Loading...
HomeMy WebLinkAboutDOH Approval Letter of 2012 WSP Update tiTA: .. et 9 6 x` J =‘ ,�V RECEIVED O ` 1889 a STATE OF WASHINGTON SEP 2 0 2013 DEPARTMENT OF HEALTH NORTHWEST DRINKING WATER REGIONAL OPERATIONS CITY OF RENTON 20425 72nd Avenue South,Suite 310,Kent Washington 98032-2388 UTILITY SYSTEMS September 19, 2013 JD WILSON PE RENTON CITY OF 1055 SOUTH GRADY WAY RENTON WA 98057 RE: Renton, City of, ID# 71850 King County Water System Plan -APPROVAL Submittal # 12-0213 Dear Mr. Wilson: The City of Renton water system plan(WSP), received in this office on February 22, 2012,with a subsequent submittal on January 2, 2013, has been reviewed and in accordance with the provisions of WAC 246-290-100, is hereby APPROVED. Approval of this WSP is valid as it relates to current standards outlined in Washington Administrative Code (WAC)246-290 revised March 18, 2012; WAC 246-293 revised September 1997, and is subject to the qualifications herein. Future revisions in the rules and statutes may be more stringent and require facility modification or corrective action. An approved update of this WSP is required on or before September 19,2019, unless ODW requests an update or plan amendment pursuant to WAC 246-290-100(9). APPROVED NUMBER OF CONNECTIONS The analysis provided in this WSP shows the water system has sufficient capacity to meet the growth projections during this planning period. The City of Renton water system can support an "unspecified"designation for its approved number of connections. A specific number of approved connections will not be applied at this time. Development may occur in compliance with the schedule and information provided in this WSP. This designation may be rescinded(and replaced with a specified number of approved connections) if ODW determines that the WSP is no longer representative of system activities. LOCAL GOVERNMENT CONSISTENCY This document meets local government consistency requirements for WSP approval pursuant to DOH "Local Government Consistency, RCW 90.03.386, and RCW 43.20. ® 0 Renton, City of Water System September 19, 2013 Page 2 SERVICE AREA AND DUTY TO SERVE Pursuant to RCW 90.03.386(2),the service area identified in this WSP service area map may now represent expanded"place of use" for this system's water rights. Changes in service area should be made through a WSP amendment. The City of Renton has a duty to provide new water service within its retail service area. This WSP includes service policies to describe how your system plans to provide new service within your retail service area. CONSTRUCTION WAIVERS Standard Construction Specifications for distribution main extensions in this WSP are approved. Consistent with WAC 246-290-125(2), this system may proceed with the installation of distribution main extensions provided this system completes and keeps on file the enclosed construction completion report form in accordance with WAC 246-290-125(2)and WAC 246-290- 120(5)and makes it available for review upon request by ODW. WATER RESOURCES Below is the general regulatory language that applies to all water system approvals: This approval does not provide any guarantee and should not be considered to provide any guarantee concerning legal use of water or subsequent water rights decisions by the Department of Ecology. Questions concerning water rights should be directed to the Department of Ecology. Thank you for your cooperation. King County is being notified of the terms of this approval and the determination of the approved number of connections. If you have any questions or wish to check our records,you may contact either of us at the numbers listed below. Sin-: y, 1.110 ik • - � ►, Richard Rodriguez ' Paige Igoe, P.E. WSDOH Regional Planner Regional Engineer (253) 395-6771 (253)395-6764 Encl: Construction Completion Report cc: Steve Hirschey, King County UTRC Seattle/King County Health Jacque Klug, Dept. of Ecology,NWRO w/CD Lara Kammereck, P.E., Carollo Engineers CONSTRUCTION COMPLETION REPORT FOR DISTRIBUTION MAIN PROJECTS In accordance with WAC 246-290-120(5),a Construction Completion Report is required for all construction projects. Under the submittal exception process for distribution main projects,designed by a professional engineer but not submitted to DOH for approval,the report does not need to be submitted. However,the purveyor must keep the Construction Completion Report on file and make it available for review upon request by DOH in accordance with WAC 246-290-125(2)(b). Furthermore: (1) The report form must bear the seal,date and signature of a professional engineer(PE)licensed in the state of Washington;and (2) Per WAC 246-290-120(5)(c),the amount of change in the physical capacity of a system must be documented,if the project results in a change in physical capacity. RENTON,CITY OF DOH System ID No.: 71850 Name of Water System STEVEN(GEORGE)STAHL Date Water System Plan that includes Name of Purveyor(Owner or System Contact) Standard Construction Specifications 3555 NE 2ND ST Date Standard Specifications Mailing Address Approved by DOH: RENTON,WA 98056 City State Zip PROJECT NAME AND DESCRIPTIVE TITLE: (Include the name of any development project and number of services.) Date Project or Portions Thereof Completed PROFESSIONAL ENGINEER'S ACKNOWLEDGMENT The undersigned professional engineer(PE),or his/her authorized agent,has inspected the above-described project that,as to layout,size and type of pipe,valves and materials,and other designed physical facilities,has been constructed and is substantially completed in accordance with construction documents reviewed by the purveyor's engineer. In the opinion of the undersigned engineer,the installation,physical testing procedures,water quality tests,and disinfection practices were carried out in accordance with state regulations and principles of standard engineering practice. I have reviewed the disinfection procedures,pressure test results,and results of the bacteriological test(s)for this project and certify that they comply with the requirements of the construction standards/specifications approved by DOH. Date Signed Name of Engineering Firm P.E.'s Seal Name of PE Acknowledging Construction Mailing Address City State Zip Engineer's Signature State/Federal Funding Type(if any) Please keep a completed,signed,and stamped copy on file. Z NWRO Drinking Water ❑ SWRO Drinking Water ❑ ERO Drinking Water Department of Health Department of Health Department of Health 20425 72"d Ave.S,Ste 310 PO Box 47823 16201 E Indiana Ave,Suite 1500 Kent,WA 98032-2358 Olympia,WA 98504-7823 Spokane Valley,WA 99216 (253)395-6750 (360)236-3030 (509)329-2100 For persons with disabilities, this document is available on request in other formats. To submit a request, please call 1-800-525-0127 (TTY 1-800-833-6388). DOH Form#331-147 (03/07)