Loading...
HomeMy WebLinkAboutT-26908CJ_ W N a SIGN 2 BRIDGE MOUNTED SIGN BRACKET 1 SUPPORT I I f SUPPORT 2 TVP. w LINE —i -ALIGN BOTTOM OF ADJACENT SIGN PANELS • FIELD MEASURE VERTICAL CLEARANCE AT THE LOCATION OF THE SIGN. ADJUST THE LENGTH5 OF PIPES IF REQUIRED. [�• VIEW T VIEW X �/ •um�•,��R�— LOOKING BACK ON 5iAi10N T- 26908C FLLE NPNE CR TJVOp021tlmRp2R9B1EBBTJVOYSBYB -0YgB.DGN I-AOS Plo 1 TIME 3=n DINTS �m'PN '�' m "° FEDAIO PROJ.NO. �o . �M:•I',04 �idv= �a;I�.�gra BMS02 to As 4U5 Corridor Program 1 -S TO SR169 I.4os DMGND BY mo STAGE 1 -WIDENING DE910NED BY O. LOCH o �� NNE p BY A. COCRICH A8 BULT TNXO ° Nee R4� IEfIxGm BER4ER gyp® BRIDGE MOUNTED SIGNS 3ie pIEgEED BY A. DIEDRICX 3 g1RNDE0 NDC 2Y 611X0 OM �^K^ °1 � '°°"^" "a _ I I w.� "® v �M,^n'0e'+� c, PROD. ENOR LRODGSON IFC 11N9RIT RB C_7296 ,sm-- 'KIY1921 L0` ' T-� ATECOnsinU.S. ESC BY 392 REOIOxRL AON. D. DYE nEVl6lax DnTE ,.m.�.� SIGN BRACKET 1 .@, I SEE STD. PLAN 0-9e FOR SIGN PANEL MOUNTING DETAILS S, -1• I SION LGUMINAIRE MEAS. 5, ALONG SR, SEE SIGHTING PLAN 'INI PLAN SUIT. AV7 ORIOLE 40515 604055 LINE ETA. 1001.60 SIGN 119 w LINE —i -ALIGN BOTTOM OF ADJACENT SIGN PANELS • FIELD MEASURE VERTICAL CLEARANCE AT THE LOCATION OF THE SIGN. ADJUST THE LENGTH5 OF PIPES IF REQUIRED. [�• VIEW T VIEW X �/ •um�•,��R�— LOOKING BACK ON 5iAi10N T- 26908C FLLE NPNE CR TJVOp021tlmRp2R9B1EBBTJVOYSBYB -0YgB.DGN I-AOS Plo 1 TIME 3=n DINTS �m'PN '�' m "° FEDAIO PROJ.NO. �o . �M:•I',04 �idv= �a;I�.�gra BMS02 to As 4U5 Corridor Program 1 -S TO SR169 I.4os DMGND BY mo STAGE 1 -WIDENING DE910NED BY O. LOCH o �� NNE p BY A. COCRICH A8 BULT TNXO ° Nee R4� IEfIxGm BER4ER gyp® BRIDGE MOUNTED SIGNS 3ie pIEgEED BY A. DIEDRICX 3 g1RNDE0 NDC 2Y 611X0 OM �^K^ °1 � '°°"^" "a _ I I w.� "® v �M,^n'0e'+� c, PROD. ENOR LRODGSON IFC 11N9RIT RB C_7296 ,sm-- 'KIY1921 L0` ' T-� ATECOnsinU.S. ESC BY 392 REOIOxRL AON. D. DYE nEVl6lax DnTE ,.m.�.� SIGN BRACKET 1 .@,