HomeMy WebLinkAboutT-178301O7. INSTALL ALUMINUM DAVIT STYLE LIGHT STD. W/ 150 WATT HP SODIUM
VAPOR /LUMINAIRE & LAMP -- 25' MOUN771VG HEIGHT.
LUM = M -C -II, GE M25OA2
INSTALL TYPE B" JUNC77ON BOX.
LUMINAIRE SCHEDULE
POLE LOCA77ON
MH
I ARM LENGTH
LUMINAIRE
3 + 00
25'
6'
150 WATTS
4 + 64
25'
6'
150 WATTS
2 o. TJo.
3 725 C
372.7C
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH 7HE CITY OF RENTON STANDARDS
AND SPECIFICATIONS AND THESE PLANS.
2, THE LOCA77ONS OF FEATURES ARE APPROXIMATE AND SHALL BE VERIFIED IN
THE FIELD BY THE CONTRACTOR AS NECESSARY.
J. INSTALL ALL STREET LIGHT LIGH77NG MATERIALS SHOWWN ON THESE PLANS,
EXCEPT AS NOTED. ALL MATERIALS SHALL BE NEW AND OF THE BEST
AVAILABLE GRADE OR QUALITY, EXCEPT AS NOTED.
4. 774E CONTRACTOR SHALL SUBMIT A REQUEST TO 774E CITY OF RENTON FOR
MATERIALS APPROVAL AT 7HE EARLIEST POSSIBLE DATE.
5. ALL WORK SHALL BE CONSISTANT KITH U77L/TY AGENCY REQUIREMENNTS.
THE CONTRACTOR SHALL CONTACT ALL PER77NENT U77LITY AGENCIES FORTY
EIGHT (48) HOURS BEFORE COMMENCING WORK, AND SHALL COORDINATE 774E
WORK WITH THE U77LI77ES THROUGHOUT THE PROJECT.
6. 774E CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXIS77NG
UTILITIESS, THE CONTRACTOR SHALL N077FY THE AFTECTED U77LITY
COMPANY AND THE CITY IMMEDIATLY UPON DAMAGE.
7. THE CONTRACTOR SHALL N077FY THE CITY OF RENTON CONSTRUCTION
ENGINEERING DIVISION AT 277 -5570 FOR INSPEC77ON PURPOSES
TWENTY -FOUR (24) HOURS BEFORE COMMENCING WORK. NO WORK SHALL BE
COVERED (BACKF7LLED) UN77L IT HAS BEEN EXAMINED BY THE ENGINEER.
SCALE 1 " = 20'
LEGEND
\ CONDUIT & WIRING SCHEDULE
® JUNCTION BOX
RUN NO. CONDUIT SCHEDULE EXISTING LUMINAIRE
\ ZO I EXISTING EXISTING NEW LUMINAIRE
\ 2 1 112 PVC SCH. 40 2 - J8 T.H.W. CU.
CONC. PAD
\ 3 1 112" PVC SCH. 40 2 - J8 T.H.W. CU
n
\ i 4 I I /2" PVC SCH. 80 2 - +m8 T.H,yv. CU
Q 2 -2" PVC SCH. 80 FUTURE SIGNAL
C) \
N
f
�
\R H. ?�
J
Za
REMOVE EXIS77NG CONDUIT ALONG ANACORTES
AFTER 7ERMINA77NG ALONG NE SUNSET BLVD.
`
;J
5Dp
�X \
\
STA 0135 -42' RT.
EXTEND 'RIGID CONDUIT AND CIRCUIT TO
N \\
.\
\
NEW JUNCTION BOX LOCATION.
" AS -BUILT PLA ES LATER ED BY
P
TOUMA ENGINNERS FROM A FIELD SURVEY
C)
ruNcnoN Box
\\ \
\ \ 2
\\ INSTALL 2 - 2" COND
V, FUTURE TRAFFIC I �NtAl
\\C N x}00
55 \� ✓/,
STA o +oo.00
ANAC 167 +ALE ME \� / \ v` �. 0
STA 167 + 89.30 `\
NE SUNSET BL6
Z ! 8
G 4
z
Z A
5s?
N; \
50 0,
*TfkOvp4l _ 1153
II
LYJS77NG CONCRETE
CURB AND CUTTER II
_ X14-- .6 "ST— —
r +50 R-124W /.?,Loo
� L 102.16
El —
TV. Box V v
I 24 RR
12" ALDER h
x e
9° ALDER d y
Qr• C�
RECOMMENDED
FOR APPROVAL
By
TRANS Po2T%FT/ oN1
DEVEt-vPMENT .sERvIGES
EQUA 77ON
3 ET PARK
00 APARTMENTS
N
ti SANS
6P I g PHASE I
ryx M� °n Z
�e tix m
'y N
QG y DusnNG CONCRETE
ti CURB AND GU
T777i
\ lr
\ \
— — EXJS7/NG 5' CONCRETE WALK
q
127=_ cn
2' s+oo sm-so �
177, 1g• —
NO l° 44 " E 5 +00 5 +2a 40
ANA COR TES VE. NE 243.70' r — +—
1.
-- ------------------------- NEWS'- CGNCRETEWALK - - -- -------- - - - - -^
2. Nj L_STA 1 +14 -14' RT
f
1 RELOCATE EXISTING STREET LIGHT TO
1 +27 -21.5' RT
\R H. ?�
J
Za
REMOVE EXIS77NG CONDUIT ALONG ANACORTES
AFTER 7ERMINA77NG ALONG NE SUNSET BLVD.
AVE. NE `
;J
STA 0 +30 -5' LT
BNC CONCRETE
CUR RELOCATE EXIST STREET LIGHT TO
CURB AND GUTTER
/ R '
\
STA 0135 -42' RT.
EXTEND 'RIGID CONDUIT AND CIRCUIT TO
.\
\
NEW JUNCTION BOX LOCATION.
" AS -BUILT PLA ES LATER ED BY
P
TOUMA ENGINNERS FROM A FIELD SURVEY
W L
N �
y ET PARK APARTMENTS
SUNS
PHASE II
- �1Fi Nm�i a'6 °e
c
mm
e r
T -X783
gA 109 6