Loading...
HomeMy WebLinkAboutT-341201V) V) 0 Ld [-- 0U 3: V) 7F 1111,17- V) y0 3> 1, JZ Lj i= 7- rl." 0 0 0 1-- %J 7F 0 -#j Q- C Lo E-4 E-4 a N 0-4 q m 0) C: C m 1 JUNCTION BOX O r-4 .............. 2 JUNCTION BOX —0 PVC CONDUIT, SEE WIRE SCHEDULE 0 C14 _j 2 NOTE RENTON STANDARD PLANS J003, J009 & J014. IL ;o 51 V) V) 0 Ld [-- 0U 3: V) 7F 1111,17- V) y0 3> 1, JZ Lj i= 7- rl." 0 0 0 1-- %J 7F 0 -#j Q- C Lo E-4 E-4 a N 0-4 q m 0) C: C CONSTRUCTION NOTES m 1 JUNCTION BOX 0 .............. 2 JUNCTION BOX 1 PVC CONDUIT, SEE WIRE SCHEDULE 0 INSTALL O FOUNDATION AND LUMINAIRE PER CITY OF 2 NOTE RENTON STANDARD PLANS J003, J009 & J014. U9 51 T FIXTURE PERPENDICULAR TO CENTER LINE OF PVC 3-#2 NE 2ND PL, EXCEPT FOR POLE #2 WHICH WILL BE 2" SCHEID. 80 ROTATED 90° CLOCKWISE TO LIGHT THE HAMMERHEAD. LLI TYPE I JUNCTION BOX AND SPLICE CONSTRUCTION NOTES POLE SCHEDULE LUM. NO. m 1 JUNCTION BOX MH (FEET) .............. 2 JUNCTION BOX 1 PVC CONDUIT, SEE WIRE SCHEDULE 0 INSTALL O FOUNDATION AND LUMINAIRE PER CITY OF 2 NOTE RENTON STANDARD PLANS J003, J009 & J014. 70 24992 INSTALL FIXTURE PERPENDICULAR TO CENTER LINE OF PVC 3-#2 NE 2ND PL, EXCEPT FOR POLE #2 WHICH WILL BE 2" SCHEID. 80 ROTATED 90° CLOCKWISE TO LIGHT THE HAMMERHEAD. INSTALL TYPE I JUNCTION BOX AND SPLICE z O2 CONDUCTORS PER CITY OF RENTON STANDARD PLANS 0 J007 & J008 0 Co uj FOUNDATION AND SERVICE CABINET PER CITY O3INSTALL OF RENTON STANDARDS. CABINET ID #0126 PHOTOCELL ON LUMINAIRE AND RUN CONTROL OINSTALL CONDUCTORS TO THE SERVICE CABINET TO OPERATE THE CONTACTOR FOR THE LIGHTING SYSTEM CONDUIT AND SERVICE CONDUCTORS TO PSE OEXTEND SERVICE POINT z POLE SCHEDULE LUM. NO. TYPE 1 JUNCTION BOX MH (FEET) TYPE 2 JUNCTION BOX 1 PVC CONDUIT, SEE WIRE SCHEDULE 0 CONSTRUCTION NOTE AWIRE 2 NOTE POLE SCHEDULE LUM. NO. LOCATION OFFSET (FEET) MH (FEET) LUMINAIRE (WATTS) CITY POLE NUMBER 1 0+61.0 22.4 R T. 15.1 70 24971 2 1+95.9 00.0 RT. 15.1 70 24992 GRAPHIC SCALE 1 inch = 10 feet x WIRING SCHEDULE CONDUIT RUN 0 CONDUIT SIZE CONDUCTORS 1 2" SCHEID. 40 PVC 3-#8, 2-#10 2 2" SCHED. 40 PVC 3-#8 O 3 2" SCHEID. 40 PVC 3-#2 4 2" SCHEID. 80 PVC 1 3-#8 6 Z uj o > Lu 10 ul uj J w �z -C— 0 Lu Lu 0 -C— O z O z 0 Co Co Q) L-L-j Cf) Q) "< Q-) U _� Q-) O 1.1 SHEET L I OF 2