Loading...
HomeMy WebLinkAboutT-345107T S 0 to 4 N a s a 3 9 N �ka ILLUMINATION PLAN I JM CAMWEST ROSEMONTE PLAT NORTHWEST Y4, NORTHWEST Y4, SECTION 15, TOWNSHIP 23 NORTH, RANGE 5E., W.M. RENTON, WASHINGTON Z Z Q a. Z Z iraF � 3 Z F0_ J_ Ucr a 0 wz 0 C) C) 3 2 rE-4 v N-1 rn c v m o a s 3� ZviQ y�4 INEIN m x x CONTACTOR SERVICE 100A z CIRCUIT 1 2P -20 AMP 30 AMP CIRCUIT 2 (SPARE) w w 0 DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. OCONSTRUCTION NOTE OLUMINAIRE POLE NUMBER AWIRE 0 m m m a s s s d akQ Q N N N F N Oj 1� Q m INEIN m 2 W x O Q0 W OMV10W Z n 0 O N Y Z W N m m in ziL,, �3 uU) 3 Q�xc; p ZyYti LZg a coo 2 bYKm�K m o0� SERVICE BREAKER SCHEDULE SERVICE & CIRCUITS BREAKER CONTACTOR SERVICE 100A z CIRCUIT 1 2P -20 AMP 30 AMP CIRCUIT 2 (SPARE) 2P -20 AMP 30 AMP 0 DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. OCONSTRUCTION NOTE OLUMINAIRE POLE NUMBER AWIRE 0 a akQ k m m N m N z N Z 0 z � w � m � i i i z 2 W x O Q0 W OMV10W Z n 0 O N Y Z W N m m in ziL,, �3 uU) 3 Q�xc; p ZyYti LZg a coo 2 bYKm�K m o0� SERVICE BREAKER SCHEDULE SERVICE & CIRCUITS BREAKER CONTACTOR SERVICE 100A - -- CIRCUIT 1 2P -20 AMP 30 AMP CIRCUIT 2 (SPARE) 2P -20 AMP 30 AMP GENERAL NOTES 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON -SITE AT ALL TIMES DURING CONSTRUCTION. SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIMITED TO 8:30 AM TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2635. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. OCONSTRUCTION 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. FOR UTILITY LOCATE CALL 48 -HOUR LOCATORS, 1- 800- 424! -5555. (FUTURE BY OTHERS) 4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. B. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95% MAXIMUM DRY DENSITY MODIFIED PROCTOR. 10. THE CONTRACTOR SHALL PROVIDE MATERIALS SUBMITTALS AND POLE SHOP DRAWINGS TO THE CITY OF RENTON FOR APPROVAL AT THE EARLIEST POSSIBLE DATE. 11. AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE UTILITIES. HOWEVER, IT IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE PRIOR TO IMPLEMENTATION OF THE SCOPE OF WORK IDENTIFIED ON THESE DOCUMENTS. AS ARE NOT CONFLICTS WITH SUBSURFACE UTILITIES. ADDITIONALLY, THE CONTRACTOR SHALL CONFIRM THAT THERE IS A MINIMUM 10 -FT CLEARANCE PROVIDED BETWEEN OVERHEAD POWER LINES AND THE PROPOSED LUMINAIRE POLES PRIOR TO POLE PLACEMENT. ADDITIONAL CLEARANCE MAY BE' REQUIRED AS DIRECTED BY THE UTILITY. THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED. CONSTRUCTION NOTES OINSTALL DECORATIVE ROADWAY LUMINAIRE PER THE POLE SCHEDULE THIS SHEET, AND CITY OF RENTON STANDARD PLANS 003 & 004, SHEET IL4. TOP OF FOUNDATION SHALL BE FLUSH WITH TOP OF SIDEWALK. OINSTALL SERVICE CABINET #0141 PER CITY OF RENTON STANDARD PLANS, SEE DETAIL ON SHEET IL4. OPOWER SOURCE, APPROXIMATE LOCATION SHOWN. FURNISH AND INSTALL CONDUIT AND CONDUCTORS TO POWER SOURCE LOCATION, AND COORDINATE POWER SOURCE CONNECTION WITH PSE. 4 FUTURE LUMINAIRE POLE BY OTHERS. 5 INSTALL TYPE 1 JUNCTION BOX PER CITY OF RENTON STANDARD PLAN J016. OINSTALL TYPE 2 JUNCTION BOX PER CITY OF RENTON STANDARD PLAN J016. OFOR INFORMATION ONLY, PSE AND INTOLIGHT SHALL FURNISH AND INSTALL ALL INTERIOR POLES AND PROVIDE 7 ALL NECESSARY POWER CONNECTIONS. WIRING DIAGRAM CABINET ID = 0141 T=345107 ILLUMINATION LEGEND m TYPE 1 JUNCTION BOX Q TYPE 2 JUNCTION BOX ® LUMINAIRE POLE LUMINAIRE POLE M (FUTURE BY OTHERS) — — — — — CONDUIT /CONDUCTOR ® ELECTRICAL SERVICE CABINET OCONSTRUCTION NOTE OLUMINAIRE POLE NUMBER AWIRE NOTE ,6, r- 3q-5107 SCALE: 1 ° =40' By Date NLE AVE NE ILLUM SHEET I0 3Iq 5103 y �O H .0 u m W ro D