HomeMy WebLinkAboutT-269228.s
MY
Z
SOUTHBOUND 1-405
NORTHBOUND 1.405
TYPICAL PROPOSED LIGHT IN MEDIAN BARRIER DETAIL
- *aQrJ' i.�4Pi15itX.D &it�}2- BUI #d°.Yffi
RELEASED FOR DONSTRRUCTIOA�
REMOVE EXISTING PULLBOX AND REPLACE
WITH NEW CONDUIT TO MATCH EXISTING
CONDUIT WHERE EXISTING PULL BOX IS
NOT RATED FOR TRAFFIC OR IS IN THE
TRAVELED WAY.
0 10 2m
SCALE IN FEET
A
As
PER LOMINAIRE SCHEDULE
LUMEC LUNINAIRE
0 HPS -SG3
MD,U)e
:ao-aam
i
wLUMEC i
BRACKET]
y UNAA J
TIR POLE
rc ATR SSV- G &BKT%
Z
8 —CURB
r8. ROADWAY --- SIDEWALK
i
w
STREET LIGHT
CONDUIT TRENCH
SEE LUMINAIRE
SCHEDULE
1 -4S YLD -0.7A
1-5 TO 5R 169
State STAGE 2 -WIDENING
lsportation AND SR 515 INTERCHANGE 4jp
ILLUMINATION DETAILS &
MANAGER:
RD'
o
_
v. azuunx
DESIGN
TASK LEAD:
D.MORFORD
0;w
1
0111 Y90
REYISWX9 PER RFI361
RM4 ET
0.GEORGE
D. MORFORD
PACKAGE:
0
11HN00
RELEASED FOR CMISTK=M -30 -IL
R. MUDGETT
KGARCIA
D.MORFDRD
RFC 2B IL
7624
A
9NZBM0
FINAL DESIGN -W
R. MUDGETT
KGARCIA
D. MORFORD
_ -
- *aQrJ' i.�4Pi15itX.D &it�}2- BUI #d°.Yffi
RELEASED FOR DONSTRRUCTIOA�
REMOVE EXISTING PULLBOX AND REPLACE
WITH NEW CONDUIT TO MATCH EXISTING
CONDUIT WHERE EXISTING PULL BOX IS
NOT RATED FOR TRAFFIC OR IS IN THE
TRAVELED WAY.
0 10 2m
SCALE IN FEET
A
As
PER LOMINAIRE SCHEDULE
LUMEC LUNINAIRE
0 HPS -SG3
MD,U)e
:ao-aam
i
wLUMEC i
BRACKET]
y UNAA J
TIR POLE
rc ATR SSV- G &BKT%
Z
8 —CURB
r8. ROADWAY --- SIDEWALK
i
w
STREET LIGHT
CONDUIT TRENCH
SEE LUMINAIRE
SCHEDULE
1 -4S YLD -0.7A
1-5 TO 5R 169
State STAGE 2 -WIDENING
lsportation AND SR 515 INTERCHANGE 4jp
ILLUMINATION DETAILS &