Loading...
HomeMy WebLinkAboutT-26929Bxi i i i CURVE VArA P.I. STATIONS DELTA RADIUS TANGENT LENfiYH B.C. TAN. BEARING BRS STA. !!8+61.40 32 °03144.5" 111. 410.00 117,01 22943 N 3 °06'29.9" E F "445 SYh. 1219rv14 B% 66 °38'59.0' tY. iH09B6 !253J4 22;6.93 N ]6 °19'2].0" E TBS N@ 405 54 +2k.fE B °46:iK]" RT, 500.00 6t40 122.56 N 3] °4!'1K.2' F EXISTING NB 1405 ELEYATION5 E405 5r& OFFSEY R, FY. LEFT EOP ELEV. LEFT EDP GffvFT R, FT. RIGHT EDP ELEV. RIGHT FOP Y2Hw ^0 1.13 7537 52.51 97,66 1214+20 1.76 76.10 52.22 76.41 12141.40 2.75 76.67 5414 79.15 1214.60 3.84 77.65 51.90 76.61 ;214+60 437 76..79 51.08 50.49 !215+00 5.36 79.01 51.67 51.19 1215.20 LAX 79.64 51.77 BLIND 1215 +40 1.19 81 ELMO 62.59 1215.00 ITS 60.99 57.69 55.24 195,80 090 61.51 5191 83190 1216.00 CAR 62.19 SL74 M4.52 7216,20 0.96 111 51.79 ASR) 1216+40 1,04 8339 51.99 6568 1216+60 7.22 84.01 BLED 6524 1216.80 1.16 84.60 52.00 B6.60 1217,00 t17 BPI 51,92 87.55 121720 1.29 OHIO FLOW 67.91 1217.40 1.23 B6.18 TOM BB.45 T85 N5405 SUPERELEVATION EXISTING 513 1405 ELEVATIONS E405 5TA, OFFSET L, FY. LEFT POP ELEV. LEFT FOP OFFSET L, FL NIGH( For ELEV. SIfi HY FOP 1214+00 S57 731E 106 75.39 1214+20 STEP 73.95 1.74 7613 1214 +40 STIR 74.75 2.64 76.93 1214.60 5139 75.57 3.41 77.59 1214,60 50.60 76.32 3.67 78.20 1215 +00 50.07 77.01 3.71 ]3,B! 1215+20 4923 77.74 2155 79.62 1215 +40 48.60 76AT 1.41 80.46 12151SO 51.61 7,1 1.30 ELIO M?R.aC 53.28 79.30 1.27 61.61 1216,00 5496 60.09 1.37 62.27 2216 +20 OEM 60.7B 1.24 52.94 1218+40 5656 51.14 120 8327 1276.60 568! 81.73 1.27 53.84 1276+60 55.97 62.24 1.36 6439 1217.00 SLIM 02.64 1.29 M.76 1217.20 54,72 63..75 (1 65.35 12We40 54.32 03,90 0.92 05.99 O m "< �� 30 NQ :m LL+'I.00 %6 'w T65 N8405 PROFILE aY CHECKEa BY DE81oN..... J. "U"A: J. eAUNAx wn °° MAX 105 3B PIER 2 120 109 PIER 3 120 120 DESIGN TACK MEN P.9uEmm MM .I .ON P.OUENTHER PACKAGE: 7624 iml P.GUENTHER GENERAL NOTE5 i. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE WASHINOrON STATE DEPARTMENT OF TRANSPORATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION "01-511 VERSION DATED 2006 AND AMENDMENTS. 2, EXCEPT FOR SEISMIC DESIGN. THIS STRUCTURE HAS BEEN OE5iGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE AA5H70 LRFD BRIDGE SEATON SPECIFIGATIONS FOURTH F9,TION DATED 2007 AND INTERIMS THROUGH 2000, SEISMIC 01 HAS BEEN COMPLETED IN A6'CORDA.NCE WITH THE REQUIREMENTS OF THE Ai5HrC GUIDE SPECIFICATIONS FOR LRFO SEISMIC BRIDGE DESIGN GATED MAY 2007 WITH W600T DESIGN MEMORANDUM AMENDMENTS 152006 US!NC OEISMIC DESIGN CATEGORY C. SITE CLASS B AND A PEAK GROVNC ACCELERATION COEFFICIENT (PGA,, OF 0.44. 3. THE CONCRETE IN THE SRIPfiF" DECK, PIER WAPHRAGMS, AND END DIAPHRAGMS SHALL BE CL A55 40000. THE CONCRETE IN THE LOWER PART OF PIER 2 AND PIER 3 CROPS BEAM6 AS SHOWN FOR STAGE 2 ON 9HEEY 00 003 SHALL BE EITHER CLA55 4000 OR CLARE 40009. CONCRETE IN THE DRILLED SHAFTS BI BE CLASS 40006 CONCRETE IN THE PINCER CLOSURE POUR5 SHALL BE CLASS 6000. CONCRETE IN THE PIER COLUMNS SHALL BE CLASS 5000, ALL OTHER CAST -IN -PULE CONCRETE SHALL BE CLASS 4000, 4. THE NOMINAL BEARING CAPACITY OF SPREAD FOOTINGS FOR SERVICE STRENGTH AND EXTREME EVENT -! LIMIT STP.TES, SHALL BE TAKEN A5 (IN KSF): 5. THE NOMINAL SHAFT CAPACITY AT PIER 4 SHALL BE TAKEN A5 (IA' KIP5j: 0£5I6N LIMIT STATE LOLAP,ON STRENGTH 8 EXTREME -1 (q ^) SERVICE - I" SETTLEMENT (q srrrj K5F PiFR 1 105 3B PIER 2 120 109 PIER 3 120 120 5. THE NOMINAL SHAFT CAPACITY AT PIER 4 SHALL BE TAKEN A5 (IA' KIP5j: 6. UNLESS OTHERWISE SHOWN ON THE PI AN`i, CONCRETE COVER MEA5URED FROM THE FACE OF THE CONCRETE TO THE FACE OF ANY REINFORCEMENT 57EEL SHALL BE 2h INCHES AT THE TOP OF THE BR!O66 OECK. 1 INCH AT THE BOTTOM OF THE BRIDGE PECK, 2 INCHES AT THE TOP OF FOGYiV9W. 3 INCHr5 AT THE BOTTOM OF '. HE FOC INGSv AND IS INCHES AT ALL OTHER LGCAT!ON5, 7, TIE COMPOTE, JUNCTION BOXES. AND !IYIL!YIES ARE SHOWN FOR REFERENCE ONLY. ,THE CONTRACTOR SHALL COORDINATE THESE PLANS WITH THE ELECTRICAL, l.T.A AND OTHER CIVIL PLANS. B. FA15EWOKK SHALL NOT BE RELEASED UNTIL SUPERSTRUCTURE PO5T- TEN5IONIA'G HAS BEEN COMPLETED. FALSEWORK SHALL Be CAREFULLY RELEASED TO PREVENT IMPACT OR UNDUE 5TRE55 IN THE STRUCTURE, THE CONCRETE FOR TRAFFIC BARRIER AND SIDEWALK SHALL NOT BE PLACED UNTIL THE FAL5EWORK HAS BEEN RELEASED, 9, THE LOCATIONS OF ALL EXI5TiNC+ UTILITIES WITHIN THE VICINITY OF THE STRUCTURES SHALL BE VERITIES BY THE CONTRACTOR PRIOR TO EXCAVAT!NC. 10. SPLICES IN COLV.MA' HOOP RELNFGRCEMEN'. SHALL BE WELDED LAP SPOOF TYPE ONLY, LEGEND IDENTIFIES SECTION, VIEW BR DETAIL EL15 TAKEN 01 SHOWN ON BRIDGE SHEET ELI5 - TAKEN OR SHOWN ON THE SAME SHEET Waehinpton State Department of Tmnaportatlon DESIGN LIMIT ST dY£ SERVILE - I SIRE..1 T EXTREME I F.ND BEARING 372 706 %OB SKIN FRICTION 1615 1615 1615 6. UNLESS OTHERWISE SHOWN ON THE PI AN`i, CONCRETE COVER MEA5URED FROM THE FACE OF THE CONCRETE TO THE FACE OF ANY REINFORCEMENT 57EEL SHALL BE 2h INCHES AT THE TOP OF THE BR!O66 OECK. 1 INCH AT THE BOTTOM OF THE BRIDGE PECK, 2 INCHES AT THE TOP OF FOGYiV9W. 3 INCHr5 AT THE BOTTOM OF '. HE FOC INGSv AND IS INCHES AT ALL OTHER LGCAT!ON5, 7, TIE COMPOTE, JUNCTION BOXES. AND !IYIL!YIES ARE SHOWN FOR REFERENCE ONLY. ,THE CONTRACTOR SHALL COORDINATE THESE PLANS WITH THE ELECTRICAL, l.T.A AND OTHER CIVIL PLANS. B. FA15EWOKK SHALL NOT BE RELEASED UNTIL SUPERSTRUCTURE PO5T- TEN5IONIA'G HAS BEEN COMPLETED. FALSEWORK SHALL Be CAREFULLY RELEASED TO PREVENT IMPACT OR UNDUE 5TRE55 IN THE STRUCTURE, THE CONCRETE FOR TRAFFIC BARRIER AND SIDEWALK SHALL NOT BE PLACED UNTIL THE FAL5EWORK HAS BEEN RELEASED, 9, THE LOCATIONS OF ALL EXI5TiNC+ UTILITIES WITHIN THE VICINITY OF THE STRUCTURES SHALL BE VERITIES BY THE CONTRACTOR PRIOR TO EXCAVAT!NC. 10. SPLICES IN COLV.MA' HOOP RELNFGRCEMEN'. SHALL BE WELDED LAP SPOOF TYPE ONLY, LEGEND IDENTIFIES SECTION, VIEW BR DETAIL EL15 TAKEN 01 SHOWN ON BRIDGE SHEET ELI5 - TAKEN OR SHOWN ON THE SAME SHEET Waehinpton State Department of Tmnaportatlon ., 1-6 TII I�SR STAGE 2 -WIDENING AND SR 515 INTERCHANGE