CITY OF RENTON COMMUNITY SERVICES DEPARTMENT
CONTRACT AGREEMENT
THIS AGREEMENT is made as of the- day of 0 between the
CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as "CITY"
and Northwest Asphalt, INC. , hereinafter referred to as "CONTRACTOR", to provide cart path paving at
the Maplewood Golf Course.
The City and Contractor agree as set forth below.
1. Scope of Services. The Contractor will provide all material and labor necessary to perform all work
described in the Proposal which is included with this Agreement.
2. Changes in Scope of Services. The City , without invalidating the Contract, may order changes in
the Services consisting of additions, deletions or modifications,the Contract Sum being adjusted
accordingly. Such changes in the work shall be authorized by written Change Order signed by the City
and the Contractor.
3. Time of Performance. The Contractor shall commence performance of the Contract no later than
October 7th, 2002 and shall complete the full performance of the Contract not later than October 21,
2002. If the Contractor fails to complete the Work by the completion date Liquidated Damages in the
amount of Five Hundred Dollars ($500.00) per day will be assessed for each calendar day the
Contractor exceeds the Completion Date. An extension of time will be granted if weather conditions
prohibit performance of work. A written request must be approved by the Owners Representative
based on working conditions, prior to extension of time being granted.
4. Contract Sum. The total amount of this Contract is the sum of($42,668.36) Forty-two thousand six
hundred sixty eight and 36/100 cents which includes Washington State Sales Tax.
5. Method of Payment. Payment by the City for the Services will only be made after the Services have
been performed and a voucher or invoice is submitted in the form specified by the City. Payment will
be made thirty(30) days after receipt of such voucher or invoice. The City shall have the right to
withhold payment to the Contractor for any work not completed in a satisfactory manner until such time
as the Contractor modifies such work so that the same is satisfactory. The City of Renton will retain
5%of final payment until such time as specified conditions have been met. See attachment.
6. Warranty. The Contractor shall be under the duty to remedy any defects in the work and pay for any
damage to other work resulting therefrom.
7. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion of this
Contract without express written consent of the City of Renton.
``w
8. Record Keeping and Reporting. The Contractor shall maintain accounts and records which properly
reflect all direct and indirect costs expended and services provided in the performance of this
Agreement. The Contractor agrees to provide access to any records required by the City.
9. Hold Harmless. The Contractor shall indemnify, defend and hold harmless the City, its officers,
agents, employees and volunteers, from and against any and all claims, losses or liability, or any
portion thereof, including attorneys fees and costs, arising from injury or death to persons, including
injuries, sickness, disease or death to Contractor's own employees, or damage to property occasioned
by a negligent act, omission or failure of the Contractor.
10. Insurance. The Contractor shall secure and maintain in force throughout the duration of this contract
Commercial General Liability insurance. A Certificate of Insurance evidencing the contractor's
insurance coverage shall be delivered to the City before executing the Work of this Agreement.
11. Compliance with Laws. The Contractor and all of the Contractor's employees shall perform the
services in accordance with all applicable federal, state, county and city laws, codes and ordinances.
12. Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the
City of Renton contract shall prevail.
This Agreement is entered into as of the day and year written above.
ONTRACTOR � CITY OF RENTON
PUB Signature Signature
CA5EJ PUB A VIcc'?ZE51 QElT Jesse Tanner, Mayor �Y
Printed Name and Title Printed Name and Title
Northwest Asphalt, Inc. '41," J
Business Name Attest
PO Box 1647
Bonnie Walton, City Clerk
Mailing Address Printed Name and Title
Renton WA 98057-1647
city State Zip
425-254-1820
Telephone
From AIA201-1997 *400
9.3 APPLICATIONS FOR PAYMENT
(these are additions that CIP dept. has added and uses as standard language)
9.3.1
Insert I: a. The Owner shall retain a sum equal to five percent (5%) of the amount earned by
the Contractor, as a trust fund for the protection and payment of any person or persons,
mechanics, subcontractor, or material suppliers, who shall perform any labor upon this Contract,
and all persons who shall supply such person or persons of Subcontractors with provisions and
supplies for carrying on of such work and the State of Washington with respect to taxes
imposed pursuant to RCW Title 82 which may be due from same Contractor.
Insert J: b. In accordance with the provisions of Chapter 60.28 RCW, above trust fund shall be
retained for a minimum period of sixty (60) days following Final Completion and when the
requirements of the Contract and requirements in AIA document A101-1997, section 5.2 , have
been fulfilled.
Insert K: In the event these requirements are not met, the Owner may pay a percentage of the
retainage, holding back that quantity of money reasonable to complete the unfinished items.
Retainage held may cover costs including, but shall not be limited to, the following: material
suppliers and laborer's liens, tax liens, cost and attorney's fees to defray the cost of foreclosing
all of the liens, costs, and Architect's fees to defray cost of additional Construction
Administration services. Refer to AIA document A101-1997, section 5.2 — FINAL PAYMENT
and specifications.
From AIA document A101-`M57
5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress
payment shall be computed as follows:
.1 Take that portion of the Contract Sum properly allocable to completed Work as
determined by multiplying the percentage completion of each portion of the Work by the
share of the Contract Sum allocated to that portion of the Work in the schedule of
values, less retainage of five percent(5%). Pending final determination of cost to the
Owner of changes in the Work, amounts not in dispute shall be included as provided in
Subparagraph 7.3.8 of AIA Document 201-1997.
.2 Add that portion of the Contract Sum properly allocable to materials and equipment
deliverd and suitably stored at the site for subsequent incorporation in the completed
construction (or, if approved in advance by the Owner, suitably stored off the site at a
location agreed upon in writing), less retainage of five percent (5%).
.3 Subtract the aggregate of previous payments made by the Owner; and
.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for
Payment as provided in Paragraph 9.5 of AIA Document A201-1997.
5.1.7 The progress payment amount determined in accordance with Subparagraph 5.1.6 shall
be further modified under the following conditions:
.1 Add, upon Substantial Completion of Work, a sum sufficient to increase the total
payments to ninety-five percent (95%) of the Contract Sum, less such amounts as the
Architect shall determine for incomplete Work, retainage applicable to such work and
unsettled claims.
.2 Add, if final completion of Work is thereafter materially delayed through no fault of the
Contractor, any additional amounts payable in accordance with Subparagraph 9.10.3 of
AIA Document A201-1997.
5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be
made by the Owner to the Contractor when:
.1 the Contractor has fully performed the Contract except for the Contractor's responsibility
to correct Work as provided in Subparagraph 12.2.2 of AIA Document A201-1997, and
to satisfy other requirements, if any, which extend beyond final payment; and
.2 A final Certificate for Payment has been issued by the Architect.
.3 Affidavits of Wages Paid have been certified by the Washington State Dept. of Labor
and Industries.
.4 Proof of Taxes paid has been certified by the Washington State Dept. of Revenue.
.5 Proof of release of any labor, material or other claims against retainage has been
submitted to the City.
.6 Passage of statutory time for filing lien claims without any such filing or if there are any
lien claims filed, failure to prosecute those claims within statutory times or if timely
prosecuted, final judgement.
Scope of Work
Maplewood Golf Course Paving
Backside Cart Paths
1. Provide a written estimate including tax for the remaining cart paths on
the back nine holes. Include the following items.
1.) Fine grade & compact existing cart paths
2.) Apply weed kill before paving
3.) Apply class `B"hot mix compacted to 2 inches
The Golf Course will supply crushed rock if necessary.
2. Provide a written estimate including tax for the drive area in front of the
Maintenance office. Include all previous items. ( Change item 3 to read 4
inches for this section.)
Steve Meyers
Golf Course Superintendent
425-430-6806
Fax 425-430-6801
i
ST
is
;. TEE —
!`-f j`f
JE C-'P'H�l
l io'wu� l
1-7 TEE
,IT GRE�tJ
N
IIf
/1
i_i
, r
1
'®ro
ID
r-af�f FIRTH S g� WIDE
T
EkC�-:PT wv-IEpc NBTCo
8� u►►DE
13
T
13 o'
T ��d�
10
10� wIDE
START TO F 1Ni,SH
i