Loading...
HomeMy WebLinkAboutS-325402N M N~ v = I-- * ippopp- l"° 8 �. ; 1*1 I �. v) N i � CL J O.. Q 4 0 Z cc W 0 7 Z Q Q D z 1-1 Q p U a o 0 a v T W 1 T < T BEDDING CLASS DESIGN +% o CL-fa aw a CLASS B o ,,.. '^ CLASS F N_ n Q a - -E ZERO 3Q 1/4 O.D. 1/2 O.D. n n v ZERO Epoppopq W Li 0 ca a 1/2 O.D. cr c O.D. �./ c: i6 q) 04 N Z � cr Ln 0 (m mE Li z- Z C ` 1 %O ; �V ll �Alm .c C ►!� LO v� c� Q p U a o 0 a v T W 1 T < T 0 cn ra z z cr cr v v RP MV0 NOTES AID & TA CMAT M 1. ALL WORK MATERWS SFUILL BE IN CONFORMANCE MATH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SWILL BE UMITED TO 8:30 A.M. TO 3:30 P.Y. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. 3. ALL CONSTRUCTION SWILL BE IN ACCORDANCE WITH `STANDARD SPECIFICATIONS FOR MUNICIPAL PUBUC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBUC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SWILL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRECONSTRUCTION CONFERENCE AND A 24 -HOUR NOTICE SWILL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SML BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SWILL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFIWNG ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. R SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH WAS BEEN STAMPED AND SIGNED BY A UCENSED PROFESSIONAL ENGINEER OR UCENSED PROFESS04AL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 12. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 13. ALL DISTURBED AREAS SWILL BE SEEDED AND MULCHED OR OTHERWISE STABIUZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 14. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECK LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 15. SANITARY SEWER PIPE SWILL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 16. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2" WEB 8 PL. FRAME (NON- LOCKING) A RAISE -1 /2" WIDE BORDER SANITARY SEWER NOTES AND DETAILS wzjyvSTONE II A PORTION OF THE SE 1/4 OF SEC. 39 T. 239 R. SE, W.M., KING COUNTY, WASHINGTON 3/4" SQUARES SPACED -- 3/4" AASS INDICATED - HT. 1 /8" X1/2" 1 -1/41 elf 7 -3/4" 15" CAST IRON RING AND COVER PIPE MATERIAL A5 BY THE ENGINEER 12" / C FlBEF PACK 45'(1/8) 6' OR 8' CLEAN--OUT DETAIL NOT TO SCALE ' ^" x 3" x 3/8" NON -SKID ERN CAST INTEGRAL ON TOP COVER (NON- LOCKING) FOR 5/8 " -11 N.C. x 1-1/4" 6 S.S. SOOCC. HD. CAP SCREW (3 REQ D.) NP. TYP. NON -SKID PATTERN 0 �-0- -0 O e PLUG TO BE SEALED - IN SAME MANNER AS MAIN SEWER JOINTS. SECTION A -A 4" 1 -3/8" 5/8" 1-3/8" 12" 1 " EAT- �-- I h-2 -1 /2" 25" 2" RAISED LETTERS AS REQ D. SEE NOTE N0.3 BELOW UNDERSIDE SHOWN FOR CLARITY 3/4 CORE (TYP.) ON 23 B.C. -DRILL AND TAP 5/8 " -11 N.C. ON 23 B.C.(TYP. 3 PL.) 1 -1 /2" CORE(TYP.) (LOCKING) FRAME (LOCKING) COVER -NOTES: 1. FOR NON- LOCKING USE OLYMPIC FOUNDRY No. MH 30 OR EQUAL. 2. FOR LOCKING LID USE OLYMPIC FOUNDRY No. MH 30 D/T OR EQUAL 3. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER), SANITARY (SPECIFY "SEWER "), OR WATER (SPECIFY "WATER "). MANHOLE FRAME AND COVER DETAIL NOT TO SCALE CONCRETE CLASS 3000 �i BACKFILL MATERIAL (SEE NOTE 5) CONCRETE CLASS C (SEE NOTE 8) FOUNDATION LEVEL BACKFILL MATERIAL (SEE NOTE 5) BEDDING MATERIAL FOR RIGID PIPE (SEE NOTE 6) FOUNDATION LEVEL BEDDING MATERIAL FOR FLEXIBLE PIPE (SEE NOTE 7) FOUNDATION LEVEL (SEE NOTE 4 • (CLASS •A•,DESIGN) (SEE NOTE 4 (CLASS B, C. D, DESIGN) BEDDING FOR RIGID PIPE 1-W (SEE NOTE 4)--loe- UMITS OF PIPE ZONE 1. rO.. LIMITS OF PIPE ZONE LIMITS OF PIPE ZONE (CLASS F DESIGN) BEDDING FOR FLEXIBLE PIPE NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 95X MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE, ITARY SEWERS SECTK�I OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH AND TRENCHMNG OPTIONS. THE PIPE ZONE WILL BE THE ACTAUL TRENCH WIDTH, EXCEPT FOR A BEDDING. THE MINIMUM aNX-TE WIDTH SHALL BE 1-1/2 I.D. + 18 . 5. TRENCH BACKFTLL SMALL CONFORM TO "BACKFUNG SEWER TRENCHES" IN THE SANITARY SEWERS SECTION �QF THE STANp SP&WMCEPT THAT ROCKS Z OR LUMPS LARGER THAN 1 PER FOOT OF PIPE NOT BE USED IN THE Q SACKFILL MATERIAL -- 6. SEE "BEDDING MATERIAL. FOR RIGID PIPE" IN THE AGGREGATES SECTION OF THE ~ STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS. Q 7. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES SECTION OF U STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. O 8. PIPE MUST BE ANCHORED IN SUCH A MAKER AS TO ENSURE FLOW UNE IS ...J MAINTAINED. BEDDING CLASS DESIGN DIMENSION CLASS A CLASS B WO CLASS D CLASS F A 4" MIN. 124 I.D. MAX. * * ZERO B 1/4 O.D. 1/2 O.D. n n v ZERO O.D. C a 1/2 O.D. 1/8 O.D. O.D. - CN PO 04 N Z � cr Q 0 (m N UD Li z- Z 1 000 I all rl_ Q N < ►!� LO z -.-.� m w GO W 0 cn ra z z cr cr v v RP MV0 NOTES AID & TA CMAT M 1. ALL WORK MATERWS SFUILL BE IN CONFORMANCE MATH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SWILL BE UMITED TO 8:30 A.M. TO 3:30 P.Y. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. 3. ALL CONSTRUCTION SWILL BE IN ACCORDANCE WITH `STANDARD SPECIFICATIONS FOR MUNICIPAL PUBUC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBUC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SWILL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRECONSTRUCTION CONFERENCE AND A 24 -HOUR NOTICE SWILL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SML BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SWILL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFIWNG ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. R SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH WAS BEEN STAMPED AND SIGNED BY A UCENSED PROFESSIONAL ENGINEER OR UCENSED PROFESS04AL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 12. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 13. ALL DISTURBED AREAS SWILL BE SEEDED AND MULCHED OR OTHERWISE STABIUZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 14. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECK LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 15. SANITARY SEWER PIPE SWILL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 16. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 18 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2" WEB 8 PL. FRAME (NON- LOCKING) A RAISE -1 /2" WIDE BORDER SANITARY SEWER NOTES AND DETAILS wzjyvSTONE II A PORTION OF THE SE 1/4 OF SEC. 39 T. 239 R. SE, W.M., KING COUNTY, WASHINGTON 3/4" SQUARES SPACED -- 3/4" AASS INDICATED - HT. 1 /8" X1/2" 1 -1/41 elf 7 -3/4" 15" CAST IRON RING AND COVER PIPE MATERIAL A5 BY THE ENGINEER 12" / C FlBEF PACK 45'(1/8) 6' OR 8' CLEAN--OUT DETAIL NOT TO SCALE ' ^" x 3" x 3/8" NON -SKID ERN CAST INTEGRAL ON TOP COVER (NON- LOCKING) FOR 5/8 " -11 N.C. x 1-1/4" 6 S.S. SOOCC. HD. CAP SCREW (3 REQ D.) NP. TYP. NON -SKID PATTERN 0 �-0- -0 O e PLUG TO BE SEALED - IN SAME MANNER AS MAIN SEWER JOINTS. SECTION A -A 4" 1 -3/8" 5/8" 1-3/8" 12" 1 " EAT- �-- I h-2 -1 /2" 25" 2" RAISED LETTERS AS REQ D. SEE NOTE N0.3 BELOW UNDERSIDE SHOWN FOR CLARITY 3/4 CORE (TYP.) ON 23 B.C. -DRILL AND TAP 5/8 " -11 N.C. ON 23 B.C.(TYP. 3 PL.) 1 -1 /2" CORE(TYP.) (LOCKING) FRAME (LOCKING) COVER -NOTES: 1. FOR NON- LOCKING USE OLYMPIC FOUNDRY No. MH 30 OR EQUAL. 2. FOR LOCKING LID USE OLYMPIC FOUNDRY No. MH 30 D/T OR EQUAL 3. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER), SANITARY (SPECIFY "SEWER "), OR WATER (SPECIFY "WATER "). MANHOLE FRAME AND COVER DETAIL NOT TO SCALE CONCRETE CLASS 3000 �i BACKFILL MATERIAL (SEE NOTE 5) CONCRETE CLASS C (SEE NOTE 8) FOUNDATION LEVEL BACKFILL MATERIAL (SEE NOTE 5) BEDDING MATERIAL FOR RIGID PIPE (SEE NOTE 6) FOUNDATION LEVEL BEDDING MATERIAL FOR FLEXIBLE PIPE (SEE NOTE 7) FOUNDATION LEVEL (SEE NOTE 4 • (CLASS •A•,DESIGN) (SEE NOTE 4 (CLASS B, C. D, DESIGN) BEDDING FOR RIGID PIPE 1-W (SEE NOTE 4)--loe- UMITS OF PIPE ZONE 1. rO.. LIMITS OF PIPE ZONE LIMITS OF PIPE ZONE (CLASS F DESIGN) BEDDING FOR FLEXIBLE PIPE NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 95X MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE, ITARY SEWERS SECTK�I OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH AND TRENCHMNG OPTIONS. THE PIPE ZONE WILL BE THE ACTAUL TRENCH WIDTH, EXCEPT FOR A BEDDING. THE MINIMUM aNX-TE WIDTH SHALL BE 1-1/2 I.D. + 18 . 5. TRENCH BACKFTLL SMALL CONFORM TO "BACKFUNG SEWER TRENCHES" IN THE SANITARY SEWERS SECTION �QF THE STANp SP&WMCEPT THAT ROCKS Z OR LUMPS LARGER THAN 1 PER FOOT OF PIPE NOT BE USED IN THE Q SACKFILL MATERIAL -- 6. SEE "BEDDING MATERIAL. FOR RIGID PIPE" IN THE AGGREGATES SECTION OF THE ~ STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS. Q 7. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES SECTION OF U STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. O 8. PIPE MUST BE ANCHORED IN SUCH A MAKER AS TO ENSURE FLOW UNE IS ...J MAINTAINED. s A = 4" MIN. 27" I.D. AND UNDER 6" MIN. OVER 27" I.D. .' Mf NOT TO SCALE PROPERTY LINE 3' -0" MIN. ----- .g• -0" FUTURE 6" BUILDING SEWER PIPE I BUILDING SEWER \- TEE WITH 6" SIDE OUTLET 6" SIDE SEWER AND BUILDING SEWER W z 2 "x 4" STUD SERVICE MARKER PAINT UPPER PORTION WHITE ANS STENCIL ON SIDE WQRDING "SEWER" WITH 3" HIGH BLACK LETTERS. AND 16 WIRE WRAPPED AROUND THE STUD AND a EXTE DE D TO THE TOP OF THE STUD. cr CL UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN. VITRIFIED CLAY, PLAIN AND REINFORCED CONCRETE, D1 PIPE AND Cl PIPE SEWER MAINS ARE TO BE CORE DRILLED 60" ALLOWABLE MAX. FOR CAST IRON PIPE OR DUCTILE IRON PIPE. /fir CONCRETE �,�,jln.,rsikcx BIOCKING7 M\N G27L MIN SLOPE 6" SIDE OUTLET TEE HORIZONTAL 6" MIN. SEWER MAIN SEWER MAIN CONCRETE BLOCKING ANGLE OF TEE AT MAIN OVER 25 TYPICAL SIDE SEWER ELEVATION ELEVATION NOTE: UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 5' COVER AT PROPERTY UNE OR 3 -5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. STANDARD 31DE SEWER INSTALLATION (SEWER MANY TO PROPERT'Y LNVE) �► " 43 Z 2 NOT TO SCALE ROLL 200 FR283 Fm �l7,�0 low By: Dote: By: Dote: By: We By: Dote c� 'S• 32 541OZ • r N FZ W Q N F CL z U � W 3 IL 40 O llj llj Z cm O � N I�I BEDDING CLASS DESIGN DIMENSION CLASS A CLASS B CLASS C CLASS D CLASS F A 4" MIN. 124 I.D. MAX. * * ZERO B 1/4 O.D. 1/2 O.D. 1/a O.D. ZERO O.D. C E/4 O.D. 1/2 O.D. 1/8 O.D. O.D. - s A = 4" MIN. 27" I.D. AND UNDER 6" MIN. OVER 27" I.D. .' Mf NOT TO SCALE PROPERTY LINE 3' -0" MIN. ----- .g• -0" FUTURE 6" BUILDING SEWER PIPE I BUILDING SEWER \- TEE WITH 6" SIDE OUTLET 6" SIDE SEWER AND BUILDING SEWER W z 2 "x 4" STUD SERVICE MARKER PAINT UPPER PORTION WHITE ANS STENCIL ON SIDE WQRDING "SEWER" WITH 3" HIGH BLACK LETTERS. AND 16 WIRE WRAPPED AROUND THE STUD AND a EXTE DE D TO THE TOP OF THE STUD. cr CL UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING MAIN. VITRIFIED CLAY, PLAIN AND REINFORCED CONCRETE, D1 PIPE AND Cl PIPE SEWER MAINS ARE TO BE CORE DRILLED 60" ALLOWABLE MAX. FOR CAST IRON PIPE OR DUCTILE IRON PIPE. /fir CONCRETE �,�,jln.,rsikcx BIOCKING7 M\N G27L MIN SLOPE 6" SIDE OUTLET TEE HORIZONTAL 6" MIN. SEWER MAIN SEWER MAIN CONCRETE BLOCKING ANGLE OF TEE AT MAIN OVER 25 TYPICAL SIDE SEWER ELEVATION ELEVATION NOTE: UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 5' COVER AT PROPERTY UNE OR 3 -5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. STANDARD 31DE SEWER INSTALLATION (SEWER MANY TO PROPERT'Y LNVE) �► " 43 Z 2 NOT TO SCALE ROLL 200 FR283 Fm �l7,�0 low By: Dote: By: Dote: By: We By: Dote c� 'S• 32 541OZ • r N FZ W Q N F CL z U � W 3 IL 40 O llj llj Z cm O � N I�I �N � SL 0 V� i Z 04 W gJ c 7/2O/p P`1 SAp,,p o` w4�n # 0 J ° p%2 Sit% y, ` LN;v EX t� pi l il)F771 7 s J L 7 7 l r .J L T1 n cr 0 7 Q a� 7 7 7 O Z i• W 0 im Z V / '�1 V' Qo CL J Z L Q CN PO 04 N Z � cr 0 (m N UD 00 z- Z 1 000 I W w w N < ►!� LO z -.-.� w GO W N N U Y V) �N � SL 0 V� i Z 04 W gJ c 7/2O/p P`1 SAp,,p o` w4�n # 0 J ° p%2 Sit% y, ` LN;v EX t� pi l il)F771 7 s J L 7 7 l r .J L T1 n cr 0 7 Q a� 7 7 7 O Z i• W 0 im