HomeMy WebLinkAboutT-26908CJ_
W
N
a
SIGN
2 BRIDGE MOUNTED
SIGN BRACKET 1
SUPPORT I I f SUPPORT 2
TVP.
w
LINE
—i
-ALIGN BOTTOM OF
ADJACENT SIGN PANELS
• FIELD MEASURE VERTICAL CLEARANCE AT
THE LOCATION OF THE SIGN. ADJUST THE
LENGTH5 OF PIPES IF REQUIRED.
[�•
VIEW T VIEW X �/ •um�•,��R�—
LOOKING BACK
ON 5iAi10N T- 26908C
FLLE NPNE CR TJVOp021tlmRp2R9B1EBBTJVOYSBYB -0YgB.DGN I-AOS
Plo 1
TIME 3=n DINTS �m'PN '�' m "° FEDAIO PROJ.NO. �o . �M:•I',04 �idv= �a;I�.�gra BMS02
to As 4U5 Corridor Program 1 -S TO SR169 I.4os
DMGND BY mo STAGE 1 -WIDENING
DE910NED BY O. LOCH o ��
NNE p BY A. COCRICH A8 BULT TNXO ° Nee R4� IEfIxGm BER4ER gyp® BRIDGE MOUNTED SIGNS 3ie
pIEgEED BY A. DIEDRICX 3 g1RNDE0 NDC 2Y 611X0 OM �^K^ °1 � '°°"^" "a _ I I w.� "® v �M,^n'0e'+� c,
PROD. ENOR LRODGSON IFC 11N9RIT RB C_7296 ,sm-- 'KIY1921 L0` ' T-� ATECOnsinU.S. ESC BY 392
REOIOxRL AON. D. DYE nEVl6lax DnTE ,.m.�.� SIGN BRACKET 1 .@,
I
SEE STD. PLAN 0-9e FOR SIGN
PANEL MOUNTING DETAILS
S, -1• I
SION LGUMINAIRE MEAS. 5, ALONG SR,
SEE SIGHTING
PLAN 'INI
PLAN
SUIT. AV7 ORIOLE 40515
604055 LINE ETA. 1001.60
SIGN 119
w
LINE
—i
-ALIGN BOTTOM OF
ADJACENT SIGN PANELS
• FIELD MEASURE VERTICAL CLEARANCE AT
THE LOCATION OF THE SIGN. ADJUST THE
LENGTH5 OF PIPES IF REQUIRED.
[�•
VIEW T VIEW X �/ •um�•,��R�—
LOOKING BACK
ON 5iAi10N T- 26908C
FLLE NPNE CR TJVOp021tlmRp2R9B1EBBTJVOYSBYB -0YgB.DGN I-AOS
Plo 1
TIME 3=n DINTS �m'PN '�' m "° FEDAIO PROJ.NO. �o . �M:•I',04 �idv= �a;I�.�gra BMS02
to As 4U5 Corridor Program 1 -S TO SR169 I.4os
DMGND BY mo STAGE 1 -WIDENING
DE910NED BY O. LOCH o ��
NNE p BY A. COCRICH A8 BULT TNXO ° Nee R4� IEfIxGm BER4ER gyp® BRIDGE MOUNTED SIGNS 3ie
pIEgEED BY A. DIEDRICX 3 g1RNDE0 NDC 2Y 611X0 OM �^K^ °1 � '°°"^" "a _ I I w.� "® v �M,^n'0e'+� c,
PROD. ENOR LRODGSON IFC 11N9RIT RB C_7296 ,sm-- 'KIY1921 L0` ' T-� ATECOnsinU.S. ESC BY 392
REOIOxRL AON. D. DYE nEVl6lax DnTE ,.m.�.� SIGN BRACKET 1 .@,