Loading...
HomeMy WebLinkAboutT-31492BT M I 0 0 W F- 1 00 ®__ .. I A of 3350 Mon to Villa Parkway 2 z mm nw a . Bothell, Washington 98021-8972 43k t � 4=0 o Land (425)951 -4800 ' A8�0CIATSB, sss (425)951 --4808 Fax 41W41- 3229 S- 140h Street P.O. Haas 68846 whpacific.com 09/02/07 SmTm� Waslft$an 68188 TdVPa= (206) WO.0100/374.24= NO. Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www. xw . SCALE 0 10. 20 FEEI 1 INCH = 20 FT �. i wvip ,*T i ors 0 0 BARR NS&IAL „HEAD NO.- PEDESTRIAN HEAD_ NO 21,22,41,42,61,62 26,27,46,47, ALL PEDESTRIAN HEADS SHALL HAVE 9 --INCH SYMBOLS AND EGG CRATE VISORS BARRIER CONSTRUCTION NOTES QINSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J-7d. INSTALL DOWN GUY TO COUNTERACT RESULTANT STRAIN. TOP THE POLE ABOVE STRAIN ATTACHMENT TO MINIMIZE OVERHEAD CONFLICTS. COORDINATE WITH OVERHEAD UTILITIES FOR ATTACHMENTS OR CLEARANCES. INSTALL TEMPORARY SERVICE PANEL FOR 20 AMPS , WITH METER BASE. ARRANGE FOR ' CONNECTION AND INSPECTION. INSTALL A PEDESTRIAN DISPLAY WITH RISER FROM ABANDONED SIGNALS ON PROJECT AND A 3 INCH CONDUIT RISER WITH WEATHERHEAD TO THE TYPE 2 JUCTION BOX. QINSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J -7d. INSTALL SIDEWALK DOWN GUY TO COUNTERACT RESULTANT STRAIN. TOP THE POLE ABOVE STRAIN ATTACHMENT TO MINIMIZE OVERHEAD CONFLICTS. COORDINATE WITH OVERHEAD UTILITIES FOR ATTACHMENTS OR CLEARANCES. INSTALL TWO PEDESTRIAN DISPLAYS AND ONE PUSHBUTTON FROM ABANDONED SIGNALS ON PROJECT AND INSTALL A RISER WITH WEATHERHEAD. oINSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J-7d. INSTALL SIDEWALK DOWN GUY TO COUNTERACT THE RESULTANT STRAIN. INSTALL ONE PEDESTRIAN DISPLAY AND PUSHBUTTON FROM ABANDONED SIGNALS ON PROJECT. INSTALL CONDUIT RISER WITH WEATHER HEAD. 4' INSTALL CLASS 2 TIMBER POLE PER STANDARD PLAN J-7d. INSTALL SIDEWALK DOWN GUY TO COUNTERACT THE RESULTANT STRAIN. QINSTALL A TEMPORARY CONCRETE FOUNDATION WITH A 3 INCH CONDUIT STUB OUT TO THE TYPE 2 JUNCTION BOX AND A 1 1/2 INCH CONDUIT TO THE SERVICE PANEL. INSTALL CONTROLLER CABINET FROM ABANDONED SIGNALS ON THE PROJECT. INSTALL TYPE 2 JUNCTION BOX WITH GROUND -ROD. GROUND THE LID AND CONDUITS CIF STEEL) OR RUN #8 FROUNO WIRE TO EXPOSED METAL COMPONENTS. INSTALL STUB OUT FOR LOOP WIRES AND TERMINATE CONDUITS FROM POLE RISER AND CONTROLLER FOUNDATION. SPLICE LOOP WIRES TO LEAD IN CABLE. 15INSTALL STRAIN CABLE WITH THROUGH BOLTS AND STRAIN INSULATORS PER STANDARD PLAN J--7d. ®INSTALL DETECTION LOOPS IN SAWCUT. RUN LOOP WIRES IN SAWCUT TO CONDUIT STUB OUT AT JUNCTION BOX. TWIST WIRES TWO TURNS PER FOOT IN SAWCUT. <g>RUN AERIAL CONNECTION FOR POWER TO PSE REQUIREMENTS. -SCHEDULE WIRING mik � I �� � oe � n CS9F:i11 a • a. o�■���ooa�� CITY OF twa °e: RENTON ONE mm DATUM "* na smy �., ,�. Planning /Building /Public Works Dept r Nor cc "m 2 T11 3 Nor !RIER -- -- -- -- -- -- -- BARRIER NOTE: REFER TO SHEET TS -00 FOR LEGEND VEHICLE SIGNAL HEADS, PEDESTRIAN SIGNAL HEADS, AND PUSH BUTTONS MAY BE USED FROM ABANDONED SIGNALS ON THE PROJECT. HOWEVER, THE WORK SEQUENCE SHALL CONSTRUCT THE TEMPORARY SIGNAL FIRST WITHOUT HEADS. THE HEADS SHALL BE TRANSFERED FROM THE ABANDONED SIGNALS WITHIN TWO DAYS OF ROAD CLOSURES. THE TEMPORARY SIGNAL SHALL BE PUT IN OPERATION WITHIN TWO DAYS OF REDIRECTING TRAFFIC TO THE DETOUR ROUTE. ALL PAVEMENT MARKINGS SHALL BE COMPLETE BEFORE ACTIVATING THE NEW TEMPORARY TRAFIC SIGNAL. CHECK FOR UNDERGROUND UTILITIES BEFORE DIGGING. RELOCATIONS TO RESOLVE CONFLICTS SHALL BE APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL ACQUIRE UTILITY PERMITS AND INSPECTIONS. CITY OF RENTON SOUTH LAKE WASHINGTON ROADWAY IMPROVEMENTS TRAFFIC SIGNAL IMPROVEMENTS GARDEN AVE N & N 10TH STREET 4/17/06 mm Man Nor TS -72 Smm 17A04