>- GENERAL NOTES
m
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH CURRENT CITY OF RENTON
STANDARD SPECIFICATIONS AND STANDARD DETAILS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PSE COORDINATION, INCLUDING
SUBMITTING APPLICATION FOR SERVICE CHANGE AND PAYING ANY APPLICABLE FEES
FOR PSE DESIGN AND CONSTRUCTION.
3. ANY OVERHEAD POWER LINES SHALL PROVIDE A MINIMUM OF 10' OF HORIZONTAL
o AND /OR VERTICAL CLEARANCE FROM ALL LIGHT STANDARDS /LUMINAIRES.
4. ALL NEW JUNCTION BOXES SHALL HAVE LOCKING LIDS PER DETAIL ON SHEET IL3.
I`
M • ■ SCHEDULE
TYPE M —C —III H.P.S. LUMINAIRE, ARM
AND ALUMINUM DAVIT STYLE POLE
LIGHT BASE AND TYPE 1 JUNCTION BOX
® WITH CONCRETE PAD
TYPE 1 JUNCTION BOX WITH CONCRETE PAD
OEM ELECTRICAL SERVICE CABINET
- - ® ®® PVC CONDUIT (SEE WIRING SCHEDULE)
WIRE NOTE
OCONSTRUCTION NOTE
POLE
C)_
o�
L�
Z
M
Y
00
MOUNTING
MAST
Q
N0.
U _
Z
W
) LLJ
n
>
a
0
DISTRIBUTION
) o
�E
a
_(D
SEC. 15, P 2 N , 5 E.9 '
>- GENERAL NOTES
m
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH CURRENT CITY OF RENTON
STANDARD SPECIFICATIONS AND STANDARD DETAILS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PSE COORDINATION, INCLUDING
SUBMITTING APPLICATION FOR SERVICE CHANGE AND PAYING ANY APPLICABLE FEES
FOR PSE DESIGN AND CONSTRUCTION.
3. ANY OVERHEAD POWER LINES SHALL PROVIDE A MINIMUM OF 10' OF HORIZONTAL
o AND /OR VERTICAL CLEARANCE FROM ALL LIGHT STANDARDS /LUMINAIRES.
4. ALL NEW JUNCTION BOXES SHALL HAVE LOCKING LIDS PER DETAIL ON SHEET IL3.
I`
M • ■ SCHEDULE
TYPE M —C —III H.P.S. LUMINAIRE, ARM
AND ALUMINUM DAVIT STYLE POLE
LIGHT BASE AND TYPE 1 JUNCTION BOX
® WITH CONCRETE PAD
TYPE 1 JUNCTION BOX WITH CONCRETE PAD
OEM ELECTRICAL SERVICE CABINET
- - ® ®® PVC CONDUIT (SEE WIRING SCHEDULE)
WIRE NOTE
OCONSTRUCTION NOTE
POLE
POLE
POLE
POLE
LAMP
NO.
MOUNTING
MAST
CIRCUIT
N0.
w
z
$
Z
>
a
WATTAGE
DISTRIBUTION
HEIGHT
a
N0.
LLz�
1756H
N.E. 4TH ST.
a
44.5' RT.
400
M —C —III
40'
14'
A
2
1758H
^LL
LL
SEC. 15, P 2 N , 5 E.9 '
>- GENERAL NOTES
m
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH CURRENT CITY OF RENTON
STANDARD SPECIFICATIONS AND STANDARD DETAILS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PSE COORDINATION, INCLUDING
SUBMITTING APPLICATION FOR SERVICE CHANGE AND PAYING ANY APPLICABLE FEES
FOR PSE DESIGN AND CONSTRUCTION.
3. ANY OVERHEAD POWER LINES SHALL PROVIDE A MINIMUM OF 10' OF HORIZONTAL
o AND /OR VERTICAL CLEARANCE FROM ALL LIGHT STANDARDS /LUMINAIRES.
4. ALL NEW JUNCTION BOXES SHALL HAVE LOCKING LIDS PER DETAIL ON SHEET IL3.
I`
M • ■ SCHEDULE
TYPE M —C —III H.P.S. LUMINAIRE, ARM
AND ALUMINUM DAVIT STYLE POLE
LIGHT BASE AND TYPE 1 JUNCTION BOX
® WITH CONCRETE PAD
TYPE 1 JUNCTION BOX WITH CONCRETE PAD
OEM ELECTRICAL SERVICE CABINET
- - ® ®® PVC CONDUIT (SEE WIRING SCHEDULE)
WIRE NOTE
OCONSTRUCTION NOTE
POLE
POLE
POLE
POLE
LAMP
NO.
MOUNTING
MAST
CIRCUIT
N0.
w
z
$
W
w
>
a
WATTAGE
DISTRIBUTION
HEIGHT
ARM
N0.
l^.l�
1756H
N.E. 4TH ST.
8 +29
44.5' RT.
400
M —C —III
40'
14'
A
2
1758H
^LL
LL
9 +34
44.5' RT.
400
M —C —III
40'
Q
A
W
Q
SEC. 15, P 2 N , 5 E.9 '
>- GENERAL NOTES
m
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH CURRENT CITY OF RENTON
STANDARD SPECIFICATIONS AND STANDARD DETAILS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PSE COORDINATION, INCLUDING
SUBMITTING APPLICATION FOR SERVICE CHANGE AND PAYING ANY APPLICABLE FEES
FOR PSE DESIGN AND CONSTRUCTION.
3. ANY OVERHEAD POWER LINES SHALL PROVIDE A MINIMUM OF 10' OF HORIZONTAL
o AND /OR VERTICAL CLEARANCE FROM ALL LIGHT STANDARDS /LUMINAIRES.
4. ALL NEW JUNCTION BOXES SHALL HAVE LOCKING LIDS PER DETAIL ON SHEET IL3.
I`
M • ■ SCHEDULE
TYPE M —C —III H.P.S. LUMINAIRE, ARM
AND ALUMINUM DAVIT STYLE POLE
LIGHT BASE AND TYPE 1 JUNCTION BOX
® WITH CONCRETE PAD
TYPE 1 JUNCTION BOX WITH CONCRETE PAD
OEM ELECTRICAL SERVICE CABINET
- - ® ®® PVC CONDUIT (SEE WIRING SCHEDULE)
WIRE NOTE
OCONSTRUCTION NOTE
POLE
POLE
POLE
POLE
LAMP
NO.
MOUNTING
MAST
CIRCUIT
N0.
ID NO.
STREET
LOCATION
OFFSET
WATTAGE
DISTRIBUTION
HEIGHT
ARM
N0.
1
1756H
N.E. 4TH ST.
8 +29
44.5' RT.
400
M —C —III
40'
14'
A
2
1758H
N.E. 4TH ST.
9 +34
44.5' RT.
400
M —C —III
40'
14'
A
WIRING SCHEDUL-3
RUN
NO.
CONDUIT
CONDUCTORS
REMARKS
1
EX. 1.5"
PVC
3 — #2
REMOVE EX. CONDUCTORS
2
1.5" PVC (SCHEDULE 80)
3 — #2
INTERCEPT, EXTEND EX. CONDUIT
3
2" PVC
(SCHEDULE
40)
2 — #8, 1 — #8 GREEN, 3 — #12 PHOTOCELL
4
2" PVC
(SCHEDULE
40)
2 — #8, 1 — #8 GREEN
5
2" PVC
(SCHEDULE
80)
1
SPARE, INSTALL PULLCORD
OCONNECT PHOTOCELL ON EXISTING LUMINAIRE TO NEW PHOTOCELL CONDUCTORS FROM ELECTRICAL
SERVICE CABINET. REPLACE ANY EXISTING SOLID COPPER CONDUCTORS BETWEEN JUNCTION BOX
AND LUMINAIRE WITH NEW STRANDED CONDUCTORS PER STANDARD SPECIFICATIONS. REPLACE
EXISTING FUSE KITS PER DETAILS ON SHEETS I1-3 AND I1-4. BOND EXISTING JUNCTION BOX LID.
OCOORDINATE WITH PUGET SOUND ENERGY (PSE) FOR DISCONNECTION OF SERVICE AT EXISTING
UTILITY POLE. REMOVE EXISTING SERVICE CONDUCTORS. REROUTE SERVICE ENTRANCE CONDUIT
(UNINTERRUPTED) TO ELECTRICAL SERVICE CABINET. INSTALL NEW SERVICE ENTRANCE
CONDUCTORS PER PSE REQUIREMENTS, COORDINATE WITH PSE FOR SERVICE RECONNECTION.