HomeMy WebLinkAboutT-2692E6#
TOP OF
¢ GIRDER
O O
00
00
08
- I �-OEU STRAND (MAY
BE ADJUSTED M TO
EITHER SIDE OF 'WED)
STRAND PATTERN AT GIRDER END
HARPED STRAND LOCATION SEQUENCE
SHALL BE AS SHOWN (1), (2) ETC.
¢ BEAKINS
RECESS
I
6 -
STRAND PATTERN AT q STRAND
STRAICsHT STRAND LOCATION SEQUENCE
SHALL BE AS SHOWN (1), (2) ETC.
L. CHAMFER ON BEARIN G NiOYH 2" - vEE�
FLANGE FOR SKEWS ( TIERS ] d S SEARING
GREATER THAN ]5° '� --LrI OEYNLS" 51,EET I
II II II II
II
II II ' II
/ II I II II I II
FAKN W "EXPANDED POLYSTYRENE
RECESS FOR SKEWS GREATER THAN I5 °- 1 1 It _-_.IL.
II _ll_
?4" CHAMFER ON , II II II
WEB FOR SKEWS , 11 II II
GREATER THAN 15 °J It II II
W EKPANPEO POLYSTYRENE 1 1 f
FOR SKEWS GREATER THAN 15'- /fl 'P {EYEL (AFTER
LEVEL (AFTER / LASTfNO 5LA5)
6H51ME 31A2)- GIRDER SLOPE
END OF PRE5TRF55E
CONCRETE GIRDE
a
SAWTOOTH DETAILS
SAV/YEETH ARE FULL WIDTH - USE SAWTOOTH KEYS
FROM BOTTOM OF OOTTOM FLANGE TO OOTTOM OF
LOWEST HARPED STRAND AS WELL A5 TOP FLANGE
AOJAOENT TO HARPEP STRANDS AD SHOWN IN
VIEW B - WF 586 Gi NlER DETAILS (1 OF 3)
II II II
I
E tlE ¢ DE
RECESS ESS RECCESS ESS
PLAN - GEARING RECESS AND BOTTOM
FLANGE SPALL PROTECTION DETAIL
GIRDER SCHEDULE
AHEAD
0.4 3TATiONING
¢ DEAKINS ¢ BEARING
GIRDER PLAN
NOTED
U AND LT ARE SHIPPING SUPPORT
LOCATIONS AT LEAVING AND TRAILING
ENDS, RFSPFCTWELY.
TRANSVERSE REINFORCING SKEWED ENDS
ONLY TRANSVERSE RFINE SHOWN
DIMENSION "A" AT OEARIN65 = 12 1/Y SASSO ON GIROER DEFLECTION - 0' AT TIME L'F CLAD PLACEMENT (120 DAYS)
MIN CONC.
COMPRESSIVE
5TKENGTH
HARPED
5TRAirMT
TEMPORARY
LOCATION OF CG. STRAN95
N
N
t
t
C
__L
iT
91
Bp
PI
Pp
NGTH
og
z
(DEG)
(DPA.)
IRDER
NO OF
JACKING
N0. OF
JACKING
NO. OF
JACKING
E)
J71
�y
STRANDS
FORCE
STRANDS
'ORCF
STRANDS
FORCE
£
Fd
Fb
Fa
`A
t-
K6
(KIPS
(KIPS)
(KIPS)
C
u
A.
1
A
A
0
4' -d'
12' -1'
12' -tl'
&3.5
65.5
I' -10
"
6.0
7.0
15
559
30
1315
2
8D
2 ]1B"
3 3/r
3"
tO 1/2°
1 v(5"
3 IJ2"
3 T;B"
I
B
A
p
F -0"
12' -p•
12, -0'•
93.5
6v.6
1' -Id'-
/8"
6.0
ZO
15
659
3G
i$18
2
BD
2 ] / &'
S 5/0"
B"
ifi i/2'
f 9/9"
3 1/2"
4'"
-
1
L
A
P
4'-d'
12'-G"
12' -6'
9.9.5
85.6
1' -IJ`
--
14"
D.O
T.O
18
853
SC
1319
2
BB
2 ]lff'
S S(D"
3"
10 1/2'
Y'
3110
4"
]
0
A
p
4' -G"
12' -0"
12` -a
93.5
E5.6
P -1d
-
10"
6.5
6.0
17
]4]
36
ISB2
P.
00
3 310"
3 7QH
9
if 112"
2 OZ.
4 V2"
5"
-
2
A.
D
A
4' -0"
!2' -0"
12'-OF
T3.2
DS 4
V -10P
1
B.8
08
]D
T9]
30
15]P
2
BD
9 ill'
4"
5'
P -ti'
2 WE'
4 51AP
5 1f4"
2
0
p
A
4' -G"
IT' -G"
i ?' -d'
45.2
D64
-
p.iG"
123' - 1! fJF"
B.4
%.0
10
'IO3
3E
1502
2
D6
3 3HO
3 314'
3"
1°
2 31B'
4 Il4"
4 .914"
2
L
U
A
9' -0"
12' -0"
12' -0`
4A2
86.4
I' -tO°
122' 2 5/B'
D/r
3.8
16
]03
ifi
15BY
2
BD
3 3 /D"
3 314"
5'
11"
2 I(i'
4 1/4 "'
4 Sfk"
2
9
D
A
9' -G'
12' -0'
12' -G"
T3.2
BU.9
-
I' -10"
120' - F"
B.4
]B
18
TOb
56
15D2
2
AB
3 31&'
3 3/4"
3"
iP
2114,
4 1 /4""
4 314"
MO.
wi
1-5 TO SIR 169
STAGE 2 -WIDENING
AND SR 515 INTERCHAN13E
I