Loading...
HomeMy WebLinkAboutS-347331e °o N z 0 v 3 0 a N 0 0 a 0 z O a tv4.•w aF WA-,,& FIHILL FP �� Yam 311847 4 Roth Hill, LLC Tel 425.869.9448 www.rothhill.com ��OF FAGIsTERF9 w 11130 NE 33rd Plaoe, Su@e 200 Bellevue, WA 98004 �SStoxat� CONSTRUCTION SEQUENCE 1. ATTEND PRE - CONSTRUCTION MEETING. 2. OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS BEYOND THOSE PROVIDED BY CITY (SEE SPECIFICATIONS) AND ANY NECESSARY AGREEMENTS WITH PROPERTY OWNERS PRIOR TO COMMENCING WORK. 3. COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING. STAKING TO BE PROVIDED BY CONTRACTOR. 4. INSTALL PERIMETER PROTECTION AND TEMPORARY EROSION AND SEDIMENT CONTROLS AND TEMPORARY STORMWATER TREATMENT FACILITIES (BAKER TANKS, ETC.). 5. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH KING COUNTY AND CITY STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT THE PROJECT. 6. CLEAR AND GRUB SITE. 7. INSTALL DEWATERING SYSTEM AND DEWATERING OUTFALL AREA AND BEGIN DEWATERING OPERATION AS NECESSARY. 8. INSTALL WET WELL, OVERFLOW VAULT, AND VALVE VAULT AND BACKFILL EXCAVATIONS. 9. CONSTRUCT GRAVITY SEWERS AND FORCE MAINS. 10. GRADE SITE AND INSTALL UTILITIES. 11. CONSTRUCT CONTROL BUILDING. 12. INSTALL ELECTRICAL AND CONTROL SYSTEMS, GENERATOR SET, AND ALL RELATED LIFT STATION APPURTENANCES. 13. CONSTRUCT STORMWATER IMPROVEMENTS ON NEW STONEGATE SITE AND NILE AVE NE. 14. PERFORM TESTING AND START -UP FOR STATION. 15. ABANDON EXISTING STONEGATE LIFT STATION AND CONNECT TO GRAVITY SEWER. 16. ABANDON EXISTING SUMMERWIND LIFT STATION AND CONNECT TO GRAVITY SEWER. 17. PERFORM FINAL GRADING ON NEW STONEGATE SITE. 18. INSTALL LANDSCAPING PLANTS. 19. CONSTRUCT IMPROVEMENTS IN NILE AVE NE AND PERFORM SITE RESTORATION. 20. REMOVE TEMPORARY BMPS ONLY AFTER ALL DANGER OF EROSION HAS PASSED AND AFTER APPROVAL BY CITY. 21. CLEAN STORM SYSTEM PRIOR TO USE. DO NOT FLUSH CLEANING WATER DOWNSTREAM. 22. PREPARE AND PROVIDE O & M MANUALS PER SPECIFICATIONS. 23. PROVIDE CONSTRUCTION RECORD DRAWINGS. NOTE: THIS IS A POSSIBLE SEQUENCE. FINAL SEQUENCE SHALL BE DEVELOPED BY CONTRACTOR AND SUBJECT TO REVIEW BY OWNER. �F nASII: 37847 FOR CONSTRUCTION RECORDS ONLY REVISED TO INDICATE CONSTRUCTION RECORDS REVISED BY: TERRY VAN WECHEL DATE: JULY 20, 2012 CONTRACTOR: SHORELINE CONSTRUCTION THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BY ROTH HILL, LLC. MOST FIELD INFORMATION PROVIDED BY OTHERS. ROTH HILL HAS NOT VERIFIED THE ACCURACY AND /OR COMPLETENESS OF INFORMATION PROVIDED BY OTHERS AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED AS A RESULT OF ERRONEOUS INFORMATION PROVIDED BY OTHERS. v� aF WASg�+���(P (y MJL `yap UB .p 45274 2' duxx TvW FEeISTERF'9� aEESm �SSIONAI. NO. REVISION BY DATE APPR MI ME a 6 NII. MI Mn SCN£ MLCflCPl0.T amorx: w.w ism IMMBpITIL ,� ,sm „�, DATUM SHEET INDEX CIVIL LEGEND COVER SHEET C2 EXISTING PROPOSED G SM CATCH BASIN (MH) C5 SANITARY SEWER GRAVITY MAIN C6 CB CATCH BASIN O' SANITARY SEWER MANHOLE -c- UP UTILITY POLE C10 STONEGATE LIFT STATION ABANDONMENT PLAN N LS LIGHT STANDARD -----'-'--'-' SANITARY SEWER FORCE MAIN WET WELL AND OVERFLOW FACILITY SECTIONS C14 WET WELL PLAN, SECTIONS AND DETAILS C15 VALVE VAULT PLAN, ELEVATION AND DETAILS O GP GUY POLE - - - - - - - - - FRENCH DRAIN ❑ UB UTILITY BOX OR VAULT x SECURITY FENCE c WV WATER VALVE CONTROL BUILDING HVAC AND PLUMBING PLANS, SECTIONS AND DETAIL STRUCTURAL S1 GENERAL STRUCTURAL NOTES S2 _ _ _ _ _ PERMANENT SEWER EASEMENT 0 MON MONUMENT S5 CONTROL BUILDING SECTIONS AND DETAILS S6 WM WATER METER OVERFLOW STORAGE VAULT PLAN, SECTIONS AND DETAILS TEMPORARY SEWER EASEMENT A FH FIRE HYDRANT - - -W WATER SERVICE LINE ONE LINE DIAGRAM MB MAIL BOX E5 CONTROL BUILDING ELECTRICAL PLANS E6 WET WELL AND VALVE VAULT ELECTRICAL PLANS E7 —P UNDERGROUND POWER LINE -'=RS E9 ROAD SIGN E10 ELECTRICAL DETAILS 2 Ell SG SIGN O CONCRETE SURFACING 12 1 PROCESS AND INSTRUMENTATION DIAGRAM: LIFT STATION LANDSCAPING L1 LANDSCAPING PLAN C Cam_ ROCKERY DASPHALT SURFACING 1_1a SANITARY SEWER MANHOLE - - - - - - - - SANITARY SEWER GRAVITY MAIN D LANDSCAPING --- - - - - -- SANITARY SEWER FORCE MAIN o CLEAN OUT - - -cr WATER MAIN ----- SD-- - - -SD- STORM DRAIN LINE PROPOSED CONTOUR - - - - - -� CONCRETE CULVERT r UNDERGROUND TELECOM LINE P UNDERGROUND POWER LINE EDGE OF ASPHALT CONC. PAVEMENT (ACP) FLOWLINE ROAD CENTERLINE RIGHT OF WAY NORMAL CONTOUR ELEVATION - INDEX CONTOUR ELEVATION CONIFER TREE DECIDUOUS TREE tv4.•w aF WA-,,& FIHILL FP �� Yam 311847 4 Roth Hill, LLC Tel 425.869.9448 www.rothhill.com ��OF FAGIsTERF9 w 11130 NE 33rd Plaoe, Su@e 200 Bellevue, WA 98004 �SStoxat� CONSTRUCTION SEQUENCE 1. ATTEND PRE - CONSTRUCTION MEETING. 2. OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS BEYOND THOSE PROVIDED BY CITY (SEE SPECIFICATIONS) AND ANY NECESSARY AGREEMENTS WITH PROPERTY OWNERS PRIOR TO COMMENCING WORK. 3. COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING. STAKING TO BE PROVIDED BY CONTRACTOR. 4. INSTALL PERIMETER PROTECTION AND TEMPORARY EROSION AND SEDIMENT CONTROLS AND TEMPORARY STORMWATER TREATMENT FACILITIES (BAKER TANKS, ETC.). 5. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH KING COUNTY AND CITY STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT THE PROJECT. 6. CLEAR AND GRUB SITE. 7. INSTALL DEWATERING SYSTEM AND DEWATERING OUTFALL AREA AND BEGIN DEWATERING OPERATION AS NECESSARY. 8. INSTALL WET WELL, OVERFLOW VAULT, AND VALVE VAULT AND BACKFILL EXCAVATIONS. 9. CONSTRUCT GRAVITY SEWERS AND FORCE MAINS. 10. GRADE SITE AND INSTALL UTILITIES. 11. CONSTRUCT CONTROL BUILDING. 12. INSTALL ELECTRICAL AND CONTROL SYSTEMS, GENERATOR SET, AND ALL RELATED LIFT STATION APPURTENANCES. 13. CONSTRUCT STORMWATER IMPROVEMENTS ON NEW STONEGATE SITE AND NILE AVE NE. 14. PERFORM TESTING AND START -UP FOR STATION. 15. ABANDON EXISTING STONEGATE LIFT STATION AND CONNECT TO GRAVITY SEWER. 16. ABANDON EXISTING SUMMERWIND LIFT STATION AND CONNECT TO GRAVITY SEWER. 17. PERFORM FINAL GRADING ON NEW STONEGATE SITE. 18. INSTALL LANDSCAPING PLANTS. 19. CONSTRUCT IMPROVEMENTS IN NILE AVE NE AND PERFORM SITE RESTORATION. 20. REMOVE TEMPORARY BMPS ONLY AFTER ALL DANGER OF EROSION HAS PASSED AND AFTER APPROVAL BY CITY. 21. CLEAN STORM SYSTEM PRIOR TO USE. DO NOT FLUSH CLEANING WATER DOWNSTREAM. 22. PREPARE AND PROVIDE O & M MANUALS PER SPECIFICATIONS. 23. PROVIDE CONSTRUCTION RECORD DRAWINGS. NOTE: THIS IS A POSSIBLE SEQUENCE. FINAL SEQUENCE SHALL BE DEVELOPED BY CONTRACTOR AND SUBJECT TO REVIEW BY OWNER. �F nASII: 37847 FOR CONSTRUCTION RECORDS ONLY REVISED TO INDICATE CONSTRUCTION RECORDS REVISED BY: TERRY VAN WECHEL DATE: JULY 20, 2012 CONTRACTOR: SHORELINE CONSTRUCTION THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BY ROTH HILL, LLC. MOST FIELD INFORMATION PROVIDED BY OTHERS. ROTH HILL HAS NOT VERIFIED THE ACCURACY AND /OR COMPLETENESS OF INFORMATION PROVIDED BY OTHERS AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED AS A RESULT OF ERRONEOUS INFORMATION PROVIDED BY OTHERS. v� aF WASg�+���(P (y MJL `yap UB .p 45274 2' duxx TvW FEeISTERF'9� aEESm �SSIONAI. NO. REVISION BY DATE APPR MI ME a 6 NII. MI Mn SCN£ MLCflCPl0.T amorx: w.w ism IMMBpITIL ,� ,sm „�, DATUM SHEET INDEX CIVIL Cl COVER SHEET C2 SHEET INDEX AND LEGEND GO E)('G:F'PjGSI:FE74cPlB:FEGGP60t?I NOT INCLUDED IN CRD SET NOT INCLUDED IN CRD SET C5 SEWER PLAN AND PROFILE C6 NILE AVE NE ROAD AND SIDEWALK IMPROVEMENTS AND DETAILS C7 LIFT STATION SITE PLAN C8 GRADING AND DRAINAGE PLAN C9 SITE DETAILS C10 STONEGATE LIFT STATION ABANDONMENT PLAN Cl l SUMMERWIND LIFT STATION ABANDONMENT PLAN C12 WET WELL AND OVERFLOW FACILITY PLAN C13 WET WELL AND OVERFLOW FACILITY SECTIONS C14 WET WELL PLAN, SECTIONS AND DETAILS C15 VALVE VAULT PLAN, ELEVATION AND DETAILS C16 LIFT STATION DETAILS ARCHITECTURAL Al CONTROL BUILDING FLOOR PLAN AND SECTION A2 CONTROL BUILDING ELEVATIONS A3 CONTROL BUILDING DETAILS MECHANICAL M1 HVAC AND PLUMBING SCHEMATICS AND EQUIPMENT SCHEDULES M2 CONTROL BUILDING HVAC AND PLUMBING PLANS, SECTIONS AND DETAIL STRUCTURAL S1 GENERAL STRUCTURAL NOTES S2 TYPICAL CONCRETE NOTES AND DETAILS S3 TYPICAL MASONRY NOTES AND DETAILS S4 CONTROL BUILDING FLOOR AND ROOF FRAMING PLANS S5 CONTROL BUILDING SECTIONS AND DETAILS S6 WET WELL PLAN, SECTIONS AND DETAILS S7 OVERFLOW STORAGE VAULT PLAN, SECTIONS AND DETAILS ELECTRICAL E1 ELECTRICAL ABBREVIATIONS AND SYMBOLS E2 ELECTRICAL SITE PLAN E3 ONE LINE DIAGRAM E4 MCC ELEVATION E5 CONTROL BUILDING ELECTRICAL PLANS E6 WET WELL AND VALVE VAULT ELECTRICAL PLANS E7 OVERFLOW STORAGE VAULT PLAN E8 SCHEMATIC DIAGRAMS E9 ELECTRICAL DETAILS 1 E10 ELECTRICAL DETAILS 2 Ell ELECTRICAL SCHEDULES INSTRUMENTATION 11 PROCESS AND INSTRUMENTATION DIAGRAM: LEGEND 12 1 PROCESS AND INSTRUMENTATION DIAGRAM: LIFT STATION LANDSCAPING L1 LANDSCAPING PLAN :L M CITY OF AN RENTON Planning /Building /Public Works Dept. STONEGATE LIFT STATION REPLACEMENT SHEET INDEX AND LEGEND 5 - - 4130;-- 6/25/2010 vice owsnc w. C2 2 X42