HomeMy WebLinkAboutT-31492BT
M
I
0
0
W
F-
1
00 ®__
.. I A
of
3350 Mon to Villa Parkway 2 z mm nw
a . Bothell, Washington 98021-8972 43k
t
� 4=0 o
Land
(425)951 -4800 ' A8�0CIATSB, sss
(425)951 --4808 Fax 41W41- 3229 S- 140h Street
P.O. Haas 68846
whpacific.com 09/02/07 SmTm� Waslft$an 68188
TdVPa= (206) WO.0100/374.24= NO.
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www. xw .
SCALE
0 10. 20
FEEI
1 INCH = 20 FT
�.
i
wvip ,*T
i
ors
0
0
BARR
NS&IAL „HEAD NO.- PEDESTRIAN HEAD_ NO
21,22,41,42,61,62 26,27,46,47,
ALL PEDESTRIAN HEADS SHALL
HAVE 9 --INCH SYMBOLS AND
EGG CRATE VISORS BARRIER
CONSTRUCTION NOTES
QINSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J-7d. INSTALL DOWN GUY TO
COUNTERACT RESULTANT STRAIN. TOP THE POLE ABOVE STRAIN ATTACHMENT TO MINIMIZE
OVERHEAD CONFLICTS. COORDINATE WITH OVERHEAD UTILITIES FOR ATTACHMENTS OR
CLEARANCES. INSTALL TEMPORARY SERVICE PANEL FOR 20 AMPS , WITH METER BASE.
ARRANGE FOR ' CONNECTION AND INSPECTION. INSTALL A PEDESTRIAN DISPLAY WITH RISER
FROM ABANDONED SIGNALS ON PROJECT AND A 3 INCH CONDUIT RISER WITH WEATHERHEAD
TO THE TYPE 2 JUCTION BOX.
QINSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J -7d. INSTALL SIDEWALK DOWN GUY
TO COUNTERACT RESULTANT STRAIN. TOP THE POLE ABOVE STRAIN ATTACHMENT TO
MINIMIZE OVERHEAD CONFLICTS. COORDINATE WITH OVERHEAD UTILITIES FOR ATTACHMENTS
OR CLEARANCES. INSTALL TWO PEDESTRIAN DISPLAYS AND ONE PUSHBUTTON FROM
ABANDONED SIGNALS ON PROJECT AND INSTALL A RISER WITH WEATHERHEAD.
oINSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J-7d. INSTALL SIDEWALK DOWN GUY
TO COUNTERACT THE RESULTANT STRAIN. INSTALL ONE PEDESTRIAN DISPLAY AND
PUSHBUTTON FROM ABANDONED SIGNALS ON PROJECT. INSTALL CONDUIT RISER WITH
WEATHER HEAD.
4' INSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J-7d. INSTALL SIDEWALK DOWN GUY
TO COUNTERACT THE RESULTANT STRAIN.
QINSTALL A TEMPORARY CONCRETE FOUNDATION WITH A 3 INCH CONDUIT STUB OUT TO THE
TYPE 2 JUNCTION BOX AND A 1 1/2 INCH CONDUIT TO THE SERVICE PANEL. INSTALL
CONTROLLER CABINET FROM ABANDONED SIGNALS ON THE PROJECT.
INSTALL TYPE 2 JUNCTION BOX WITH GROUND -ROD. GROUND THE LID AND CONDUITS CIF
STEEL) OR RUN #8 FROUNO WIRE TO EXPOSED METAL COMPONENTS. INSTALL STUB OUT
FOR LOOP WIRES AND TERMINATE CONDUITS FROM POLE RISER AND CONTROLLER
FOUNDATION. SPLICE LOOP WIRES TO LEAD IN CABLE.
15INSTALL STRAIN CABLE WITH THROUGH BOLTS AND STRAIN INSULATORS PER STANDARD
PLAN J--7d.
®INSTALL DETECTION LOOPS IN SAWCUT. RUN LOOP WIRES IN SAWCUT TO CONDUIT STUB
OUT AT JUNCTION BOX. TWIST WIRES TWO TURNS PER FOOT IN SAWCUT.
<g>RUN AERIAL CONNECTION FOR POWER TO PSE REQUIREMENTS.
-SCHEDULE WIRING
mik
� I
��
� oe � n
CS9F:i11
a
• a.
o�■���ooa��
CITY OF
twa °e:
RENTON
ONE mm DATUM
"* na smy �., ,�. Planning /Building /Public Works Dept
r Nor cc "m
2 T11
3 Nor
!RIER
-- -- -- -- -- -- -- BARRIER
NOTE: REFER TO SHEET TS -00 FOR LEGEND
VEHICLE SIGNAL HEADS, PEDESTRIAN SIGNAL HEADS,
AND PUSH BUTTONS MAY BE USED FROM ABANDONED
SIGNALS ON THE PROJECT. HOWEVER, THE WORK
SEQUENCE SHALL CONSTRUCT THE TEMPORARY SIGNAL
FIRST WITHOUT HEADS. THE HEADS SHALL BE
TRANSFERED FROM THE ABANDONED SIGNALS WITHIN
TWO DAYS OF ROAD CLOSURES.
THE TEMPORARY SIGNAL SHALL BE PUT IN OPERATION
WITHIN TWO DAYS OF REDIRECTING TRAFFIC TO THE
DETOUR ROUTE.
ALL PAVEMENT MARKINGS SHALL BE COMPLETE
BEFORE ACTIVATING THE NEW TEMPORARY TRAFIC
SIGNAL.
CHECK FOR UNDERGROUND UTILITIES BEFORE DIGGING.
RELOCATIONS TO RESOLVE CONFLICTS SHALL BE
APPROVED BY THE ENGINEER.
THE CONTRACTOR SHALL ACQUIRE UTILITY PERMITS
AND INSPECTIONS.
CITY OF RENTON
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
TRAFFIC SIGNAL IMPROVEMENTS
GARDEN AVE N & N 10TH STREET
4/17/06
mm
Man Nor
TS -72
Smm
17A04