HomeMy WebLinkAboutT-296103A fw) �
Q
ri
W
I
0
n
PORTIONS SEC 16, TWP 23N, RGE 5E, W. M.
POLE SCHEDULE
0
LLJ
STATION
z
MOUNTING
HEIGHT
ARM
LENGTH
ry
WATTAGE
PHOTOMETRICS
COMMENT
CITY OF RENTON
LUMINAIRE 10if
15
30
240V
W
15
30
W
._
Q
I—
�=
INDEX AVENUE SE
O
22.5' RT'
25'
8'
m
100W
\
45358
ri
W
I
0
n
PORTIONS SEC 16, TWP 23N, RGE 5E, W. M.
EXISTING BRAMER SCHEDULE
POLE SCHEDULE
LUM.
LE NO.
ROAD
STATION
POLE
r OFFSET
MOUNTING
HEIGHT
ARM
LENGTH
CIRCUIT
WATTAGE
PHOTOMETRICS
COMMENT
CITY OF RENTON
LUMINAIRE 10if
15
30
240V
CIRCUIT 2
15
30
240V
CIRCUIT 3
15
1
INDEX AVENUE SE
20 +75.0
22.5' RT'
25'
8'
2
100W
FLA T LENS
45358
M -C -III
2
INDEX AVENUE SE
22 +30.5
22.5' RT
25'
8'
2
10oW
FLAT LENS
45378
M -C -Ill
3
INDEX AVENUE SE
23 +85.5
p 22.5' RT
25'
8'
2
1,00W
FLAT LENS
4557E
M -C -111
4
INDEX AVENUE SE
25 +48.5
22.5' RT 25
8'
2
l ooW
FLAT LENS
45658
M -C -1N
5
SE 4TH STREET
19 +12.5
' 22.5' LT
25'
8'
2
f00W
FLAT LENS
45678
M -C -111
6
SE 4TH STREET
20 +72.5
22.5' LT
25'
8'
2
100W
FLAT LENS
45698
Ad-C-111
EXISTING BRAMER SCHEDULE
SERVICE &I
CIRCUITS
MAIN
BREAKER
AMPS
BRANCH'
BREAKER
AMPS
CONTACTOR
AMPS
COMMENT
SERVICE
100
1201240V
CIRCUIT 1
15
30
240V
CIRCUIT 2
15
30
240V
CIRCUIT 3
15
30
240V
CIRCUIT 4
'
15
30
SPARE
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE
STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY
DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA
STANDARDS AND SPECIFICATIONS. A SET OF APPROVED PLANS SHALL
BE KEPT ON -SITE AT ALL TIMES DURING CONSTRUCTION.
2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE
LIMITED TO 8:30 AM TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE
APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT
235 -2635. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE
APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN
ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911
SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE
AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR
DISTURBANCE. FOR UTILITY LOCATE CALL 48 -HOUR LOCATORS,
1 -800- 424 -5555.
4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE
REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY
PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE
ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL
CONSTRUCTION.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND
OTHERS ON THE CONSTRUCTION SITE. -
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN
STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY
CONSTRUCTION.
7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS.
8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
9. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO
95% MAXIMUM DRY DENSITY MODIFIED PROCTOR.
JB TA SPLICE (TYP.) ( 29,6103
I q4vml I
•
I
PHASE 6 LUMINAIRES
FZ L L
t
r I� j
Fl;t 375
.1 INSTALL COBRA HEAD LUMINAIRE ON LUMINAIRE POLE PER THE POLE SCHEDULE THIS SHEET, AND
CITY OF RENTON STANDARD PLANS, SHEETS IL4 AND IL5. TOP OF FOUNDATION SHALL BE FLUSH
WITH TOP OF SIDEWALK.
2 INTERCEPT EXISTING CONDUIT.
••
•R ' '•
TRANSPORTATION ENGINEERING NORTHWEST, LLC 5122k �
PO BOX 65254
all
SEATTLE, WA 98155 ��� •�'
(425) 806 9236
I
SCANNED NOV - 7 2003
.10
IV
oc
r�
0
w
0
0
y
`z
or
xa
.� ; ri
r �
■
cn ■
"a
m
z�
o�
M
11
t