Loading...
HomeMy WebLinkAboutContract i CAG-12-063 CITY OF RENTON CONTRACT AGREEMENT THIS AGREEMENT is made as of the _ day of April 2012, between the CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as "CITY" and Equipment Roundup& Manufacturing Inc. 1109 NE 146th Street,Vancouver, WA 98685, hereinafter referred to as "CONTRACTOR,"to Provide Materials. Permits, and Installation of Mezzanine in Building D of Public Works Shops, 3555 NE 2nd Street, Renton WA 98056 The City and Contractor agree as set forth below. 1. Scope of Services. The Contractor will provide all material and labor necessary to perform all work described in the Proposal which is included with this Agreement as Attachment"A." 2. Changes in Scope of Services. The City, without invalidating the Contract, may order changes in the Services consisting of additions, deletions or modifications, the Contract Sum being adjusted accordingly. Such changes in the work shall be authorized by written Change Order signed by the City and the Contractor. 3. Time of Performance. The Contractor shall commence performance of the Contract no later than ten (10) calendar days after Contract's final execution, and shall complete the full performance of the Contract not later than 60 calendar days from the date of commencement. 4. Term Of Contract. The Term of this Agreement shall end at completion of the enclosed scope of work. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of the City and the Contractor. 5. Contract Sum. The total amount of this Contract is the sum of $33,403.75 which includes Washington State Sales Tax. 6. Retainage in Lieu of Bond. In lieu of a performance bond, the City will retain 50%of the contract amount for a period of 45 days after Final Acceptance of the work. 7. Method of Payment. Payment by the City for the Services will only be made after the Services have been performed and a voucher or invoice is submitted in a form acceptable to the City. Payment of the initial 50% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 50%will be paid 45 days after Final Acceptance. The City shall have the right to withhold payment to the Contractor for any work not completed in a satisfactory manner until such time as the Contractor modifies such work so that the same is satisfactory. 8. Employment. The Contractor's employees are not employees of the City of Renton. 9. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion of this Contract without express written consent of the City of Renton. 10. Record Keeping and Reporting. The Contractor shall maintain accounts and records which properly reflect all direct and indirect costs expended and services provided in the performance of this Agreement. The Contractor agrees to provide access to any records required by the City. 11. Hold Harmless. The Contractor shall indemnify, defend and hold harmless the City, its officers, agents, employees and volunteers, from and against any and all claims, including claims from third parties, losses or liability, or any portion thereof, including attorneys fees and costs, arising from injury or death to persons, including injuries, sickness, disease or death to Contractor's own employees, or damage to property occasioned by a negligent act, omission or failure of the Contractor. 12. Insurance. The Contractor shall maintain throughout the duration of this contract the following insurance requirements: General Liability insurance in the amount of$1,000,000 per occurrence/$2,000,000 aggregate; Professional Liability insurance in the amount of$1,000,000 per claim; Automobile Liability in the amount of $1,000,000 per accident; and proof of Workers' Compensation coverage. The City of Renton will be name as a Primary and Non-Contributory Additional Insured on the insurance policy and an endorsement stating such shall be provided. 13. Compliance with Laws. The Contractor and all of the Contractor's employees shall perform the services in accordance with all applicable federal, state, county and city laws, codes and ordinances. 14. Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the City of Renton contract shall prevail. 15. Prevailing Wage Rates. The Contractor must comply with the State prevailing wage requirements. The Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the project with the Washington State Department of Labor and Industries, http://www.Ini.wa..qov/TradesLicensing/PrevWa.ge/default.asp This Agreement is entered into as of the day and year written above. CONTRACTOR CITY OF RENTON e.a a . 8-0-p .z Signature Signature 6fe u a;1 Cl. R eat' ii - V.P. Printed Name and Title Terry Higashiyama, Community Services Administrator Equipment Roundup&Manufacturing Inc Printed Name and Title Business Name 1109 NE 146th Street Mailing Address Vancouver WA 98685 City State Zip 360. 576.1171 Telephone i I CITY OF RENTON i PUBLIC WORKS SHOPS MEZZANINE ATTACM E NT A TO CONTRACT Q► "l. & ManufaAring, Inc. w y Phone(360)576-1171 Material Handling Equipment&Custom Manufacturin Fax 360 576-1201 o �a 1109 NE 1461 Street•Vancouver,Washington 98685 �x9 E-mail: erm(@equiDment-rounduc).com STRUCTURAL STEEL MEZZANINE QUOTATION 2012-062 3/6/2012 SPECIFICATIONS STRUCTURE SIZE: PER DRAWING CAPACITY: 125#SO FT DECK HT: 10'-1" CLEAR HT: 9'-0" STAIRWAYS: ONE EACH a) Stairway To Have 36"Steel Diamond Plate Treads&Railing As Required LANDING: ONE EACH a) Landing To Have Steel Diamond Plate Deck&Guard Rail As Required GUARD RAIL: 60 L FT a) Guardrail To Be 42"High Three Rail With 4"Kick Plate GATES: ONE EACH a) Six(6) Foot Swing Style DECKING: 1-1/8"T&G PLYWOOD a) Plywood To Be Unfinished Both Sides PERMITS: INLCUDED ENGINEERING: SEE BELOW FREIGHT: FOB: RENTON,WA INSTALLATION: SEE BELOW MEZZANINE PRICING STRUCTURE STAIRWAYS LANDINGS: GUARD RAIL GATE: 1-1/6"T&G PLY ENGINEERING INSTALLATION FREIGHT TOTAL $31,365.00 CONTINUED FOLLOWING PAGE GENERAL NOTES FINISH SCHEDULE COLUMNS/FOOT PLATES GRAY WIDE FLANGED BEAMS GRAY JOISTS GALVANIZED STAIRWAYS&RAILING GRAY LANDINGS&RAILING GRAY GUARD RAIL GRAY PLYWOOD UNFINISHED INSTALLATION NOTES: JOBSITE:RENTON,WA STAGING AREA AVAILABLE AREA FREE AND CLEAR STANDARD WORKING HOURS LIFTING EQUIPMENT BY ERM 15'-2" 15'-2" 15'-2" 0 � I f N I I CAPACITY: 125# SQ FT LL DECK HT: 10'-1" CLEAR HT: 9'-0" DECK MATERIAL: 1-1/8" T&G PLYWOOD UNFINISHED BOTH SIDES All LOCATION: RENTON, WA 2012-062 S-1 GATE co M � r r I I 2012-062 S-2 I I GUARD RAIL / GATE / LAY OUT 2012-062 S-3