Loading...
HomeMy WebLinkAboutS-3620030 O Z Z a E J 1 • ?�Z U.1 0 W � Nw a 0 LL z y 00 F- �W a rn c 9 rn c a N ' aie�e a I Z O N W tr d Z I PID: 1023059382 I [SSMH 28 I STA 13 +23, 5'RT ON PROJECT# S327kDGEWOOD LANE: 13 +23 RIM =424.3 W IE =411.5 BRETZKE 6 + 63.60 H .CB d5 R_a -W TE =424.67 >'. N IE 420.27(E) v 1E= 420.32(W) d'L� ASPHALTIROAD,' \ d!11■�//�����y�'"y�����1.�'i} { .1. V UBLI�ROADWAY "v �"X S88'1610" I' 1 33 E 60 91' 0 =W C�L i. .. - B„ -"''l SS `-61-08„ N. �.. CAdC'D EXISTING 5' SIDEWALK SjM d`Ty,� \ \\ \\ dry9 p\ \ \ �\ d� ^• \ _R_O_W / CJ/Tc.2 -'C\ \NO N`\ -V\ \\ \ IV 6 '�N S88D76'i(� _ .� 438 �.LEV. 415.3' \ ELEV. B115s' \&132 WILE \ > 'RV36 \ \ \ I\p'y A \\ EL V 416.0' ELEV 47 2' \ y, \36" \ \ \ \ \ 436 \ N \\ \N \p \ \ 434 \ 5' IIIIWIL CONTRACTOR TO wLB6 m STAKE AND LAG ELEV. 41 .di WETLAND BU i ER w 1, EDGE PRIOR iTO 1 CONSTRUCTIIN \ WLB6 ELEV. 415.8 111 at 1i I � 0 oz W I 0 a- 0 �LiF W �G CD W L)U - -- �zQQ LLJ Q 0- IL a I Z O N W tr d Z I PID: 1023059382 I [SSMH 28 I STA 13 +23, 5'RT ON PROJECT# S327kDGEWOOD LANE: 13 +23 RIM =424.3 W IE =411.5 BRETZKE 6 + 63.60 H .CB d5 R_a -W TE =424.67 >'. N IE 420.27(E) v 1E= 420.32(W) d'L� ASPHALTIROAD,' \ d!11■�//�����y�'"y�����1.�'i} { .1. V UBLI�ROADWAY "v �"X S88'1610" I' 1 33 E 60 91' 0 =W C�L i. .. - B„ -"''l SS `-61-08„ N. �.. CAdC'D EXISTING 5' SIDEWALK SjM d`Ty,� \ \\ \\ dry9 p\ \ \ �\ d� ^• \ _R_O_W / CJ/Tc.2 -'C\ \NO N`\ -V\ \\ \ IV 6 '�N S88D76'i(� _ .� 438 �.LEV. 415.3' \ ELEV. B115s' \&132 WILE \ > 'RV36 \ \ \ I\p'y A \\ EL V 416.0' ELEV 47 2' \ y, \36" \ \ \ \ \ 436 \ N \\ \N \p \ \ 434 \ 5' IIIIWIL CONTRACTOR TO wLB6 m STAKE AND LAG ELEV. 41 .di WETLAND BU i ER w 1, EDGE PRIOR iTO 1 CONSTRUCTIIN \ WLB6 ELEV. 415.8 at 1i I � 0 oz W I 0 a- 0 �LiF W �G CD W L)U - -- �zQQ LLJ Q 0- IL • 1 ,B UTr FE'R dry %,A AVE`RAGI'NG \ \ \ 1 N� \ \ \ELEV. 416JI \ WLB8 \ \ m 415 t 41Z t 1 \ \ > \435.5 415 \\ \ \ n\ \ \ \- \ m ELEV. \$^ N \ \ \ WLB10 \ \ V ELEV. 415.6' \ \ \ \ > a \ CITY OF TON\ \ \ SEWER f IT - \ \ \ \ E1 /2, SEC. 10, T. 3 ., R. 5 E., W.M. PID: 1023059370 INSTALL 29 ASPHALT COLLAR AROUND SSMH 1 N \ I ddy I' : 1 •� I .r'ky ^.' I'u .. A s HP s s L • ado $P \� +DO/ o\ d,• \d' \\ yf� `Fgs\ dd \\ \ \\ \ h�!° \ \4st00 •�\ � \ S 'd • •' d'h °�\ d \\ 1\ \\ dd ^• \\ \g`r° Asa d \\ \ \'`rs \\ \ 337.65' \ \ � \ \ • \ � Ry \ \ .`ti \ \ \ \ \ \\ \\ d6d\ \ •d v -�- O 70.00'\ \ \ \�O.q�7•`L \ \ \ 15 � Q • H �^ -� ^/-472?` ^ryd ^`V o d.V^ d10 d1 °/� �°� "\ d -470 d Al0� -. -0H \ - - -- \ -468 d�0 46 • 'OF d • EDGE OF ASPHALT LOCATION db° W dye SEWER. CME `CALL' $y8�0 Ems' .nn oo SS B. •^ ,a, SS B $S' B" SS • Ort • ^ .. ° DG F SPH L7. .UI' '.• d0� 'G°'\ 0 D:W APRON o cc ASS d °e i SITE BENCH MARK: oq de r•( o, y CATCH BASIN o O O CONIC dy P2 +00RIM ELEV= 469.24' d / I U o - S88'6'f0"E M690 "E - 100.04' �- S88 70.03' i s\ \\ \\ JOP OF S OPE m\ Asp N\ ,y xSy\ \ \R 1WQ A X 01 y\ \ \\ ss\ \\ \\ .,¢ \�, d`0g Erosion Control Notes d \ \ \ �5 /Idy9• LOT B \do¢o \'I. 1. These notes shall appear for all projects - site improvements, surface water 60 \ \ -4 G utility, wastewater utility, water utility, and transportation plans: 0 \ \ \ \ \ " rs .. o. 4 897 \� \ \ \ \ 3s d \ �, 2. Before any construction or development activity occurs, apre- construction / s \ TOE OF SLOPE ddo \ \\ \ \ \ \010 \ \ \ \ N \ . 6? meeting must be held with the City of Renton, public works design engineer. 3. The Boundaries of the clearing limits and areas of vegetation preservation as BRETZK s \ o IN P rescribed on the plan(s) shall be clearly flogged by survey tape or fencing in the 2 o x o field prior to construction in accordance with Appendix D of the Surface Water Design Manual and observed during construction. During the construction period, no \ \ \ dN ' w N \ \ 1dd!ry�, RReP N • a \ \ y \ \ A 0 °� \ disturbance beyond the clearing limits shall be permitted. The clearing limits shall be maintained by the applicant /ESC supervisor for the duration of construction. ° D BRETZK \ h \\ \� iv N LO 's' RRd'•\ z d RBA � \ \\ \\ sd' 11 R \ o o '9.pQps�.. dd \ \ \ \ \ \ \ ''.1:4' °; 4. Stabilized construction entrances shall be installed at the beginning of construction \ A� �w '��• \ RRO Fi Fy`�sF�s r \\ °\ \\ \ ti' • ^\ and maintained for the duration of the project. Additional measures, such as \ m d I ( o•<"o -�s2 sz o \ As '+ bro I \;� constructed wheel wash systems or wash pads, may be required to ensure that ail \ I �� 9s o,'o \ \ N d`O paved areas are kept clean and track out to road right of way does not occur for 1 "' s ddb 1 \ \ As the duration of the project. O \ \\ y`'RS \\ 5. All required sedimentation /erosion control facilities must be constructed and in \ R\ -Z y\ y \\ •d \\ \\ d \ \ \ \ •' 4 operation prior to land clearing and /or construction to prevent transportation of sediment to surface water, drainage systems and adjacent properties. All erosion \ \ \ yti�d \ \A \ °sp and sediment facilities shall be maintained in a satisfactory condition until such time v 438 \\ \\ t \ \ \ \ \ \ Rss that clearing and /or construction is complete and potential for on -site erosion has \\ �,,� 2 I\ y% passed. The implementation, maintenance, replacement and additions to \ d 436 \\ \ \\ \ 4 ¢.38 -OKI A� \\ \\ \ \\ \ ^: '�I�. \I,.'i \" erosion /sedimentation control systems shall be the responsibility of the permitee. 00 7n.00_ A\ \\\ ep° \\4¢ \` \\ \\ \ / - 4 6 \\ 6. The erosion and sedimentation control systems depicted on this drawing are \ter intended to be minimum requirements to meet anticipated site conditions. As \ \ \ \ \ \ \ \A \ n ^ ,\\ \�R3a \d \ °ERR \RRR\ construction progresses and unexpected or seasonal conditions dictate, the permitee \ \ \ > N \ \ \ \ 70 .= °\: y °. �\ shall anticipate that more erosion and sedimentation control facilities will be \ Np N \ A \ ° '�\.., Rp' 7- necessary -1.n �\ °`r� - necessary to ensure complete siltation control on the proposed site. During the \ \ \ wp 15 CITY' F REN'TON SEWER AND CES A iEN \ \� d� : \. WLB11 \ .. _course of construction, it shall be the obligation and responsibility of the to \ > \ \ \ \ \ �C9 \ s; address an new conditions that may be created b the activities and to Provide 'EV. 415.3' \ \ N \ :. 35. - \�- .\ .. 4�' .\. \ Y Y Y P \ \ \ \. N \435.5 \ ,^.. '\ ^�.. \ra'..� . �\ additional facilities, over and above minimum requirements, as may be needed, to \ \ \ \ > \ \ w - - ��. protect adjacent properties and water quality of the receiving drainage system. JOINTS IN FILTER FABRIC SHALL IN SPLICED \ \ \ N� \ ^ \ s \�� AT POSTS. USE STAPLES, WIRE RINGS, OR \ \ \ \ \ + EQUIVALENT TO ATTACH FABRIC TO POSTS. 2 "x2" BY 14 Ga. WIRE OR �� \ \\ \ \\ \ \ \\ O \ ¢42\ R \ °, �\ \ \- 7, Approval of this plan is for erosion /sedimentation control only. It does not EQUIVALENT, IF STANDARD ^ \ \ \ d^ constitute an approval of storm drainage design, Size nor location of pipes, STRENGTH FABRIC USED \ \\ \ \ d \ OSIO \� �\ \ \\ \ \ \, restrictors, channels, or retention facilities. \ A \ \ C TROL - -- \ FILTER FABRIC \\ \ \\ \Aas \ \FENCING R3a 4ti \\ \ d6 \ \ Q -`� 8. Any areas of exposed soils, including roadway embankments, that will not be \ \ \\ \\ \ ,JNSRA'LkED \ \\ \ �6 \ N disturbed for two days during the wet season October 1st through March 30th or z NS R3 m --- R Y 9 ( 9 ) 'I_B \ \\ \ A ?A \\ %'�I'I�A C�it�R ^ o � \� -4s2`` R\ \\ d,SA \ \ °�� R'seven days during the dry season (April 1st through September 30) shall be N 18.0 \ \ \ \ \ DETAI0 sO\ py y` \ \ immediately stabilized with the approved ESC cover methods (e.g., seeding, d mulching, plastic covering, etc.). \ \ d 0 \ m TZKE d \ \ a 9. Wet season seasonal erosion and sediment control requirements apply to all OT 4 ^ �R BRETZKE\ \ LOT 3 \ construction sites clearing between October 1 and March 30 inclusive, unless 6' MAX. MINIMUM 4 "x4" TRENCH otherwise approved by the City through an adjustment process. BACKFILL TRENCH WITH \Y` BA \ \ NATIVE SOIL OR 3/4 " -1.5' \ \ A`'? \\ \\ \\ \\ �32g Sp \\ dam' \\ 10. Cover measures will be applied in conformance with Appendix D of the Surface POST SPACING MAY BE INCREASED WASHED GRAVEL WLB \\ \ \ \ 4_,,..- -430 \ \ \\ \�Z: Water Design Manual. TO 8' IF WIRE BACKING IS USED ELEV 427. '\ \ \\ '.\ \ d-y° \ po \�R d'y`ti : R,J 2 "x4" WOOD POSTS, STEEL FENCE \ \\ \ \ \\ °z 3 ?�.- 432'tc'y�\ w 11. Any area needing ESC measures, not requiring immediate attention, shall be NOTE: FILTER FABRIC FENCES SHALL BE POSTS, REBAR, OR EQUIVALENT \ \ \\ p's� \ \ d`ti \ a addressed Within Seven (7) days. INSTALLED ALONG CONTOUR WHENEVER POSSIBLE \ \ \ \ ° 012. The ESC facilities on inactive sites shall be inspected and maintained a minimum z of once a month or within 24 hours following a storm event. \ SILT FENCE MAINTENANCE STANDARDS: \ \ \\ d \\ d 413. At no time shall more than one (1) foot of sediment be allowed- to accumulate � \ ` P \ � „ \ L \ \ within a catch basin. All catch basins and conveyance lines shall be cleaned prior to 7. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. \ \\ �R\ `R2s \`R paving. The cleaning operation shall not flush sediment -laden water into the 2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO \ \R \\ \ - ?g\\ `� �\ downstream system. A SEDIMENT TRAP OR POND. - \ \\ \� \`. X14. During the time period of October 1 st through March 30th, all project distributed 3. A IS IMPORTANT F CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING IF T ACTING \ \ AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOW PARALLEL TO THE FENCE. IF THIS F ° ?s '428 /�\ soil areas greater, that are t0 be left un- worked for more than 12 hours, shall be OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. ELEV. 421.0' \�\ `�4 ?� \\ 428 A %gdti^ \\ covered by mulch, sodding Or plastic covering. 4. SEDIMENT MUST BE REMOVED WHEN THE SEDIMENT IS 6 INCHES HIGH. EL B� 2- WL �\ , e5 \ dry0 ELEV. 423.6' ELEV A24. \\ dn' \ 15. Any permanent retention /detention facility used as a temporary settling basin 5. R THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE �l \ \ � shall be modified With the necessary erosion control measures and shall provide REPLACED. R �s� adequate storage capacity. If the permanent facility is to function ultimately . as an \� \\ infiltration system, the temporary facility must be rough graded so that the bottom \ 43g\7 Viand sides are at least three feet above the final grade of the permanent facility. F SILT ENCE - -- -- -- -- -- -- 100.04' - \ \ �o.°a" s882o'oz "E 331.77• -�16. Prior to the beginning of the wet season (Oct. 1), all disturbed areas shall be NTS '........ % reviewed to identify which ones can be seeded in preparation for the winter rains. ',. �,,,,.,,,•,,,•.� __, R -4 Disturbed areas shall be seeded within one week of the beginning of the wet season. A sketch map of those areas to be seeded and those areas to remain uncovered shall be submitted to the City of Renton for review. O N W W V) CL 4) Ma M _(D (0 L Ln ri SHEET: 3 OF: �I U 1i ► � 0 • 1 i .. W W V) CL 4) Ma M _(D (0 L Ln ri SHEET: 3 OF: �I U