Loading...
HomeMy WebLinkAboutT-29030AV ROLL 20� F IR 1 49 //' '� r• S / REVISION IBI GROUP • PLANNERS • SUITL 600 506 Second Avenue Seattle. Washingtcm 981(9 -2374 (206) 521 -9091 fax (206)521 -9095 APPROVAL PROjEC T T; T LE \N T� RENTON COMMUNICATIONS INSTALLATION SHEET iiTLE FIRST FLOOR CABLING INSTALLATION SCALt DA -E NITS 1 04/29/05 DRAWN BY ELKtD BY W. Turner LAM PRUAC." 52 -8895 SnEET TI -04 This drow;rnoq%, as on instrument of swvioe. is " propwty of the orcWtocts and may not be rWo*.rcW without their per end unlws the 1 o odwc%w aorrlw their name. AN design and athsr Worn+otion show a+ this dre " we for the uw on the "wIR d poojec " and shad not be used oelmwise without wyttw. pwmisswn of the orchNecte. WrRtw d "wmions shah Noe ommodowe ~ seated dbvw*wo. Controcwe ~ very and be 1,won"ts for as dM wwlerm and coMieiaw on the job and the orshRects eNell be onhrw+ed of emir reriat,ons #mm Me dln+.N+.lorw ww condpelaw shown on the 0 ow Mo. shoo drawings 9W be owbmRfed to the orcWtecb for opororot 0e/ae pnssee�ns wpm fobrkmion. r J t♦ ♦ J I 4