Loading...
HomeMy WebLinkAboutD-353112w O m a w w a) 0 0 a w Z J U F a —_C �i!r r• C `14+00 _ I — 4 LO 12 +00 TPI F _ 1-_ l' 2 — ------_'—� Vi LU 2 - - -- -- -- -- -- -- J Q a j� A: 73 � We4�m 37338 0 ,� o. 9. 36311 _ CONSTRUCTION NOTES: tO CONTRACTOR SHALL SAWCUT EXISTING ASPHALT PAVEMENT AND CONCRETE PANEL, AS REQUIRED. O2 CONTRACTOR SHALL COLD PLANE /GRIND EXISTING PAVEMENT SURFACE, 2" DEPTH. ALL MATERIAL SHALL BE REMOVED AND WASTE HAULED BY THE CONTRACTOR. 3O CONTRACTOR SHALL FURNISH AND INSTALL HMA OVERLAY. SEE TYPICAL CROSS SECTIONS ON SHEET 16. O4 CONTRACTOR SHALL FURNISH AND INSTALL NEW PAVEMENT SECTION, SEE TYPICAL CROSS SECTIONS ON SHEET 16. 5O CONTRACTOR SHALL REPAIR EXISTING CONCRETE PANEL PER STANDARD DETAIL H033 IN THE SPECIFICATIONS. O6 CONTRACTOR SHALL FURNISH AND INSTALL GRAVEL SHOULDER, SEE TYPICAL CROSS SECTIONS ON SHEET 16. REMOVE AND WASTEHAUL EXISTING ASPHALT AS REQUIRED. 11� J©©©©©l AS -BUILT SURVEY BY: EVAN" �". NeGLL NWD, WAHLSTROM, PLS#44651 emeao "� 2/14/LAKE OF LAKE WASHINGTON BLVD NORTH B.P.B. 4c; y 8r ®sbosne' Imo. (INFORMED LAND SURVEY) owe C.J.K. REN TON STORM WATER & WATER MAIN DATUM ICI CONSULTING ENGINEERS THE ORIGINAL PLANS WERE STAMPED c�¢unxuSA,C, sN Public works Dept: IMPROVEMENTS 21 ]Ol DEXTER AVENUE NORTH SUITE 200 PAVEMENT RESTORATION SHEETS SEATTLE, WASHINGTON 98109 <zos, 284-0e60 BY SC AND BB ON 2/14/2011 & 2/15/2011 N0. REVISION BY DATE APPR �AP1i B.P.B. �0°�"r* 21 °' 27