HomeMy WebLinkAboutS-298604SEC.23, T.23 N., R.5 E., W. M.
48
47
46
45
44
43
42 O
O
41
LID
40
Q
e—
N
39 W
Z
J
2
38
Q
37
36
cI
FIELD BOOK:
SURVEYED:
SURVEY BASE MAP:
DESIGN ENTERED: FOTES 2002
DESIGNED VANDERBURG 2002
CHECKED: GOTZ 2003
DATE
STA.
TOP:
IE =
_
WIRE
/
R/W
�—
5 0
—DITCH
w \
I
I
GRAVEL SHOULDER
5 - 10 15.1
W
�
- -
SCALE
IN METERS
I
I
i
I
I
L0
48
47
I
�
I
V,_
UJI
45
5 1200 mm
76.7, Om
— 44--',L
DIA.
RT
42.285
IN =39.5
5 EYJER
44
OUT =39
73
9
43
�+
42
"
AS A9ft,AAhAh,&
REVISION
i+
425 1 i 1+450 1 1+475 I I Itnzo I I 1 1-800-424
—
(UNDERGROUND, UTILITY LOCATIONS ARE APPROX.)
FED. AID No. BRS— M171(001)
KING COUNTY DEPT. OF TRANSPORTATION SEW -4
r HAROLD TANIGUCHI, DIRECTOR
B
ELLIOTT BRIDGE # 3166 SHEET 149
� &
Penhallegon Associates K Q PROJECT No. 401288
Consulting Engineers, Inc. 800 FIFTH AVENUE SURVEY No. 23- 23 -5 -23 ` - OF
a S,�,eY,9 SUITE 3800 a°�j $ i701Bg� BRIDGE REPLACEMENT PROJECT 159 SHEETS
so z.- ,coo SEATTLE, WASHINGTON
a TEL- 203122 �9fuxeL 311 -25 (149)
»., 'z�oc— g_-a.s 800- 945-9 403 AX 206.3 0.2 66 MAINTENANCE DIVISION No. 4 E FIRES 4 SEER PLAN
BY DATE Kirkland- Seattle - Federal Way- Poifland , - - --j
A3 5- Zgt6Ot SCANNED OCT 2 7 2006
s ws 1 .�. .
Rmn r � -