HomeMy WebLinkAboutR-365314PORTION OF NE 1/4 OIF SEC 16, T 23 N, R 5 E., W. M. MAINTAIN BARRIER FENCE THRDDQUT
I
46p\ ENTIRE CONSTRUCTION PERIOD
DECIDUOUS TREE
0
EX STMH I I CLEARING LIMITS
RIM EL = 460.96' ° (I.° XISTING T 2/28/13
OF EL = 460.26' _ E (STING FENCE .d TO BE RF OVEO D ACE a 2' OUTSIDE OF
INV EL = 457.50' -12" o° 'BE REMOVED . o ON WEST SIDE MP OVEMTS 6' I DRIP LINE &1 STAPLE OTO STAKE
h o AS 0 D PLAN I I ALL ARO ND
❑ ° °
— DRIVEN 2x2 FIR STAKES
INV EL 457. 9' -12'.1 ,PAD �LE -r I f /r_ p`O — _ _ — — — I SET PLUMB &FINLNE
6 X vZy
FF = 46, I 2" LAYER BARK MULCH O
rl i I CB #1 (TYPE 1) q
r" ! ° I STA 4 +18 I 4v 2 "' DISHED EDGE
STA 4 +10.0 11,6.0 LT RIM = 461.8 i I �Q PULL BACK BURLAP
/< "' V EL - 459.1 1 4 D AND REMOVE WIRE
NV I 8.Q0. -12.,- - I _I it 6ry5 I a Q D BASKET 0/50 TOPSOIL/
6 84'40' "E. _ -- 10.00 NATIVE SOIL MIX
y. -, - w > I D D Q D PLANT PIT 3 TIMES 3
°
N84-40'40- W _ ° o N I ,I av 4a ROOTBALL DIAM. AT TOP 2
45.76' 1
m °°. „i TWICE AT BOTTOM ^'
- -
1.5" GALVANIZED PIPE
D A 2 >) ` _ ® 10' 0 TYP TREE STAKING DETAIL
FF = 46t.59 al o° tip` 10.00' m 6.0"
A
/ v
11 � h9 O I 2 i
1
\ o
1 1
1 1
1 1
1 0
0 0
1 1
1 / 1
0 1
1 1
1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1
1
1 1
1 1
1 1
1 1
1 1
1 1
1 I
II 1
1 1 1
1 1 -
DIRECT BURY 18-24" °
INTO NATIVE SOIL N.T.S.
6' TEMPOARY CHAIN
LINK FENCEING iIIIIIIIIII O
Fla TIVE SOIL NATIVE SOIL
PLANT PIT 3 TIMES (/� (/) 8
24" ROOTBALL DIAM. AT TOP
2/28/13 80
_ ( \fi //J►r _ SIGN TO BE INSTALLED i
CLEARING LIMITS - -_ fn I If \ I /p1(1 10' SPACING ON FENCE EVERY 50 FEET TWICE AT BOTTOM.
X' (MIN OF TWO SIGNS)
.84' 4'4 0^ z -{ _.
I 3X r oc TREE PRESERVATION FENCING
o IIII���
5' GP Z I I ° �' EXISTING LIGHT POLE I ? CONIFEROUS TREE 2'
RPOR I TO BE R MOVED AND PLACED I ^"t PLANT PIT 3 TIMES a'
ON WEST IDE OF IMPROVEMTS / V�,C,,, 3 FOOTBALL DIAM. AT TOP illll llltli. � O LLu
°/ ,r i .° d it AS CITED ON THIS PLAN T^i ~ �„ TWICE AT BOTTOM (III 2x2 FIR TREE STAKE
INV EL 460.88' -12" ,ry I ° -I -;I 484 0
I `� ``C,i `O � 2" LAYER BARK ���igIIII 1 CHAINLOCK, LOCK
Y - H' / (III & STAPLE TO STAKE g 6
P 3 z Illlllulm. ,
i FF = ()R ®I .,1.. _l I� (fYP)12/28/13 4FZ °f -`V�2'" DISHED EDGE III
p W I FOLD BACK TOP •nNlnaflll III l lluunu" 2" BARK MULCH O 1v ^ n
J 0 > THIRD OF BURLAP 2" DISHED EDGE
•/_ W > 50/50 TOPSOIL/ UNFOLD TOP THIRD
` F - I ¢ I
_ - -- -- 1
I OF BURLAP & REMOVE NATIV E S OIL MIX z WRE BASKET 84 0'40 "E p z
n
I'
105 O " I 50
50 TOPSOIL/
0 NATIVE SOIL MIX -
- py N.T.S. _
RIM EL = E4s4T39 < ? 4� �° �z h7 CONIFEROUS TREE STAKING 10
OF EL = 464.0 / I- �a°. X I 0' ��� I N.T.S.
INV EL = 460.16' -12 - f I"� 1 I cO
1 \�
4
W
v
!w
466 1 q� I ,
�r Linear Application of DeepRoot Tree Root Barriers at Time
)2
` 1 - of Installing Concrete Sidewalks and Curbsg
F 1 �P %
I° J EXISTING FENCE TO
AIR-
BE REMOVED -- I �I
° • / � I I � - TYPICAL SECTION OF CURB AND GUTTER WRH DEEPROOT
137,$ ' �- TREE ROOT BARRIER INSET RNTOCONCRETE.
INV EL 460.96' -12' 0. IN STALLED I N A T ENC H N SUBGR AD E WHICH
S 1l-
THEN COMPACTED. BARRIER IS SET SO THAT TOP EDGE
0
- WILL BE 2" (5CM) BELOW FINISH GRADE OF CURB, AND SET
I� FLUSH WITH EDGE OF CURB. BARRIER RIBS FACE TOWARD
TREE ROOTS. Tap of root border 2" (5cm) below
X finish grade of curb
p)� ' t I INSTALLATION SEQUENCE:
h7 \ f I I Concrel@
O 1. Prepare base and subgrade
a°
6s \
'` \ I 2. Trench to appropriate depth for installation of
,NCO
0 � 1 1 5T ST root barrier so that top of barrier is 2" (5cm)
I I below finish grade of top of curb. Compacted crushed base
I 3. Place root barrier in trench, vertical ribs must
6� S face toward tree roots.` "r
\ INV EL = 465.22 24'CMP -
F� 4, Backfdl and compact to requirements, Subgrade compaction
5 Place form material against barrier (It may be T I De Root UB 24 -2
A- INV EL 461.76' -24"
+
CLEARING LIMITS r
2/28/13 // L� r • _ �IL O I
Y 6`
sg �� / � 'i I
CSP 9 T6 II
zrZ1\ ` 7 / / r L
X
470 � S �
s W
W, W 9
W t ` W 0 "D
EX 10 "6I W 681 D
o. y,
Y
STA
SITE 254 Ox
ssa`
o'
AN q)0
� u
O w o I
o
a 4
n o
CLEARING LIMITS
2/28/13
NOTES
COMPOSTED TOPSOIL IN TREE AND PLANT PITS AND MIX WITH NATIVE SOIL PER DETAIL I
TALL 4' DIAM. CIRCLE OF BARK MULCH AROUND ALL TREES AND IN 5' PLANTING STRIP.
)VIDE ONE YEAR WRITTEN WARRANTY FOR ALL PLANTS.
)VIDE ADEQUATE WATER TO ALL TREES THROUGH FIRST GROWING SEASON.
✓E AND PROTECT ALL TREES TO REMAIN PER DETAIL.
TALL ROOT BARRIER ALONG CURBS AND SIDEWALKS WITH ADJACENT TREES. I
R- 365314
1,51111 1
nailed from the outside of the form) oVUonal usee o! UB 18 -2
PLANT LIST w g
TYPICAL SECTION OF CURB, GUTTER AND SIDEWALK INSTALLATION SEQUENCE: L
°LY WITH DEEPROOT TREE ROOT BARRIER INSET INTO CL
CONCRETE 1. Prepare base and subgmde 16 ACER RUBRUM RED MAPLE Q
2. Trench to appropriate depth for
BARRIER INSTALLED IN C TRENCH IN SIS SET E installation border root barrier so that 2" CAL. SPACED AS SHOWN ~ Z
WHICH T THEN COMPACTED. BARRIER IS OV top of re o is 2" (5cm) below N Q
SO THAT TOP EDGE WILL BE 2" (5CM) ABOVE finish grade of top of sidewalk (or
COMPACTED BASE (or halfway between base halfway between top of compacted base r ~
and finish grade of SW). BARRIER RIBS and finish grade of SW) w
FACE TOWARD TREE ROOTS.
3. Place root barrier in trench, vertical
A
Concrete ribs must face toward tree roots. ° 8 PSEUDOTSUGA MENZIESI — LL.I
4. Backfdl and compact to requirements. CK
5. Place form material against barrier DOUGLASFIR 6 -7' HT.
, ° (It may be nailed from the outside LI..I
° of the form) SPACED AS SHOWN (/� W
Subgrode compaction Compacted crashed base.
Typical DeepRoot UB 24 -1. r
optional use of UB 18 -2 3 RHODODENDRON
IMPORTANT NOTE: Tree location must align
with "as— built" center of barrier. RHODODENDRON CATAWBIENSE
18 -24 INCH
Top of root barrier2'a'. -
(OCm) below finish •. e ° { e {
grade of curb a II
�h I'
Bose �� '�'^ Sidewalk
�' TREES TO BE REMOVED r�
Su rode Curb and Gutter
Tvoical DeepRoot UB 24-2. ODhanal use of UB 18 -2. _ n
/� r?., - R - --z.;, 145 1 q
C
A
zm `J
L7 t4
m9
.J •O_1n 1
TKO O
AXp I'
pm
zb
/� r?., - R - --z.;, 145 1 q
C
A
zm `J
L7 t4
m9
.J •O_1n 1
TKO O
AXp I'
pm
zb