Loading...
HomeMy WebLinkAboutT-270317CON D U I T INSTALLATION FIGURE 4 FIGURE 7 FIGURE 11 J -BOX J02 TRANSFORMER T01 HANDHOLE H05 & H06 DE I AILS (1), - 211 FIGURE 1 LATCH �� ,Q (1) _ 311 PULLING VAULT V01 AL'-E-SS-1 EXISTING ° J -BOX MH MH (2) - 411 (2) - 411 rr (4) - 6" (4) _ 611 (2) - 3'x3' DOORS °0 0 1 .SCALE: N.T.S. FIGURE 5 FIGURE 8 J J -BOX J02 TRANSFORMER T02 I 0- FIGURE 2 CUSTOMERUPPLIED PULLING VAULT V02 3 ' CABLE /CONDUIT i Q j I i EXISTING AccESS 2 MH MH i I T02 T -U -T W/ J -BOXES (1) (4) - 6" EXISTING 6" FROM P34 (1) - 4" i - 4" PSE INSTALL i I I FIGURE 12 i i- - - - - -r TRANSFORMER T08 ! G and line I PSE FIGURE 9 r,J L i i - -I - -- FINISH RUN -` - - -- o i'o TRANSFORMER T06 & T07 I,. ••\Schedule EO bend J -BOX J03 i LATCH ambing 4Spac Climbing Space 0 i X' _ _ - ACCESS LJ IF-) I FIGURE 3 i i (1) 1 4 "� — —� FIGURE 10 JUNCTION BOX J06 v Flald Face BrackettI N Ouadmnt Blanket PULLING VAULT V03 - - - - - - - - - - - I (2) - 31I Canaan Po(1) - 3 " (1) - 3 (2) Conduit isecplacert errt - 4" AccESS � � EXISTING POWER CABLE access y' �11 lot y O O LATCH CITY'S CONTRACTOR RESPONSIB LITYI 1I m Cn w All rigid PVC conduit and 1" streetlight polyconduit, will be in by th City s contractor according to rn the Conduit Installation Details. dry changes from these instructions niust be approved by Puget Sound Energy Inspector, O ^1 u CO o FIGURE 10 ti Conduit Installation 1 "d I 0 i L1 2. Allinspection the Conduit OcZdiinq t mthea Generale Project Notes. - C 21I HANDHOLE H07 4. Details forttrla sforders101 and T06 show the rloutng 01 conduitI Inthosec transformersaults on this projet. X JUNCTION BOX J05 i ' The only bends it the transfohmer handhole willbe the bends direct) in the handhole and are 24" radius. O of (1) - 411 _ I (1) - 3 5. can onot'be performed without approval of PugetbSoundeEnergyylrepe toyer than 22.5 degree bends when sweeping conduits. N w CUSTOMER SUPPLIED 6. 90 degree bends are allowed only for the following) I < j Service Stubs Main tren h to private property, 2" & 3" at 46'I Radius. i TRANSFORMERS CABLE /CONDUIT Main Tr Trench - les - Main'Itrench to handholes, 2" & 3" at 46 "'R6dia LATCH I ri w T05 i Main rrenan s" & 4" of 60" Rad1ia. 3" & 2" tat 48 at 24" I rii I PoolesRisersr Hanfihol4', 321st 36' Radius. Radius I `�1 ' y < , - 2„ at 30.' Radius. I 7. Install conduit spacers every 5 feet according to Figure 7. O i B. PVC Conduits shall be joined wrath PVC cement to the inside coupling rid outside of exterior of the conduit. Apply using 1 -inch -01 ' I natural bristle brushes. All loint9 undisturbed and it least cl minutes. 9. Contractor to install pulling fish�ine in each conduit run including the p lyconduit with 3' extra at each and. X i 0 TRANSFORMER i �'p a 10. All conduit ends are to be seo ed with the provided conduit plugs to IIII ae clean from dirt and water. T04 11. Conduit riser to be Installed CA poles P07,P14,P32,P33,P39. Figure A Ishows installation details for conduit risers. Riser bends are ' I SWITCH Lam,' 0 2' PVC 30" Radius. � I VAULT SWITGH 3 ",4 ",6" PVC 36" Radius. S01 VAULT N LATCH 12. Allrisers to be installed on field side according to Figure 10. 1 I CALL 1 -600- 424 -5555 Sot ACCESS Access 2 BUSINESS DAYS BEFORE YOU DIG co ❑ ` & 9aTAT MT 10 E T VOI PE CIT teCAlgN > IAOLR° 5 REIL ESTATE /EASEMENT PERMIT tl X 3 FUNCTION CONTACT PHONE NO DATE 2 I c• to I i 30X03' 30X03' t COUNTY GATE MER SEC aA5 AREAS�IRA ON aC N KING TT SEC OP NIP PLAT MM EDGE OF R/W (1) - 3" (2) - 611 L_— _— _ —_ —_ —_ _— _ . —_ —_ _— — - -_— _ 11 U- MM•IPaw -, CIR MAP• CIRCUT• J - B 0 X (1> - 311 z3os -E -o9T j 23s•ea caw -Ian LATCH EXISTING 4 PVC J04 (2) - 4 JOINT FACILITIES MRMOEMETS ESE (2) 41 I (2) - 4'' CO TACT 1 FRMK FOREST STAN FINLEY ANDY LOWREY. (2)_ C-11 PHONE• li 1 345.2989 433 -3134 1 395-6962 L SIDEWALK MAINZ AVE 'I S CITY OF RENTON p ROAD MPROVEMENTS 0, ELECTRICAL CONVERSION FIGURE 6 INCIDENT• WO• (POWER) ORAWW Y. FU 99 -33449 PUGET ENCNEERED: A. LOWREY <9e -53451) SOUND CKE0: M. COPPS SCAN Co FEB 15 2002 ENERGY g1E II RovI:D: J. GOODFELL;OW 9CILE: N.T.S. 7 / 9 F R, I S