Loading...
HomeMy WebLinkAboutT-2692F2# INCREASE LE.4GT.Y 5" I t/2" BR P: UST BAR LOCATION TO EKYENV INTO NEW HANG DOWN SECTION. 5ENPING DIAGRAM o VA T_ FA-F2 8 C AP6I n M6 Orr m >1 I � LAPII] AL.y, NOT AU U MFN5 ONS ARE 001 TO OILY T = EPDXI COATED REINFORCING STEEL 9 cj FI t�=] ®X6 A5q V,6-\ A51 V LON'STR1TtON JOINT CONSTRUCTION WITH ROUGHENEU SURFACE AS YB JOINT WITH ROUGHENED SURFACE - FRAMED r� BrB V.. ILE tRRIBGE u'®Y6- ______jj____ AP4 ® #5 AP4 $r' APPROACH A W8Y —1C�\ '� I SLAB EDGE �} } ! I-� -PEX. \ �—. AF -- #5 1 �B3 Y5J' •• -T � p P -r '-( #b FUR TRAFFIC SARRIER VETAILS. 9016H ENEU SURFACE I.ry -. - -._ ROTATE H SEE "YRAFFW BARRIER' 5HF"EY.S tRFP.CE BTWN. [AffS'$t5 A51 ®XS 5ECTION C SECTION JOIN O TRULYION CO'ER e -o -56 I�r EiNE V a -o -sb SURFACE ®r5 t -® ®YS FORMED �$�YS� FAF41 gY BRIDGE F APPRDAC4 I ��[VYS PLACE V ALAS E06E ' j r� B.:TWEENAP4Vf5 t Ff FORMES SRIOGE ORAVE G.CAOE _ ! 5LAe APPROACH �yy■ - _ FOCE BAKER AKER RUN - - -_ L FIN SHEU RAD! 14 �� Y5 I I J I_aI 1, f„ MASK WALL- APi' #8 . SECTION g e -D -56 # INCREASE LE.4GT.Y 5" I t/2" BR P: UST BAR LOCATION TO EKYENV INTO NEW HANG DOWN SECTION. 5ENPING DIAGRAM o VA T_ FA-F2 8 C AP6I n M6 Orr m >1 I � LAPII] AL.y, NOT AU U MFN5 ONS ARE 001 TO OILY T = EPDXI COATED REINFORCING STEEL 9 cj FI t�=] ®X6 A5q V,6-\ A51 V LON'STR1TtON JOINT CONSTRUCTION WITH ROUGHENEU SURFACE AS YB JOINT WITH ROUGHENED SURFACE - FRAMED r� BrB V.. ILE tRRIBGE u'®Y6- ______jj____ AP4 ® #5 AP4 $r' APPROACH A W8Y —1C�\ '� I SLAB EDGE �} } ! I-� -PEX. \ �—. AF -- #5 1 �B3 Y5J' •• -T � p P -r '-( #b All 1 #8, PAV °U 9016H ENEU SURFACE I.ry -. - -._ ROTATE H PP9`Vle PlALE tRFP.CE BTWN. [AffS'$t5 5ECTION C SECTION p CO'ER e -o -56 0RMEN fiRID3F a -o -sb ',A51. PYE� CON.SYRUMON JoINr WITH ROUGHENED SURFACE .. -1.. ® Vr6-I AP4 ®15-1 \V A52 15 II APB ©ss FLACE 1 bEgw BErWF6N �S IF #5_ I' ` F0AMED APACH 3LAB EVGF 15 f 1-6' MAX, —A IN 15--I Ei'Id5 u ®® YB LAM 15 1• E•' 6" tl' 1' -6" MAX. PP1J'� R5 RW9A VARIES SECTION G 8 -0 -96 _ ..........e'F$iE ENTERED GY CHECKED BY OEIDGN OER: J, MU J. B0.NhN Y> wnm TMK YAGK LEAD: D.HENOFA80N P.OUENTHM P'WENYHER wlrtwnc4 w. R4 K L0WN1841N N.GUAN PACKAGE: D. KENDERBDN P. GUENTH€% 7624 FORY.EU 5RIUGE APPROACH 5LA8 E06E CONTINUOUS BACKER RED I- CURTAIN WML Fff Y5-^I t I AP5 %=P Y5 -f 0. ENZ un t 1 JY WLHG SECTION 5-0 AIR SECTION y 0 -0 -56 FAgr `iVY6 CONSTRUCTION JMNY WITH ROUCHENEO SURFACE - MT" FLAG iBYWN.IAP�a ®YE I T 716 -1 ® Vr5-t 1 ASI ®ffi %ACKER ROI SECTION p JOINT NO H B 0 -36 ASI ®ffi CON5rRUCr10.4 ] p5 JOINT NO H 9016H ENEU SURFACE I.ry -. - -._ ROTATE H PP9`Vle PlALE ENOS'01 BTWN. [AffS'$t5 CONCRETE ®p6 —I CO'ER A `4 GJY5 -11i 0RMEN fiRID3F rBJ CURTAIN AS SECTION e-0 56 1-405 RB.0-37 I.5 TO SR 759 STAGE 2 -WIDENING AND SR 575 INTERCHANGE SB400 Ramp BRIO E DYER BENSON ROAD C,23