HomeMy WebLinkAboutS-276616ROADW RESURFACE, SEE( REMOVE MATERIAL THIS AREA, SEE PLAN
IJFIAI Rni II I1FR WFIRC -.
8
i I I i z IP- au - -''w
\�' i5 ', TANK. L UWNWKGAM WLIK
�= TO HAVE BURIED BED 2
INST FlNE MESH JUTE TING, MAT s CONTROL ROCKS, SEE
FROM TOP OF BANK TO STREAM C8
HIGH WATER FLOWLINE, 3 LOCATIONS NEW 48" WIDE GLULAM
PLANT WILLOW, SALMONBERRY, AND BRIDGE WITH <PIPE SUPPORTS, ROADWAY RESURFACE PER 1 raw A ROUT IN
RED —OSIER DOGWOOD FROM
ON SEE 1
STOCKS, SEE 3 4 S1 CS
C8 C8 I
MATCH WITH EXIST GROUND, TYP
cre +.+ n' t�__
NOTES:
IF THERE ARE NOT SUFFICIENT ON —SITE PLANT STOCKS AVAILABLE AND IF DIRECTED
BY THE ENGINEER, THE CONTRACTOR SHALL IMPORT, AT THEIR EXPENSE, ALL
NECESSARY PLANT MATERIALS.
FOR CONSTRUCTION SEQUENCING AND STREAM FLOW DIVERSIONS SEE STREAM
RESTORATION NOTES ON SHEET G3.
CULVERT REMOVAL /UTILITY WALKWAY
BRIDGE, AREA A 1
SCALE 1" = 10' -0" C2
Wir
EDGE OF EXIST
ACCESS ROAD —
i,-
REMOVE VEGETATION AND INSTALL NEW ROCKERY
WALL ON EXIST SLOPE FOR STREAMBANK
STABILIZATION. ROCKERY INSTALLATION SIMILAR
TO W /O EXCAVATION AT TOE OF SLOPE.
C7
ROADWAY REPAIR AND STREAMBANK -
STABILIZATIONy AREA 2 3.
SCALE 1" = 10' -0"
SCANNED MAR 2 8 Z01M
� o