Loading...
HomeMy WebLinkAboutD-353111T M LO co t` CV D_ U) <, . ., w�P����PSN`Nv OCONTRACTOR W <� EXISTING FOG fr Imo- LINE WIDE EDGE LINE. -- 1 W �+ 00 W °' ��� 5 5s;- 2 TRAFFIC ARROW PER RENTON STANDARD PLAN ®- OCONTRACTOR Z� <, SECTION 32, TWP 24 N, R 5 E, W.M. EXISTING RPM_ - .` CENTER LINE-'� O �% - + 2 2 pEDICAs BHT OF�WAY 1 to Z, V / 37338 Ai 38317 DOUBLE YELLOW CENTERLINE STRIPE. OCONTRACTOR SHALL FURNISH AND INSTALL Imo- WIDE EDGE LINE. -- 1 4 PLASTIC OCONTRACTOR TRAFFIC ARROW PER RENTON STANDARD PLAN ®- OCONTRACTOR Z� SHALL FURNISH AND INSTALL TYPE 1 s - v RPM PER RENTON STANDARD PLAN W � 4 c W2 -2 w TYPE 1 SECTION 32, TWP 24 N, R 5 E, W.M. EXISTING RPM_ - .` CENTER LINE-'� O �% - + 2 2 pEDICAs BHT OF�WAY 1 to Z, V / 37338 Ai 38317 0 w Yii� a � H- 8 7 i, ry AO-6UIL1 OUMVCT 6T: CVAIV '""" "" 1 ° =20' "„, ;°� " «' CITY OF WAHLSTROM, PLS#44651 B.P.B. C3�yar ® 8 bormke, Lxv- C.J.K. (INFORMED LAND SURVEY) o2A RENTON DATU M CONSULTING ENGINEERS THE ORIGINAL PLANS WERE STAMPED ""'�'°'BA,G,� Public Works Dept. 703 DEXTER AVENUE NORTH SUITE 4- BY SC AND BB ON 2/14/2011 & 2/15/2011 �'"""�"�" SEATTLE, DEXTER AVENUE 90109 (2 SUITE 284 -0864 N0. REVISION BY DATE APPR ,wvnvhn B.P.B. I I 0 0 GENERAL NOTES: 1. ALL SIGN TYPES, COLORS AND DIMENSIONS ARE STANDARD PER THE MUTCD, UNLESS NOTED OTHERWISE. 2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY PAVEMENT MARKINGS IMMEDIATELY FOLLOWING PAVING. 3. SIGN SHEETING SHALL BE HIGH INTESNITY GRADE FOR ALL NEW SIGNS. CHANNELIZATION NOTES: OCONTRACTOR SHALL FURNISH AND INSTALL PAINTED SIGNING NOTES: CONTRACTOR SHALL FURNISH AND INSTALL NEW Q SIGN(S)AND POST PER RENTON STANDARD PLANS.. CONTRACTOR SHALL SALVAGE SIGN TO THE CITY AND WASTEHAUL POST /FOUNDATION. DOUBLE YELLOW CENTERLINE STRIPE. OCONTRACTOR SHALL FURNISH AND INSTALL Imo- WIDE EDGE LINE. -- 1 4 PLASTIC OCONTRACTOR TRAFFIC ARROW PER RENTON STANDARD PLAN a OCONTRACTOR Z� SHALL FURNISH AND INSTALL TYPE 1 J RPM PER RENTON STANDARD PLAN W � 4 c W2 -2 w TYPE 1 SEAHAWKS WAY w N + a D3 YELLOW CENTERLINE. " OCONTRACTOR 3N PLASTIC 2 BICYCLE LANE SYMBOL PER WSDOT STANDARD PLAN od OCONTRACTOR SHALL FURNISH AND INSTALL 24" WIDE PLASTIC STOP LINE PER RENTON STANDARD MAN, W N Q D11-1 OCONTRACTOR 0 D9 -2B AND 0 w Yii� a � H- 8 7 i, ry AO-6UIL1 OUMVCT 6T: CVAIV '""" "" 1 ° =20' "„, ;°� " «' CITY OF WAHLSTROM, PLS#44651 B.P.B. C3�yar ® 8 bormke, Lxv- C.J.K. (INFORMED LAND SURVEY) o2A RENTON DATU M CONSULTING ENGINEERS THE ORIGINAL PLANS WERE STAMPED ""'�'°'BA,G,� Public Works Dept. 703 DEXTER AVENUE NORTH SUITE 4- BY SC AND BB ON 2/14/2011 & 2/15/2011 �'"""�"�" SEATTLE, DEXTER AVENUE 90109 (2 SUITE 284 -0864 N0. REVISION BY DATE APPR ,wvnvhn B.P.B. I I 0 0 GENERAL NOTES: 1. ALL SIGN TYPES, COLORS AND DIMENSIONS ARE STANDARD PER THE MUTCD, UNLESS NOTED OTHERWISE. 2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY PAVEMENT MARKINGS IMMEDIATELY FOLLOWING PAVING. 3. SIGN SHEETING SHALL BE HIGH INTESNITY GRADE FOR ALL NEW SIGNS. CHANNELIZATION NOTES: OCONTRACTOR SHALL FURNISH AND INSTALL PAINTED SIGNING NOTES: CONTRACTOR SHALL FURNISH AND INSTALL NEW Q SIGN(S)AND POST PER RENTON STANDARD PLANS.. CONTRACTOR SHALL SALVAGE SIGN TO THE CITY AND WASTEHAUL POST /FOUNDATION. UTILITY NOTE: THE CONTRACTOR SHALL CALL THE UTILITY LOCATION REQUEST CENTER (ONE CALL CENTER; 1- 800 -424 -5555) FOR -FIELD LOCATION OF UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISRNG UTILITIES WITHIN THE PROJECT, WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOUNG THE UTILITIES AND SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR TO CONSTRUCTION. ALL POTENTIAL UTILITY CONFLICTS SHALL BE POTHOLED A MINIMUM OF FIVE WORKING DAYS IN ADVANCE OF ANY PIPELINE TRENCH EXCAVATION. THE UTUIIES SHOWN ON THE PLANS ARE BASED UPON AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS OCCUR THE CONTRACTOR SHALL CONSULT THE PROJECT ENGINEER TO RESOLVE THE PROBLEM PRIOR TO PROCEEDING WITH CONSTRUCTION. LAKE WASHINGTON BLVD NORTH STORM WATER & WATER MAIN IMPROVEMENTS CHANNELIZATION PLAN SHEETS Cis, 0 -35 al / t 33111 UROD 2/14/11 muao xa ef" 20 ov DOUBLE YELLOW CENTERLINE STRIPE. OCONTRACTOR SHALL FURNISH AND INSTALL PAINT WIDE EDGE LINE. SHALL FURNISH AND INSTALL PLASTIC OCONTRACTOR TRAFFIC ARROW PER RENTON STANDARD PLAN H008. OCONTRACTOR SHALL FURNISH AND INSTALL TYPE 1 AND TYPE 2E RPM PER RENTON STANDARD PLAN H002 APPROACH LINE. OCONTRACTOR SHALL FURNISH AND INSTALL TYPE 1 AND TYPE 2D RPM PER RENTON STANDARD PLAN H001 DOUBLE YELLOW CENTERLINE. OCONTRACTOR SHALL FURNISH AND INSTALL PLASTIC BICYCLE LANE SYMBOL PER WSDOT STANDARD PLAN M- 9.50 -01. OCONTRACTOR SHALL FURNISH AND INSTALL 24" WIDE PLASTIC STOP LINE PER RENTON STANDARD PLAN H008. OCONTRACTOR SHALL PROTECT EXISTING STRIP AND RPMS DURING CONSTRUCTION. UTILITY NOTE: THE CONTRACTOR SHALL CALL THE UTILITY LOCATION REQUEST CENTER (ONE CALL CENTER; 1- 800 -424 -5555) FOR -FIELD LOCATION OF UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISRNG UTILITIES WITHIN THE PROJECT, WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOUNG THE UTILITIES AND SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR TO CONSTRUCTION. ALL POTENTIAL UTILITY CONFLICTS SHALL BE POTHOLED A MINIMUM OF FIVE WORKING DAYS IN ADVANCE OF ANY PIPELINE TRENCH EXCAVATION. THE UTUIIES SHOWN ON THE PLANS ARE BASED UPON AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS OCCUR THE CONTRACTOR SHALL CONSULT THE PROJECT ENGINEER TO RESOLVE THE PROBLEM PRIOR TO PROCEEDING WITH CONSTRUCTION. LAKE WASHINGTON BLVD NORTH STORM WATER & WATER MAIN IMPROVEMENTS CHANNELIZATION PLAN SHEETS Cis, 0 -35 al / t 33111 UROD 2/14/11 muao xa ef" 20 ov