SANITARY SEWER PLAN AND PROFILE
E W SANITARY SEWER NOTES AND SPECIFICATIONS:
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY
DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIMITED TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS
OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL
OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT,
FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION"
PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF
$^ RENTON STANDARD SPECIFICATIONS.
Qo 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
°
5. A PRECONSTRUCTION CONFERENCE AND A 24 -HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT
r SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.
(INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S
RESPONSIBILDY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE Of BACKFILLING ALL CONSTRUCTION.
�y 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF
o x i WORKERS AND OTHERS ON THE CONSTRUCTION SITE.
w 3 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY
OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH Ur
HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR.
mm mm o
11. BACKFILL SHALT. BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES,
MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED
LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH.
MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
on to as 12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED
a ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATUNE CUT WITH SAW IN A
CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT
w HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS.
m M Q
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
z ml m 14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED ZED TO THE SATISFACTION OF THE DEPARTMENT
FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1)
OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, THIS SHALL INCLUDE
NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION
OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY
DENSE UNYIELDING BASE, PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE.
y w 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM
w D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
mI 1 17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA,
° ° o COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
oo n
w m!
oo
I,= UTTLfTY CONFUCT NOTB
U' U
GAU110NI
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH
w W OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE
l N. UTUTIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION.
va
THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1- 800 - 424 -5555 AND THEN POTHOLING
Fq ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY
VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE
-- -- • - - -�I �I�' -- PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION.
/j/�T IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN
Z CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH
PLAN VIEW s�wER EASEMENT
SCALE: 1"=20'
SCALE: 1 " =20' HORIZ. 1 " =5' VERT.
RECOMMENDED
FOR APPROVAL
BY
B`/el��R',� �6
BY
JURISDICTIONAL /REVIEW SET
6 -3 -99 MARRIOTT REVIEW
JURISDICTIONAL REVIEW SET
MARRIOTT REVIEW
REVISION
mi
PAVEMENT
ALL SANITARY
CE IN KIND.
se
Q
a
080
cr
0 z
U =
LL z
� Q
z �
J
O
Lo
p w
z
z Q
0 v
a �2
U O
0 —I
J
U `r o
z N
J C
Z Cl) Z
Q d 0
CC M Q
(r U
— m a
ir o = a
CC Cfj F-
CC Z
Co 0)
F)
rn
O Z
N N
w
Z W
W N N N Z
c-j Do �Doo 1Ntl C~O ZS
Z O I I X
N a N L Z
3 N cN _Z
N
Do Y.`ti
�N C
Z
u
z
V
a`
v� ,6 OON
CITY OF RENTON
ON
DEPARTMENT OP PUBLIC WORKS
SANITARY SEWER PLAN AND PROFILE
DEsmrD BDS
DATE 6/22/98 FILE NO,
DRAWN MFB
CHECKED DKB SCALE l"=20' FIELD BOOK PACE
APPROVED SHEET C4 A
OFD+ Q
File: P: \SDSKPROJ \6828 \ENGINEERING \6828- SPI.DWG Date /Time: 08/26/1999 14:48 Scale: 1 =20 Nathan xrefs: Z6828- T,Z6828- 1326828 -S,
R
SCANNED OCT - 8
......::: ....:::. :UTILITY dbSSING ..: :.:...:
..: :: :.. •
.: ', .. ; ... ; : ',
: ',
s
NEW 4 ", WATER.
MAINTAIN -MIN.. 1'
:.
. .. 'CI.f:RRANCf� AT CROSSING.
.... ...
...
..
LI
UTILITY CROSSING !
".
EX: O "CWATERNG
.. .... ::NEW. B FIRELINE :
..... :..MAINTAIN .f,(IN.. 1 .::;
::: .. ,
... ' .... ' :.
.: :: :::
...: .... ....
..::
...CLEARANCE
MAINTAM MIN. 1'
..
..... .. .. ..CLEARANCE AT CROSSING. !
... ..
..
.. .... ..
...:
AT
CROSSING.:
UTILITY CROSSING
....: NEW.. B "..STORM.'... ..
MAINTAIN MIN. 1' DEPTH
TI61TY CROSSING.
MAINTAIN MIN.
{1T CROSSING.
�.
CLEARANCE PT CROSSING
UTILITY CROSSING
...: 1' MIN. :.
.1' MIN..
... .. :
8'
..
NEW 8" SD
MAINTAIN 'MIN. IN 1'
.
' '132 L " PV.C: SDR�3 LgLj., 0% 1 ", MIN�CLEARANO
AT it MIN.
:CROSSING. IN.
E)<. 10 " 'SS'
2
RIM =22.1
IE =16.98 :( @„ E)
.............. EW S�IFI # v- v
W r TIDEFLEX CHECK VALVE
i UTILITY
RI
CROSSING
... .:
... .. ...
.... tE515.58 8,� IN) : '.:
E=15,46 OUT)
EX; 4" SO
MAINTAIN. MIN. 1'. .::.
-
RIM =21.51
. ... ., ,.
...:... .....' :..
,(8 _
..:,.:.:., �
CLEARANCE AT
CROSSING.
[E= 14.04 (10": N :& S)
NEW iIE 14.14 (8' W)
�
2 + D0
3 + 00
PROFILE VIEW
SCALE: 1 " =20' HORIZ. 1 " =5' VERT.
RECOMMENDED
FOR APPROVAL
BY
B`/el��R',� �6
BY
JURISDICTIONAL /REVIEW SET
6 -3 -99 MARRIOTT REVIEW
JURISDICTIONAL REVIEW SET
MARRIOTT REVIEW
REVISION
mi
PAVEMENT
ALL SANITARY
CE IN KIND.
se
Q
a
080
cr
0 z
U =
LL z
� Q
z �
J
O
Lo
p w
z
z Q
0 v
a �2
U O
0 —I
J
U `r o
z N
J C
Z Cl) Z
Q d 0
CC M Q
(r U
— m a
ir o = a
CC Cfj F-
CC Z
Co 0)
F)
rn
O Z
N N
w
Z W
W N N N Z
c-j Do �Doo 1Ntl C~O ZS
Z O I I X
N a N L Z
3 N cN _Z
N
Do Y.`ti
�N C
Z
u
z
V
a`
v� ,6 OON
CITY OF RENTON
ON
DEPARTMENT OP PUBLIC WORKS
SANITARY SEWER PLAN AND PROFILE
DEsmrD BDS
DATE 6/22/98 FILE NO,
DRAWN MFB
CHECKED DKB SCALE l"=20' FIELD BOOK PACE
APPROVED SHEET C4 A
OFD+ Q
File: P: \SDSKPROJ \6828 \ENGINEERING \6828- SPI.DWG Date /Time: 08/26/1999 14:48 Scale: 1 =20 Nathan xrefs: Z6828- T,Z6828- 1326828 -S,
CID
SCANNED OCT - 8
ROLL
##160
#�.41,1
s
N
0
0
z
m
0
w
MU
W
1:i