Loading...
HomeMy WebLinkAboutT-206201i TF?U - 1-2062 i LUMINAIRE SCHEDULE POLE LOCATION CENTER L INE OF POLE TO CENTERLINE OF STREET ARM LENGTH MT. LEN67H LUMINAIRE STA 2 +32 19.51 .. q,0• 30.0' 150 WATTS OINSTALL ALUM. DAVIT STYLE L16HT STANOARO WITH 150 WATT HP. SODIUM VAPOR LUMINAIRE, PEC d L4MP,30,0' MO1r, : AG ,EIGHT OINSTALL TYPE B" JUNCTION BOX. OINSTALL STREET LIGHT CONTRACTOR CABINET 120 /240 VOLT TYPE /II GROUNDED NETURAL SERVICE. LUMINAIRE FIXTURE TO BE GE M40OA2 W/ CUT -OFF OPTICS M-C -11 CONDUIT AND WIRING SCHEDULE RUN NO. CONDUIT WIRING 2 - 8 USE /XLP COPPER /Q J 112" PVC SCH. 40 3 - 12 THHN Cu. PEC Q2" PVC SCH 80 3 - -$ ISERVICEI /3\ J 112- PVC SCH. 40 2 - I8 USE /XLP COPPER - �/0 BARE GROUND �rIhF/ PVC SCH. 40 NYLON PULL STRING NW %4 SEC. 9, TWN 23N R. 5 E 3 SCALE 1 " =20' COMMENDED DR APPROVAL �t4o✓ ,aeEaeEZ � 2 PO A 94 JOLT O O 20 AGy gyp• „, j E A ?0100 voZ-r /o B A TEST 15 A 20,A SW/76 B 6 I o B U7 /G. 'G2MrN� PUG A Sea q 0 CieGUr7 wieES 70 L/GNrri'�U ,?/_/rVS Pf�70-CELL B. BLACK JACKET I LINE (NEUTRAL 1 MoU/JT� o/✓ C. GREEN JACKET I GROUND J 1,15AZE67 D. RED JACKET f LOAD) E. GREEN OR BARE COPPER ! GROUND I 679SE7 UG1-/T/1/G CO/V7.4CT0/':Z 0,4611"1E7- 11< C 7 7y/-E Ill 2Y /CE /20/000 ✓OLj GENERAL NOTES 1. All work shall be in accordance with the City of Penton Standard Specifications and these plans. 2. The locations of features shown are approxieate and shall be verified in the field by the contractor as necessary. 3. Install all street lighting eateriais slim on the plans, except as noted. All eaterials shall be new and of the best available grade or quality, except as noted. 4. The contractor shall subsit a request to the City of Renton for eateriais approval at the earliest possible date. S. All work shall be consistent with utility agency requireents. The contractor shall contact all pertinent utility agencies 48 hours before eomencing work, and shall coordinate the work with the utilities throughout the project. 6. The contractor shall be responsible for any duage to existing utilities. The contractor shall notify the affected utility coepany and the City imediately upon daaage. ° – 7. The contractor shall notify the City of Renton Traffic u F C Engineering Division f277-557o) for inspection purposes, 24 hours before comncing work. No work shall be covered until it has been exacined by the engineer. e —20464? S TREE T LIGHTING PL A N REC0,MMENDED FOR APPRTL / /�.i S�YL a 4Xa���L