HomeMy WebLinkAboutT-29030AV
ROLL 20� F IR 1 49
//' '� r• S /
REVISION
IBI
GROUP
• PLANNERS •
SUITL 600
506 Second Avenue
Seattle. Washingtcm 981(9 -2374
(206) 521 -9091 fax (206)521 -9095
APPROVAL
PROjEC T T; T LE
\N T�
RENTON
COMMUNICATIONS INSTALLATION
SHEET iiTLE
FIRST FLOOR
CABLING
INSTALLATION
SCALt DA -E
NITS 1 04/29/05
DRAWN BY ELKtD BY
W. Turner LAM
PRUAC."
52 -8895
SnEET
TI -04
This drow;rnoq%, as on instrument of swvioe. is " propwty
of the orcWtocts and may not be rWo*.rcW without their
per end unlws the 1 o odwc%w aorrlw their name.
AN design and athsr Worn+otion show a+ this dre "
we for the uw on the "wIR d poojec " and shad
not be used oelmwise without wyttw. pwmisswn of the
orchNecte.
WrRtw d "wmions shah Noe ommodowe ~ seated
dbvw*wo. Controcwe ~ very and be 1,won"ts
for as dM wwlerm and coMieiaw on the job and the
orshRects eNell be onhrw+ed of emir reriat,ons #mm Me
dln+.N+.lorw ww condpelaw shown on the 0 ow Mo. shoo
drawings 9W be owbmRfed to the orcWtecb for opororot
0e/ae pnssee�ns wpm fobrkmion.
r
J
t♦
♦ J
I
4