DIMENSIONS
AREA LIGHTING
A = 0' -2"
B = 7' -0"
C = 2' -0" DIAMETER
POLEBASE DETAIL
NOT TO SCALE
STUB CONDUIT TO 6" BELOW HANDHOLE
WITH GROUND BUSHING
ORNAMENTAL BOLT COVER
NUT AND WASHER TO PLUMB POLE
(TWO EACH PER ANCHOR BOLT)
1" X 1" CHAMFER
TIGHTLY PACKED GROUT UNDER PUCE BASE TO
INSURE FULL CONTACT WITH FOOTING
(PROVIDE WEEP HOLE)
EXPOSED PORTION OF CONCRETE BASE TO HAVE
RUBBED SURFACE '1%
RACEWAY 24" BELOW FINAL GRADE OR AS NOTED
ON DRAWINGS (NUMBER AS REQUIRED)
SONOTUBE FORM (REMOVE BEFORE BACKFILL)
ANCHOR BOLTS AS FURNISHED WITH POLE
USE AUGERED HOLE AS CONCRETE FORM
BELOW SONOTUBE
#4 REBAR TIES AT 12" O.C.
4 #5 VERTICAL REBAR
oaa0
0000000
L 0000000000
oa00o a a0000 o
°n ° ° °0 ° °n °0 °00 °D0 °oo °00
5/18" S1EE1. PLATE
(GALVANIZED)
FINISHED GRADE
00 ° ° ° ° nan
000000000000000000000000
COVER
24" MINIMUM
000000000oo0ooa0000o00000
#5 REBAR
0000ao0000000000000000000
0000o00o0a0a0o00000000000
0ao00000a00000000000000
18"
0o0ooaooaoa00000a0o0a
000000000000o000oao
°OOOOOOO°0000°°° °O°
MINIMUM
#4 REBAR TIES AT
00000000
000000
SIDE LOCK
SEPARATION
36" O.C.
0 000000
000 00
0 00
STEEL. FRAME (GALVANIZED)
ANCHORED TO UNIT
'a O , O
O , O� �..
0000 00000
4" DUCTS
00000 D0o00
0D000 0000
0000 oa°o°
,�0 O
O O
000° °OOOOO
°
2 -1/2"
30o0
i0
0000
aa000
o °o
0000
O O °
MINIMU
° O
00000
....
5" DUCTS
7-1/2" MINIMUM
L
' ULLBOX -- 19 "L X 14 "L X 12 "H
E1 E8 NO SCALE
NOTES:
1. THE COVER SHALL HAVE 1/16" TO 1/8" CLEARENCE ON EACH EDGE WITHIN THE
FRAME AFTER GALVANIZING.
2. THE GROUND ROD SHALL EXTEND A MINIMUM OF 3" ABOVE THE BOTTOM OF THE
HANDHOLE A MAXIMUM OF 6 ".
3. HANDHOLE COVERS SHALL HAVE "LIGHTING" ON THEM.
4. CONCRETE 4000 PSI MINIMUM, 1 1/2" THICK MINIMUM.
5. PROVIDE GROUND ROD IN EACH HAND HOLE.
rR�- �i -lopl
CONNECT TO SIGN
CIRCUIT TRANSFORMER
LUGS
#8 0")
SPACES
_�. CIRCUIT 1 (NIGHT)
C
SPARE I CIRCUIT 2 (DAY)
(3) 20 AMP 2P
CIRCUIT BREAKERS
II NEUTRAL BUS
Y I ► GROUND CONDUCTOR
#8 TO EXISTING GROUND BUS
GROUND ROD — — — — — — -L — — — — — — — — — — --
PANELBOARD SECTION CONTROL SECTION
'LIGHTING CONTROL PANEL - 208Yf120 VOLT, 3 PHASE, 4 WIRE
E1 E6 NOT TO SCALE
COVER
NOMINAL CABLE ROUTE
(RACK CABLE ON WALL)
I
FUTURE H.V. SWITCHES
\--CABLE JUNCTION TERMINAL MOUNTS
L- 7 -1/2" MINIMUM
3 -1/2" COVER MINIMUM
2" COVER AT REBAR MANHOLE S6 & S3
COMMUNICATION PRIMARY NOT TO SCALE
DUCT BANK DUCT BANK
40916A
NOTES: RECOMMENDED
1. SEE DUCT BANK SCHEDULE ON SHEET E -1 FOR EXACT NUMBER OF DUCTS FOR APPF n \ /41
REQUIRED IN EACH RUN.
S PARLI N G jj jjDO( —jj� CONSULTING •p
ILJI I�t 1/I IFff) q R� Dli
ENGINEERS a�'' p`� e Was,,, N
NOMINAL DUCT BANK ° ° ENGINEERING COMPANY PLANNERS ' yPW�
i.ieemwmon"
NOT TO SCALE
SEATTLE WASHINGTON
m ,� S�DNAL EN NR REVLttm
DUCT BANK
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
SOUTH 43rd STREET
r VALLEY MEDICAL CENTER
ELECTRICAL DETAILS
Dmum DA ems DATE: 3/vm FU Na
mEOM AR. DURDAN WPM AS SM DRAWM M E
DATE RPWI c 9sEr NR 74 CF 81
SCANNED OCT - 3 1995
ER 011ow L. #160
��