HomeMy WebLinkAboutT-142401OO ze
rms G22vm4cT
A017-7, W CrK17,X0 PANEL -40HJS�ULE
NO.0
/LYAT /ON. STE7r61B R..SW SSW5TH C- kVZ,.S / PHf1SE '3 WIRE
+!L-
SET�Y //lam ^.�R�TL/GHT /r1.G !a0 fNOP with M.4/N C /FtYI /T 6RPAk..4
LyrT
L0900E R /PTILW
/fVA
TRiP TRiP
KIG9
!1J'70 LL /4fPlfON
r1fT
Connect a #8 copper ground to the ground buss and pull the three wires
AMP5 .4MP5
20 20
-
NO.
to pole 4 at Maple Avenue S.W.
4. Intercept the existing conduit between poles 4and 5, at a point closest
/. /
ST. 21CW,'S 6, 7-9,5` 5`
0
after disconnecting wiring in pole #4 base, pull wiring back.to "cut"
-
/.1
20
at this location as shown on the plans as J.B. #1. From this junction
box also install a 1 -1/2" conduit to the existing Maple Avenue S.W.
9
3Y/JGH75 /8./9� 2/.22 %3
A/
'.. plans. The three #8 wires brought from the "street lighting control -
panel" (note 1 above) will now enter this contract's.conduit system and
/O
be installed . according to plans to the termination I pole (24) located on
Hardie Avenue.. See Note 16 below.
5. All disconnections at pole 4 (note 4 above) shall be connected -
/9
/3
15
CANTf7�7U4CAK/f%O7DCPLL
0.5
6. Conduit shall be 1 -1/2" PVC schedule 40 except for street crossing which
05
L?/L/JY RECE.�ACLE
LEGEND:
STREET LIGHT - 150 WATT HIGH PRESSURE SODIUM, 240 VOLTS,
MEDIUM /NON- CUTOFF /TYPE 3 DISTRIBUTION (FIELD ADJUSTABLE),
POWER DOOR TYPE CONSTRUCTION, DROP LENS.
PROVIDE 25 FOOT, TAPERED ALUMINUM, DAVIT TYPE POLE PER
CITY OF RENTON STANDARD,
G 8
_ f — UNDERGROUND CONDUIT 1," CONDUIT WITH 2 #8 CU THW
CONDUCTORS & 1 #8 COPPER GROUND.
El STREET LIGHTING JUNCTION BOX SEE DETAIL, THIS 'SHEET.
PUGET POWER VAULT & STREET LIGHTING TRANSFORMER SEE ONE -
NA LINE RISER DIAGRAM.
0 STREET LIGHTING CONTROL PANEL 'SL' SEE DETAIL, THIS SHEET.
O .STREET LIGHT REFERENCE NUMBER PROVIDE STANDARD WATTAGE
DENTIFICATION DECALS FOR EACH LUMINAIRE (I.E. '15'
DESIGNATES 150 WATT LAMP.)
TYPICAL LIGHTING UNDERGROUND SYSTEM
TO WMINAIRE
TYPICAL DESIGN'B"
JUNCTION BO -
FUSE KITS '
SPLICE KITS " ¢. WMCOx OR[RET[
CLEAR fPOKY SRJCE "Aln L..E NLE D" iaIN
�E Sp / /re kif s ax THRU s - €LC ON EwA N GR
.1 SmEWA
WIRE RUNS. GROUND WG
8M -91Aa� rNIN.cRwT..D �w�I�
�ua /. - uHpEn PGLE Essc.L _
n
LEOuIRE01
G TI G - GROUND
Co u P
srsN . '
TO oTC N
TORS- CONV UIT 1 II
- SYSTEM it u
II
PVC CONDUIT I'
STSTEN - II 11
CONCRETE Ll� �J
FOUNDATIQN',
T SOOR NO
y�.
COPPER -CLAD GREATER POLE HEIGXT
GROUND ROD .GREATER THAN ]O'.
3'3 '.011 FOR POLE HEIGHT
]O'.OR LESS.
11
f
A.
S ` —,
STA NDARD 25 DAVIT POLE
A I I Z44MI �=
bh�, - ow
Note:
Contractor should be aware
that.when changing existing
panel to add circuits of this
contract, care should be taken
to place breakers in a position
where existing wiring will
make connections without
splicing.
EX.ST Ccrrfro /Fd�e/
--5-5-- NOTE 2
G
c� vYi�iizg�l/ueP� ✓urx'Yio� /
o \ �x TO%TO'EXI --'
amine/ C
/ 5
6y VZ
ti a e8 N
G
A = EX /ST /NG ✓UNCi /ON FOXES
ON EX15T /NG 1%2a CONOU /T
\ SEE NOTE 4
A
�/
4 7J�v-
i 7qc
�0
�Q^
G
GENERAL NOTE
Work provided and performed on this plan shall be accomplished in
accordance with the State of Washington Standard Specifications for
.Road and Bridge Construction, latest edition- and :; -nt: ;n '- tar.dard -- CG
When conflicts occur between these plans and the Standard Specifications, `SPE(�1F /CA% -1QN`5 4V AOrif `�' '-
these plans shall prevail.
TYPICAL LIGHT BASE AND JUNCTION BOX
LOCATION ZLIAVI/.4 /RE STAT /ON
III. LINE
�__ —_ -- - - - - - -- 31BEWALX '
CURB 11B 25>-G2. 47 RT X26 � I
i / , 1➢9 27 - OS. /0 LT C2SC j
ROW, t
gJ 28 7- 72. RT 0(2Bc
1 tuna 21 119 * 90..35 LT C>2 ? c
__ —___ :gt— — SIDEWALK Q2 .J/ +,32. J7 /7T (]35c
n/W LINE 7a. S5'*Z LT. 63/
TYPICAL PLAN . VIEW *Z4 8 f --a. 55'i' LT.
EREO A
IAII A1111 -11
s•TIN Nc ER �e r,.r
wow s.x scREws.
- JUNCTION BOX- DESIGN "S"
SA G OvE T TEFL
0 _
PATTERN)
I I
1
L
q
�46 GA WELDED WIRE LOOP
GAL' STEEL PRANE ANCHORED IN PLACE �
(O AUGxp PATTERN) / 4
sE:rioN A A r
SECTIOry B B
'W HARD /E A ✓ENUE SW. S74710,YIVIC
$7FCo,�,e4, mcy he -1;, n7a / /r9� @ .r /a',*4e.
-Y-Xy 7hi+
ryAfPO/ 4]ievC .
�OISST(L�c ��j� - NO AS- (3UJL� Avpl�,
Poi zs " e4 clt,/y
0«.115' 6"
25' -O :Ilh'
��Pi3No.8
=.� lJelar %Q%ctr -
✓ -lox o7FL- ✓e�.�. �2B/✓ot� rVo.
Col✓ff7�= T/ .ra�,L= 4,77i,
/�D�E -B48E NTS
✓ -Box ofPo /G BL�sB
Concr -efe Sic��vo /K
i. Power source shall be from an existing street lighting control panel at
Stevens Place S.W. and S.W. 5th Court.
16. At contractor's option, in lieu of pulling 2 #8's in existing
conduit, may install a new 1-1/2"o PVC, Schedule 40 conduit
behind S/W from S -box #1 to control panel for connecting
luminaires #18 thru #24 to service per note 2, above. If this
option selected, an intermediate pull box will be .required and
a #8 groundwire.
_
2. Add one (1) 20 AMP, .240 V breaker to the existing panel and identify and
SEGT /0A1Z00 <1A14:7 1OR711
label, "Circuit 7 ". Note: The actual.load connection shall be initiated
F r n a eerie cy der c1a. c
surface finish around all J_boxe-. "4ee _:,a_ ! t tai
by the contractor in coordination with PSP &L,. Contact CHG prior to
HAiPO /E AYE/VZE SirY lyr5i
installation.
an -d �unctior box detail.
3. Connect 2 - #8 THW copper conductors to the load side of the breakers.
Connect a #8 copper ground to the ground buss and pull the three wires
into the 1 -112" existing conduit containing 4 #8 and 1 #8 ground wires.
This conduit will be the one connecting to the existing pole #9 and then
to pole 4 at Maple Avenue S.W.
4. Intercept the existing conduit between poles 4and 5, at a point closest
to pole 4. (See Drawing E1 of Cross Engineers) Cut the conduit, and
after disconnecting wiring in pole #4 base, pull wiring back.to "cut"
-
location and install two factory "L's ". Install a Type "B" junction box
at this location as shown on the plans as J.B. #1. From this junction
box also install a 1 -1/2" conduit to the existing Maple Avenue S.W.
crossing, and J.B. #2 (to be installed by this contract) as shown on the
'.. plans. The three #8 wires brought from the "street lighting control -
panel" (note 1 above) will now enter this contract's.conduit system and
be installed . according to plans to the termination I pole (24) located on
Hardie Avenue.. See Note 16 below.
5. All disconnections at pole 4 (note 4 above) shall be connected -
immediately so that the existing lighting system will function without
_ interruption. -
6. Conduit shall be 1 -1/2" PVC schedule 40 except for street crossing which
will be 1 -1/2" galvanized steel. Crossings shall be jacked, pushed or by
gopher. -
7. Street Light - 150 W.,H.P. sodium, 240 volts, medium non- cutoff /Type III '.. -
- distribution (field adjustable), power door type construction, drop lens
type: - -' -
8. Provide 25', tapered aluminum, davit type poles per City of Renton
Standard.
9. .Contractor is cautioned to use care in trenching as PSP &L underground is
in the same vicinity as shown on the plans. PSP &L is 36" + or - under
ground and this contract calls for 24" cover. The Maple Avenue crossing
/✓cw
location is approximate as are all condui't details as shown onplans.
.I .t $
All utility work i- nvolved should be coordinated by the contractor with
PSP &L and PNWB before trenching, pushing or pole base excavation. is
initiated. — -
10. Junction boxes shall be Type "B ". See City of Renton Standard.'
.r 51xr6'11.
Poles shall have 8' mast arms.
12. Locate pole bases at sidewalk per details. —142 4
13. Street Light Reference Numbers: Provide standard wattage identification
:'. decals for each luminaire (i e 15 designates 150 watt lamp)
14. Pole r D numbers shall be installed as o -vn on is sla s and
hall be proxin tel 1 above curb. Tetters add lum'ller�
shah be j' h n and z d a s , -. ...
decals as an _oved by the City of Renton
15. Locations shall be staked in field by Engineer. -
✓ -Box ofPo /G BL�sB
Concr -efe Sic��vo /K
G �Y 4Z R,-
Q` /
$Aq'�
= °
- -._
zi
16. At contractor's option, in lieu of pulling 2 #8's in existing
conduit, may install a new 1-1/2"o PVC, Schedule 40 conduit
behind S/W from S -box #1 to control panel for connecting
luminaires #18 thru #24 to service per note 2, above. If this
option selected, an intermediate pull box will be .required and
a #8 groundwire.
_
'
SEGT /0A1Z00 <1A14:7 1OR711
F r n a eerie cy der c1a. c
surface finish around all J_boxe-. "4ee _:,a_ ! t tai
-.s
HAiPO /E AYE/VZE SirY lyr5i
� "
APPROVED BY
Public Works D ector
an -d �unctior box detail.
Q
z 8
w Q
� = U
V In
Z
2 '
Q
J
O. W
�z
z0
Ilr Z
LL
Vj
`M
0
SHEET
I of 1
)OB NO.214--,,?. 49n
b' P
AL