Loading...
HomeMy WebLinkAboutS-276616ROADW RESURFACE, SEE( REMOVE MATERIAL THIS AREA, SEE PLAN IJFIAI Rni II I1FR WFIRC -. 8 i I I i z IP- au - -''w \�' i5 ', TANK. L UWNWKGAM WLIK �= TO HAVE BURIED BED 2 INST FlNE MESH JUTE TING, MAT s CONTROL ROCKS, SEE FROM TOP OF BANK TO STREAM C8 HIGH WATER FLOWLINE, 3 LOCATIONS NEW 48" WIDE GLULAM PLANT WILLOW, SALMONBERRY, AND BRIDGE WITH <PIPE SUPPORTS, ROADWAY RESURFACE PER 1 raw A ROUT IN RED —OSIER DOGWOOD FROM ON SEE 1 STOCKS, SEE 3 4 S1 CS C8 C8 I MATCH WITH EXIST GROUND, TYP cre +.+ n' t�__ NOTES: IF THERE ARE NOT SUFFICIENT ON —SITE PLANT STOCKS AVAILABLE AND IF DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL IMPORT, AT THEIR EXPENSE, ALL NECESSARY PLANT MATERIALS. FOR CONSTRUCTION SEQUENCING AND STREAM FLOW DIVERSIONS SEE STREAM RESTORATION NOTES ON SHEET G3. CULVERT REMOVAL /UTILITY WALKWAY BRIDGE, AREA A 1 SCALE 1" = 10' -0" C2 Wir EDGE OF EXIST ACCESS ROAD — i,- REMOVE VEGETATION AND INSTALL NEW ROCKERY WALL ON EXIST SLOPE FOR STREAMBANK STABILIZATION. ROCKERY INSTALLATION SIMILAR TO W /O EXCAVATION AT TOE OF SLOPE. C7 ROADWAY REPAIR AND STREAMBANK - STABILIZATIONy AREA 2 3. SCALE 1" = 10' -0" SCANNED MAR 2 8 Z01M � o