Loading...
HomeMy WebLinkAboutS-316206i w Q z w J L0 0 0 N z 0 w J 0 0 w Q 0 z 0 J a_ FILL IN EX.--\ MANHOLE CHANNEL (TYP) EX. MH -0 UNKNOWN—, /I \ \ 7' v EX. 12 "CONC OUT EX. 10 "CONC. IN 1;x'�'—PLUG & ABANDON AFTER PROPOSED SEWER IN SERVICE. a. RECHANNEL EX. ° MH TO :. ACCOMMODATE + NEW FLOW �� v DIRECTION (TYP) v° �� EX. 8 "CONC. IN \ PLUG & ABANDON AFTER PROPOSED SEWER IN SERVICE. �—EX. 10 "CONC. IN 1 -- — % EX. PIPE — UNKNOWN 0 /'a INACTIVE CONNECTION ��_�, . �� EX. 10 "GONG. IN PLUG AND ABANDON_ AFTER PROPOSED SEWER a IN SERVICE \ FILL IN EX. MANHOLE ! RECHANNEL EX. CHANNEL (TYP) <� i ° MH TO ACCOMMODATE EX. MH -0 UNKNOWN " \ ^ NEW _FLOW — ^ CUTIN 48' —M I SEE DE THIS SF III � ��i i plililift EX.8 "PVC it • Zug IMMANHOLE 87A DETAIL v� EX. 48 "4 MH ° G ROMAC ZANS. RECHANNEL EX. 'LG. MH TO ACCOMMODATE \ NEW FLOW I ` ✓ J DIRECTION (TYP) ° 6 �� - _4- �___ w a" ova rnr MANHOLE • 0 DETAIL NTS EX.8 "PVC IN �PLUG AND ABANDON AFTER PROPOSED SEWER IN SERVICE r � r � �S EX. MH -0 UNKNOWN AGE EX.8 "PVC (ABANDONED) t r RECHANNEL EX. FILL IN EX. \ MH TO MANHOLE ACCOMMODATE CHANNEL (TYP) NEW FLOW ,t;ir, t';+ DIRECTION (TYP) T EX.8 PVC OUT EX.8 "PVC IN PLUG AND ABANDON n rrrn nr-�r�r+rn EX 8" 8" PVC IN �— ��PLUG & ABANDON AFTER PROPOSED SEWER IN SERVICE. !' ! o 1.11 i EX.8 "PVC IN �. 9a� 9vrry nrvw v i ue9 ar_r_ v� o. e MANHOLES SHALL BE 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE. 3. CORE DRILL ALL NEW INLETS /OUTLETS IN EX. MANHOLES MH —O UNKNOWN FILL IN EX. MANHOLE CHANNEL (TYP) MANHOLE • DETAIL NTS • NEW PRECAST MANHOLE BASE SECTION z NEW COUPLING (TYPICAL) 4 "— 6" COMPACTED BEDDING MATERIAL— • INSTALLATION PROCEDURES: NEW PRECAST MANHOLE SECTION I 24 "TYP SMIN — J L EXISTING SEWER MAIN - A.C. COLLAR MH ADAPTER FOR PVC PIPE ONLY (TYP) 1. CONTRACTOR WILL TEMPORARILY PLUG LINE AT UPSTREAM MANHOLE. 2. EXPOSE AND REMOVE EXISTING PIPE. 3. PLACE EXISTING PIPE WITH NEW A.C. COLLARS THROUGH NEW MANHOLE BASE SE( IF CUT PIPE SECTION CONTAINS A PIPE BELL, REPLACE PIPE WITH A I STRAIGHT SECTION OF PIPE, OR AS DIRECTED BY THE DISTRICT. 4. SET MANHOLE AND PIPE IN PLACE TO PROPER ALIGNMENT AND GRADE. 5. RECONNECT PIPE WITH COUPLINGS (ROMAC, MJ SLEEVE, OR PVC SLIP COUPLI 6. CHANNEL MANHOLE PER CITY STANDARDS. 7. REMOVE PIPE INSIDE MANHOLE. FILL MANHOLE WITH SAND COMPACTED TO AT LEAST 90% DENSITY THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BY ROTH HILL ENGINEERING PARTNERS, LLC (ROTH HILL). ALL FIELD INFORMATION PROVIDED BY OTHERS. ROTH HILL HAS NOT VERIFIED THE ACCURACY AND /OR COMPLETENESS OF INFORMATION PROVIDED BY OTHERS AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED AS A RESULT OF ERRONEOUS INFORMATION PROVIDED BY OTHERS. Lu CRACK /PERFORATE BOTTOM TO PREVENT STANDING WATER FIELD REP:_ REVISED BY: DATE: MOVE /DEMOLISH STRUCTURE F LEAST 4' BELOW GROUND JRFACE. BACKFILL WITH 2USHED SURFACING OR BANK JN GRAVEL. DEBRIS MAY BE XED WITH SAND IN MAINING MANHOLE SECTIONS JBJECT TO APPROVAL OF 4GINEER. PLUG ALL INLETS /OUTLETS TO MANHOLE REVISED TO INDICATE CONSTRUCTION RECORDS PARAMETRIX RANDALL LAMERE MAY 02, 2008 EXPIRES 10 9