Loading...
HomeMy WebLinkAboutS-298601SEC.23, T.23 N., R.5 E., W.M. woow� SR169 42+241.088= 1154TH 1+005-691 BEGIN PROJECT Cj) n­ — co tQ > 152ND AVE. s.E. V rsic"OIA NE / � ® � I 6 L AP E- � w L L Y X m LAI it RmF u, 0 3: 'H PL. S.E. 1+ ul N 14*18'51" E 36 M...m V) Ld z _j 3: ILL --jr­ A5 10 15 _RS 34 — 33 32 I'll, ]SHED GRADE 34 im m 100 10 1 g EXIST. SSMH STA. 1 TOP ELI KING COUNTY R70 2 03 .6, 3.5 -32-19 n RT 32.04 28.29 31 30 0 0, 33 + II _T "—'CLEANOU Flo 29 I p 32 g, pr, q 28 "W I R#f K& EXISI. < 31 27 RIVE INTERCEFTOR 0 ROP CO SEE DEV nm qrw- Ld q R &% AI N -gg i 30 THIS SHEET MODIFIED TO R §1 26 25 REFLECT CONSTRUCTION QQ -EXIST LE = 26.4 24 29 RECORDS., APRIL 2ob6l )mn, pvc 0+950 0+975 1+000 1+025 1 Ix ICHECKED: FIELD BOOK: SURVEYED:-- SURVEY BASE MAP: DESIGN ENTERED: FOTES DESIGNED VANDERBURG GOTZ 5PE 4-.G4* Penhallegon Associates EL W48TAD w-AdmE F-M jAjcx3BR 800 FlFrH AVENUE SUITE 3800 SEATTLE WASHINGTON 98104-S122 TEL: 206.340 06.340.2255 FAX: .2266 FED. AID No. BRS-M171(001) PROJECT No. 401288 SURVEY No. 23-23-5-23 MAINTENANCE DIVISION No. 4 VAND (t 1.15% Ms- MERIDIAN p 2002 Consulting Engineers, Inc. 2002 1 lFnq­.,i,q Pi-ni- S­reyj�g A -98:Dl PH (21�),­-1855 1 BO0 -9-5-9405 Kilkl­d-�SgZf�tle- Fed .. I Way - Portland DATE REVISION I 'EXPIRES 4/4/ NORM ZONE, METER RmF u, 0 3: 'H PL. S.E. 1+ ul N 14*18'51" E M...m V) Ld z _j 3: ILL --jr­ M 36 35 10 15 _RS I'll, ]SHED GRADE 34 im m 100 10 1 g 0 0, 33 + r N 32 g, pr, "W I R#f K& < 31 EXIST. GRADE 0 Ld &% AI N -gg i 30 THIS SHEET MODIFIED TO R §1 REFLECT CONSTRUCTION QQ SAN- R SEWER: 29 RECORDS., APRIL 2ob6l )mn, pvc F71 I 5PE 4-.G4* 1.15% Ms- MERIDIAN p W.S;P.C.s NORM ZONE, METER 27 26 25 W, 83/91 CALL 2 WORKING 'DAYS' BEFORE YOU DIG 1 1 14-L 1-800-424- L 5555 (UNDERGROUND QTIUTY LOCATIONS ARE APPROX.) 1+075 1: KING COUNTY; DEPT. OF TRANSPORTATION, HAROLD TANIGUCHI, DIRECTOR ELLIOTT BRIDGE4 3166 SHEET 146, OF BRIDGE, REPLACEMENT PROJECT 159 SHEETS SEWER PLAN 311 -25 (146) �T' SCANNED 1, 2 7,12006