Loading...
HomeMy WebLinkAboutS-286202C C C_ 4 z c C E C 4 E C X C z j E T r :t `C E C .0 t w C C f 3 M Q r c: a 0 �o o� 3 t a A v lu c P 0 t 5 E Jv N to N FQ- N N M U W W U L F s I. PUGET SOUND ENERGY OVERHEAD POWER LINES TO REMAIN, COORDINATE ELEVATION OF LINES AND NESC CLEARANCE REQUIREMENTS WITH PUGET SOUND ENERGY. NO OUTAGES SHALL j3E PERMITTED FOR TRANSMISSION LINES. CONTACT: GARY MIJELLER (206) 521 -5218 2. TEMPORARY OUTAGES FOR TEMPORARY OVERHEAD FEEDER SHOWN ON PLAN WILL BE / EDGE OF WATER EDGE OF WATER R PERMITTED WITH TWO WORKING DAYS NOTICE TO PUGET SOUND ENERGY. -� CONTACT: BRIAN SWART (253) 395 -6839 3. FOR CITY OF RENTON SANITARY SEWER RELOCATION SEE DRAWING C45. 4.� FOR WATER LINE RELOCATION, SEE DRAWINGS C46 —C48. /5. 'OURIED POWER, TELECOMMUNICATIONS, AND GAS RELOCATION BY OTHERS. /CONTACTS: POWER; PUGET SOUND ENERGY, BRIAN SWART (253)395 --6839 TELEPHONE; QWEST COMMUNICATIONS, DENNIS LIBADIA (206)345 -4484 FIBER OPTICS; MCI— WORLDCOM (REPRESENTING SPRINT, BSNF, ATT, MCI AND WORLDCOM FOR JOINT RELOCATION PROJECT), MICHAEL FULMER (253)872 -4005. LEVEL 3 COMMUNICATIONS, JERRY STORY (970)209� 4 4 3 GAS; PUGET SOUND ENERGY, RANDY BUS H OOAN2 4 --2163 PIR HIGH PRESSURE FUEL; BP (OLYMPIC PIPELI STREPO (425)235 -7746 6. ALL 12 UNDERDRAIN PIPE SHALL BE PERFORATED CORRUGATED POLYETHYLENE (PE) j WITH SMOOTH INNER WALL. ALL 6" UNDERDRAIN PIPE SHALL BE CMP, � A � 7. EXCEPT FOR UNDERDRAINS AND DETAIL ON C33, ALL DRAINAGE AND UTILITY TRENCHES INTO CDSM SHALL BE BACKFILL WITH CDF TO ORIGINAL LIMITS OF CDSM. ---SHE - PR`0 L E S ON DRAWINGS C34 TO C36. D r, �_ — W W G G W w� c- ' � 1 T T -- T - R ---- -- ry --- T -- 0 l o1v C} D 1 i BLr.11c: WC)a1<S 1:> T ENGINEERING — STREETS -- WATER — SEWER — PARKS — BUILDING o' 1wr Sw�/ w �✓ wj �I aARS � � �r Iy Mw�1M� l�Ir AYr� Q � ��W IC+IAD �r IC -.��/ ,liorAr � of ri REQUIRED CDF BACKFILL ZONES GRAVEL BACKFILL FOR DRAIN TOP OF CURB /SIDEWALK GUTTER FLOWLINE CB STATION LEFT RIGHT CDF BACKFILL ZONES RE UIRED MO 2/20 /01 ZONE 1 ZONE 2 ZONE 3 ZONE 4 14+11 LEFT RIGHT X X X X X X X 15+70 LEFT 2/20/01 Add bk no X 3 1�/fN RIGHT X 18+07 LEFT X RIGHT X 19 +51 LEFT X X X X RIGHT X X X s•2s�2 a2 ZONE 2: BACKFILL CATCH BASIN EXCAVATION WITH CDF UP TO PREFABRICATED DRAINAGE MATERIAL ZONE 1: BACKFILL TRENCH AND CATCH BASIN EXCAVATIONS WITH CDF UP TO 0.1' BELOW PIPE PER FOR AT1 ON S - ---- -- -- ROLL 20� Cap LAN by date CONSULTANTS designed MO 2/20 /01 19TH AVENUE SOUTH IF WAY, W TON /As4M •eoo��eoo ! ■ 6 1 NEE II I I • C. V�: (i11vyr�(200)431-2300 FAX: (206)431-2250 drawn SA 2/20/01 checked GlP 2/20 /01 pro) ong CCW 2/20/01 pro) dir GLP 2/20/01 Add bk no Z ROLL 20� Cap LAN /"A igQTION — N.T.S ONC. SLAB J (FILL . TRENCH PREFABRICATE DRAINAGE MATERIAL STRUCTUAL CONC. SLAB ZONE 3: BACKFILL FULL DEPTH OF TRENCH WITH CDF �— GRAVEL BACKFILL 0.1' BELOW PIPE FOR DRAIN PERFORATIONS NOTE: CONTRACTOR SHALL CONSTRUCT FORMS AS NECESSARY TO PREVENT CDF FROM EXCEEDING LIMITS SHOWN. TYPICAL CDF BACKFILL FOR UNDERDRAIN TRENCH TRENCH AT LIMIT OF STRUCTURAL SLAB SCAU: N.T.S. DRAINAGE AND UTILITY PLAN SHEET 2 20 0 20 40 scale feet SOUTH 180th STREET GRADE SEPARATION .0 F 11� 113.8 RECORD COPY NO. 3 �_vieiona C33 .h..t 35 of 144 Job no A00064 H im O U Boole 1'•20' dote 20—Feb-2001 ,MENi r dw • dit i .• • t � k t i t, i F c i t i f l i r7 V C CC 0 x C u r N c C �N 4 W 0 :3 J Cr 14 R Kj i— ge W �2N� Z 3 1�/fN /"A igQTION — N.T.S ONC. SLAB J (FILL . TRENCH PREFABRICATE DRAINAGE MATERIAL STRUCTUAL CONC. SLAB ZONE 3: BACKFILL FULL DEPTH OF TRENCH WITH CDF �— GRAVEL BACKFILL 0.1' BELOW PIPE FOR DRAIN PERFORATIONS NOTE: CONTRACTOR SHALL CONSTRUCT FORMS AS NECESSARY TO PREVENT CDF FROM EXCEEDING LIMITS SHOWN. TYPICAL CDF BACKFILL FOR UNDERDRAIN TRENCH TRENCH AT LIMIT OF STRUCTURAL SLAB SCAU: N.T.S. DRAINAGE AND UTILITY PLAN SHEET 2 20 0 20 40 scale feet SOUTH 180th STREET GRADE SEPARATION .0 F 11� 113.8 RECORD COPY NO. 3 �_vieiona C33 .h..t 35 of 144 Job no A00064 H im O U Boole 1'•20' dote 20—Feb-2001 ,MENi r dw • dit i .• • t � k t i t, i F c i t i f l i r7 V C CC 0 x C u r N c C �N 4