Loading...
HomeMy WebLinkAboutT-159201REVISIONS I SYMML I DESCRIPTION OF CHANC7E u II PIP, NOTES-- .6ENEIRAL-NOTEA- PROPOS 1. All work and materials shall be in conformance 1. Contractor shall furnish am install a contactor PROPOSED Cabinet, as follows: with the standards and specifications of the City '1; r6L D G I of Renton and AnWA Standards and Specifications a. Weather proof, free-standing cabinet with 51-0c., 2 W (1981 Edil-- "on). lockable hinged door, including: 16 - circuit panelboard, 120/24OVo with 2. It shall be the contractor's responsibility to 100A 2P main breaker, (2) 2M 2P and PROPOSED verify the correct location of existing utilities (1) IM S.P. branch breakers- N E 6'-H C T. so as to avoid damage or disturbance. * 1 - 30A magnetic contactor, and provision for 3 others. 3. All construction is subject to the inspection by *''1 - lest switch (to-override photoelectri the City of Renton and the contractor shall control) notify time to the City of his schedule in sufficient * 1 -Test plug for utility use. permit inspection prior to and during the work. Contactor Cabinet shall be Skyline Electric Model M.E.B.48412 4. Prior to beginning work arrangements shall be mkimle with the City of Renton for a PRE- b. Cabinet shall be mounted an a concrete CONSTRUCTION CONFERENCE to be attended by the pedestal projecting Z' above grade and 22' PRIMARY URD I -HANVNOLF_ PAD-VIT0. XFMR- contractor, City of Penton and other below grade, 2" beyond the base PUGET POWER) 05Y PUGET POWER) POWER) representatives of interested utilities. t,,jrf 1liMbinet on all, sides. 55C Ymcm Contractor shall secure cabinet to pedestal -(4) 1/2* ic 161 anchor- bolts embedded in _JUNCT ION Bok 5. It shall be the contractor's responsibility to with see re all necessary permits prior to starting concrete. PUGET CUTS SIDE- '10 D conustruciton. -type CONTRACTOR WALK; CONTRACTOR CTOR 2. Contractor shall furnish and install a davit PATCHES 6. The contractor shall keep an accurate record of a] minum street lighting pole, anchor-base type, construcion; 'AS-BUILT OMINGS' shall be with horizontal extension suffincient to extend at provided to the owner or his representative after least 2 feet (and no more than V) beyond the curb completion of the work and before FINAL PAYMENT at street edge. for the work. HAPCO. Cat. No. 41-M (61 am) or equal. CONSTRUCTiON 5Y PUGET ROWER Concrete base shall be V dia. and 3' deep, with 11 anchor bolts embedded, and 1' of girout between UGET_ INSTALLS 4X-0- base of pole and top of footing, CONTRACTOR PATCHES SIDEWALK Contractor shall provide luminaires as follows; TYPICA L PLAN VIEV% CC",CFF_-F P-1- (a) For unit- nearest contactor cabinet, General CVEk STREET LIGHT F1_UND_'T1CN El.tric,"'. im. to cat. no. C64211511, except r filter optics (incl. P.E. receptacle). (b) For otherluminaire, General Electric sian- to cat. no C642N531, except filter optics. 201 W -3V ;7 51,11, L i li,1 1o,e E.. TO LMNAIRE JUNCTION BOX C-,-.­!,e F,1 _/ -E PRovucTs 741590201 X—TE REwToti CoNCRET LUMINAIRE CAT_ NO. J205-H PE CONTACTOR CAP CON ACTOR CABI NET EUR MTV TW 41F COMOM (SEE E.LEC NOTE. 1) I SPLICE KITS Put DiStONUMT 10 AMP IN 1 LINE FUM MWbarm To og Lev" 9M "V 1AITS-&Et ON 1EC:AL--" CLEAR EPDXY SPLJCE- __STREET KITS ON AIL 00 SIDEVIA" ON 1 ­4 WIRE RUNS_ __1SS\ CUR& STANDARD GROUND LUG I" MIN. GoWT. U"ER POLE GRAM HOLE kn N rALUMINUM POLE REQUIRED) ( SEE ELJEL NOTE 2) LIGHTING III FUSE/N5C_ C SYSTEM! GROUND H a MINL MIN- LAMP TO CONTAC­ Il Ii TO PU4GF_T POWER 2 30 TOR PVC PUGET POWER RANCHOLE 'Ii�40 TO 2!- 5T Lir-HT I CONDUIT HANDHOLE t, SYSTEM 11 9 J PVC CONDUIT It I] STREET CLR5 2'!C, — —-10 Z)7HE_R SYSTEM CONCRETE iDEWALK 0U.- 1 8 _0 PPERIVEL 0 PA RE 1 -3. POLE FOUNDATION GROUND P100 STL) I ) : 1 1, STREET LIGHT INSTALLATION 670 UNION DUPLEXES DETAIL- RLENTON C- VVASHIN 70r4 5/8" X 8'0" COPPER-CLAD _-DET-AIL-_ GROUND ROD A. mi Jy�, �­ X _Z1 0 ThOn4aM LOW &LYMS/Enorlem Approvect By: 7.1 11N_E WA� .r=T-AJL 02 __1 __ V6A,.. 941U;L L . a 2,­: �biOl I R OL -Iffiaw, mmimmmut L '1. 9 3' M 84011 SCANNIED . ?M 2 9 1.06�