Loading...
HomeMy WebLinkAboutS-283201SANITARY SEWER UTILITY - GENERAL NOTES 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON AND THE LATEST EDITION OF WSIiOT /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIMITED TO 8:30 A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE TRANSPORTATION DIVISION AT 277- 6222. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE TRANSPORTATION DIVISION 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE CITY INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, DEVELOPMENT SERVICES DIVISION, SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION' IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS- BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR A LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES; MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95% OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE BACKFILL OF THE PIPE SHALL BE THE SAME AS DESCRIBED. 12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH A SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENTSTANDARDS. 13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO. UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 1 16. SANITARY, SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. Wvvp -17 -2832 CONCIPA Cfl MON W/ BRASS PUNCH IN CASE e" J�Q ° .TOa a 0 2 f,1 +, V v I-Al ; 3 I I I rr'1 CONCRETC NON. W/ 13R/fSS PUNCH IN CASE CEXST� STA 2 +44.0 N -EXST SAN SWR MH p D RIM EL 445.7 6 / Q IE IN 439.8 C, o IE > OUT 439.6 ` -4" COMPACTED DEPTH / CL B ASPHALT CONCRETE 13 - I3 - 6' COMPACTED DEPTH 3/4j_11/2 CRUSHED ROCK I 27 z� COMPACT SUBGRADE 95 -EXST e' Pvc TYPICAL ROAD SECTION cn p NO SCALE I _ _ d D I 22 2 LF +06. �L SSPVG I E 439.8 > 4 SWR MN cb O1 EXST 20' - I PA VED ACCESS r zpslo / p \\ STA 1 +54.2 � R Q \� � 5'` M2N 5 o N ' F /- 153 LF N80 °2.3'12 _ 1 6 $g EoP ' PVC \ i N - _- \ < STA 1 +44.2 II.Sy, ��, f ``E 4480 EOp 4 X6 / j \ IF 433 F -M S ` 6 1 v I a STA 1 +16.5 � ,N 1+00T, 23 LF Z I G" PVC SS \ D 432 / 26.0 i\ •.84.73' 1 EXST 8 °PVC 432 439 F3617 SWR MN Nr" R 77 R6- A tP CD o STA. 0+00' -EXST SAN SWR 'AH 48" 0 \ i � a ; I E 47.0 \7 �l 1 I R 25' L \ N 152 LF I MI A t 6 PVC SS 60 90.0 200.75 9S� 26'ACCESS EASEMENT 20' PAVED !SEE ROAD SECTION DETAIL LEGAL DESCRIPTION THE WEST 130' OF THE W. 1/21OF THE E %2 , OF THE W Y? OF THE SE I/A OF SECT. 3 -23-5• r U r JAMES E HAYNES PE 37234 22ND AVENUE SOUTH (FEDERAL WAY, WA 96003 (253)661 -6794 uo J 1a�2O SCANNED MAR 3 0 LUUU - i� , 0 Im®m I� o- tpuri y °z° N D > F_ M m Cn r � M z yril o D � D D Z o m 10 , o 0 N �y J oNlo N u °3