Loading...
HomeMy WebLinkAboutT-289402N I ac �o I_ z d' z }z L o' a T = N � _iZ OF n - I III _o a I � a c JiN �' a �l of sj �c ICI z o Z - 17 Q3 Imo- pi YIp alp PORTION OF SEC. 5 TWP. 23 N. RGE. 5 E. W.M. v 652 o \ \ \ 4 EXTENDED CO O _ _ UL N ESTATES %� . � - -� FOUNDATION _ BLDG. G' \ � -' WALL (TYP.) ,^ , 575 ^O V , N 4' N 4 �' EXISTING 250 WATT HPS M -S -II LUMINAIRE ON ALUMINUM 4 /� DAVIT STYLE POLE AT 35' MOUNTING HEIGHT 0- 4 y , y m 3 / 2 / / ELEVATION OF NEUTRAL WIRE AT EXISTING - / UTILITY POLE IS APPROX_ 32' ABOVE GRADE i � N M ELEVATION OF NEUTRAL WIRE AT EXISTING UTILITY POLE IS APPROX. 46' ABOVE GRADE, vy 4V+�CD 0 SCALE: 1 " = 20' 0 10 20 40 POLE SCHEDULE JLE I I POLE POLE POLE LAMP REMARKS MOUNTING MAST CIRCUIT NO. C °. LOCATION OFFSET WATTAGE DISTRIBUTION HEIGHT ARM NO. 2965C j 29 +00 30 -2,8� RT. 150 M -C -III 1 w !w 1 2967C j 27 +50 22j' i3 RT. 50 M -C -III 25' 9'P9 o �w IZ Q 0 Z Z 0 N I ac �o I_ z d' z }z L o' a T = N � _iZ OF n - I III _o a I � a c JiN �' a �l of sj �c ICI z o Z - 17 Q3 Imo- pi YIp alp PORTION OF SEC. 5 TWP. 23 N. RGE. 5 E. W.M. v 652 o \ \ \ 4 EXTENDED CO O _ _ UL N ESTATES %� . � - -� FOUNDATION _ BLDG. G' \ � -' WALL (TYP.) ,^ , 575 ^O V , N 4' N 4 �' EXISTING 250 WATT HPS M -S -II LUMINAIRE ON ALUMINUM 4 /� DAVIT STYLE POLE AT 35' MOUNTING HEIGHT 0- 4 y , y m 3 / 2 / / ELEVATION OF NEUTRAL WIRE AT EXISTING - / UTILITY POLE IS APPROX_ 32' ABOVE GRADE i � N M ELEVATION OF NEUTRAL WIRE AT EXISTING UTILITY POLE IS APPROX. 46' ABOVE GRADE, vy 4V+�CD 0 SCALE: 1 " = 20' 0 10 20 40 POLE SCHEDULE JLE I I POLE POLE POLE LAMP REMARKS MOUNTING MAST CIRCUIT NO. C °. LOCATION OFFSET WATTAGE DISTRIBUTION HEIGHT ARM NO. 2965C j 29 +00 30 -2,8� RT. 150 M -C -III 25' 1 2967C j 27 +50 22j' i3 RT. 50 M -C -III 25' 9'P9 \_Nl %viRiivG SCHEDULE 2 Z RUN N0. CONDUIT CONDUCTORS REMARKS 1.5" PVC (SCHEDULE 40; 2 - #8, 1 - #10 fsRLEN BARE 2 1.5" PVC (SCHEDULE 40) PULLCORD FOR FUTURE 3 '.5" PVC (SCHEDULE 80) 2 - #8, 1 - #10r4 RARE 4 1 EX, 1.5" EX. 2 - #8, 1 - #10 PREEN BARE, GENERAL NOTES 1. LIGHT STANDARD FOUNDATIONS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS SHOWN ON SHEET I13, EXCEPT WHERE UTILITY CONFLICTS ARE ENCOUNTERED. IF UTILITY CONFLICTS ARE ENCOUNTERED, THE FOUNDATION SHALL BE A SPREAD FOOTING FOUNDATION CONSTRUCTED IN ACCORDANCE WITH THE DETAILS ATTACHED TO THE SPECIFICATIONS. 2. THE CONTRACTOR IS CAUTIONED THAT BURIED FIBER OPTIC COMMUNICATIONS LINES, HIGH PRESSURE GAS LINES AND /OR STORM DRAIN PIPE ARE LIKELY TO BE ENCOUNTERED AT OR NEAR THE LIGHT STANDARD LOCATIONS CONSTRUCTION NOTES O1 ROUTE CONDUIT TO EXISTING JUNCTION BOX. INSTALL CONDUCTORS PER WIRING SCHEDULE. SPLICE NEW CONDUCTORS TO EXISTING CONDUCTORS IN EXISTING JUNCTION BOX. OCOORDINATE WITH PUGET SOUND ENERGY FOR REMOVAL OF EXISTING LUMINAIRE AND MAST ARM ON EXISTING UTILITY POLE. RECOR, T-28P402 LEGEND TYPE`W --_C -III H.P.S. LUMINAIRE, ARM AND ALUMINUM DAVIT STYLE POLE LIGHT BASE AND JUNCTION BOX wil WITH CONCRETE PAD PVC CONDUIT (SEE WIRING SCHE7ULE) TYPE 1 JUNCTION BOX WITH CONCRETF PAD AWIRE NOTE 0 CONSTRUCTION NOTE DRAWING ''Z ZZ Mal TRANSPORTATION PLANNING pncEaE °��` �grREO ��� I & ENGINEERING, INC. e PoryqLE -2Y -q' FSSipyp�EN 2223 -112TH AVENUE NORTHEAST. SU. --- '01 - -� -� BELLEVUE, WASHINGTON 98004 TEL. (425) 455 -5320 FAX (425) 453 -5759 n SCANNED 8 0