LF 8' 0
PV, V5
0.099
STA 0+00
SSMH #11, 48-0 101,31 A.B.
RIM=Iffs.74 11785 A.B. -IDLF 18' STEEL CASING IE 6. 442,� IE 6" 1e2:2M 100.92 A
IE- 6- IN--(EW)= f9&8f -105.-68 A.B. 100
1E 5" OUT (S)= 105:34 105.52 A.B.
STA 2+63
SSMH #IZ 48-0
R1114=406-.59-106.54 A.B.
1E 8: IN (N)=190.49 98.73 A.B.
IE 8. OUT (WI=190-39 98.65 A.B.
IE 8 IN (E)=;ga 49 98.73 A.B.
A-v,0 - ?7 -272 7
REVISIONS, A) CRY OF RIEKFON BUILDING DIVISION. 8) PED LOWERED FINISHED GRADES.
I --
SEWER LINE AD"
SCALE.- HP- 20'
VF-51
PACIMcENOINEERINIG IDE IS 1 IKI 41 11 IN C--e
ROLL 1 �6
AS-BUILT
As built Information provided by.
ESM Consulting Engineers
720 South 348th Street
Federal Way, WA. 98003
(206) 623-5911
Centre Pointe Surveying
33639 9th Ave. South
Federal Way, WA. 98003
(253) 661-1901
E--: MAY 6, 2001
0)
Uj
-i
T
R
0.
Q
Uj
LU
(D
z
0
cq
N
V
Uj
V.11
0 L 4 C4
_j
0
97-18
PROJECT NO.
VMG
DRAWN BY
03-03-98
ISSUE DATE
02-15-00
SHEET REVISION
0)
0
I,
0)
In
0
S�
Lij
z
0
9
in
Li
in
0
0
N
F2
11
Ile
0-
0
0
z
0
I')
�2 I
CIVIL ENOINEERINO AND
PLANNING CONSULTANTS
-T? S z 7.a 2 e SCANNED IOR 3 0 2000
25
EAST
EXIS71NG GROUND (TYP.)
120
-- --- --
120
A-E 3-
qk� LF A-B4O o527 0.0893 1
PVC 0
STA 2+61
. 115
H5
SwIlf-48"o
RIM-- 99 128, 73 ABi2l.22
DNE�
A'S'
1E 8- OUT A.B.
SEWER C
0890
1E 6' IN=;;& 99 12 1.12 A.B.
10
SCALE, HF- 20'
PAC
IE 6" 113.26 T FOUND A.B.)
ffo
ffo
--8. -WAT-IR-
-8*
62
BLDG -5--- -
V F- 51
81 LF 8' PVC OiO.064 0.004,3 A.B.
;1E
IE 6" ;QA.98 110.86 A.B.
V5
STA I-1-ria
SSMH-109-
V5
6° 466.-5- 106.90 A.B.
STA 0+81
RIM-11✓•.90 119.82 A.B.
BLDG 16
SSM - 48-0
IE 8: IN (E)=1!J.QQ 112.83 A.B.
RIZZ�- 113.17 AIB.
IE 8 OUT (W)=112�919 IIZ73 A.B.
IE 8- IN--*Q&.8& 10i.'121 A.B.
%���STA 0+0
IE 8" OUT--4G&.-76-107.11 A.B.
V0
1w
0 7�W-V
RIM=41f.00 112.52 A.B.
--
iE a, IN (st)-imm id6.76 A.B.
IE 8- OUT (N)=IM34 106.66 A.B.
SOUTH S. 55TH ST.
no
120
FINISHED GRADE (TIP.)
EXIS77NG GROUND (TYP.) L5
115 iff
36+
w
10 263 -LF 8' 0
PV, V5
0.099
STA 0+00
SSMH #11, 48-0 101,31 A.B.
RIM=Iffs.74 11785 A.B. -IDLF 18' STEEL CASING IE 6. 442,� IE 6" 1e2:2M 100.92 A
IE- 6- IN--(EW)= f9&8f -105.-68 A.B. 100
1E 5" OUT (S)= 105:34 105.52 A.B.
STA 2+63
SSMH #IZ 48-0
R1114=406-.59-106.54 A.B.
1E 8: IN (N)=190.49 98.73 A.B.
IE 8. OUT (WI=190-39 98.65 A.B.
IE 8 IN (E)=;ga 49 98.73 A.B.
A-v,0 - ?7 -272 7
REVISIONS, A) CRY OF RIEKFON BUILDING DIVISION. 8) PED LOWERED FINISHED GRADES.
I --
SEWER LINE AD"
SCALE.- HP- 20'
VF-51
PACIMcENOINEERINIG IDE IS 1 IKI 41 11 IN C--e
ROLL 1 �6
AS-BUILT
As built Information provided by.
ESM Consulting Engineers
720 South 348th Street
Federal Way, WA. 98003
(206) 623-5911
Centre Pointe Surveying
33639 9th Ave. South
Federal Way, WA. 98003
(253) 661-1901
E--: MAY 6, 2001
0)
Uj
-i
T
R
0.
Q
Uj
LU
(D
z
0
cq
N
V
Uj
V.11
0 L 4 C4
_j
0
97-18
PROJECT NO.
VMG
DRAWN BY
03-03-98
ISSUE DATE
02-15-00
SHEET REVISION
0)
0
I,
0)
In
0
S�
Lij
z
0
9
in
Li
in
0
0
N
F2
11
Ile
0-
0
0
z
0
I')
�2 I
CIVIL ENOINEERINO AND
PLANNING CONSULTANTS
-T? S z 7.a 2 e SCANNED IOR 3 0 2000