Loading...
HomeMy WebLinkAboutD-205736LO 0 N N CL .G ACCUMULATED SEDIMENT STARTING TO BLOCK CHANNEL TH VEGETATION FOR ACCESS REMOVANE ACCUMULATED SE DIME IF NE ED, ONLY AS DIRECTED BY HD LABOR, VACTOR, OR ALL EXCAVATOR BYCITY WORKING /TEMPORY ORDINARY HIGH EA WITH WATER LINE ER FABRIC, (TYPICAL) G, AND EEDED TOP OF BA O �. w E A UST BOULDER LOC IONS, IF NE D ICAL CHANNEL CLEANING DETAIL NTS DETAILS NOT USED THIS YEAR TREES AND TOP OF BANK THIN VEGETATION, AS DIRECTED BY CITY REMOVEACC SEDIMENT Typically 3 to 5 TYPICAL SECTION E -E (LOOKING UPSTREAM) EX. TREES AND SHRUBS TEMPORARY BERM APPROX. 1 TO 1.5 FT HIGH FROM SANDBAGS, PLASTIC FaHEETING, FILTER FABRIC, 1 ft deep WIDTH VARIES 5' TO 6 TYPICAL 6" (TYPICAL) BOULDER NS, IF NEEDED CAL CHANNEL CLEANING - SECTION NTS RECOMMENDED 1 FOR APPROVAL \. BY Daniel Carey 6/10/1 BY REMOVE GRASS AND SEDIMENT PLACE TEMPORARY TO GRAVEL BOTTOM BY HAND LABOR STAKES AND FILTER FABRIC IN AREAS IDENTIFIED BY CITY FENCE AROUND WORK AREA R2 - SEDIMENT AND GRASS REMOVAL NTS NOTES 1. CITY MAY ADJUST, ADD OR REMOVE, SEDIMENT CLEANING AREAS AS NEEDED. 2. WORK ON THE CHANNEL AND 10TH AND 11TH NOT INTERFERE WITH GOLF COURSE PLAY. NO. REVISION AND VEGETATION FAIRWAYS SHALL su� ORW: DC BY I DATE I APPR I —s RS / RS WEST ACCESS ROAD APPX EL 115.17 30 MIL PVC —/ 8" PERF. BASIN LINER * SOME AREAS MAY HAVE ONLY DRAIN PIPE 2 "to 3" OF GRAVEL COVER ABOVE THE LINER TYPICAL SECTION THRU MIDDLE OF SEDIMENT BASIN, WEST -EAST (NTS, VERTICAL DISTORTED) D- 205136 Hw19w CITY 0E AS NOTED "auoHru, Ha isa� /Iasi .� RENTON OXE IHpI (!DIATU' V nr rvu sruc Planning /Building /Public Works Dept. IF Npi ONE INCH SG{f MURpIN0.Y \� 2013 Cleaning MAPLEWOOD CREEK SEDIMENT BASIN CLEANING & MAINTENANCE PROJECT DETAILS ,'L-a05-736 6/10/13 PILE onunlro ro 6 a x 6 mmmmmm fi GOLF COURSE I FAIRWAY 41 - - - ,.z5�`' PROVIDE TEMP NET OR SHIELD TO PROTECT WORKERS FROM L`v' GOLF BALLS. MIN 5' HIGH GRAVEL CHANNEL BOTTOM R2 - SEDIMENT AND GRASS REMOVAL NTS NOTES 1. CITY MAY ADJUST, ADD OR REMOVE, SEDIMENT CLEANING AREAS AS NEEDED. 2. WORK ON THE CHANNEL AND 10TH AND 11TH NOT INTERFERE WITH GOLF COURSE PLAY. NO. REVISION AND VEGETATION FAIRWAYS SHALL su� ORW: DC BY I DATE I APPR I —s RS / RS WEST ACCESS ROAD APPX EL 115.17 30 MIL PVC —/ 8" PERF. BASIN LINER * SOME AREAS MAY HAVE ONLY DRAIN PIPE 2 "to 3" OF GRAVEL COVER ABOVE THE LINER TYPICAL SECTION THRU MIDDLE OF SEDIMENT BASIN, WEST -EAST (NTS, VERTICAL DISTORTED) D- 205136 Hw19w CITY 0E AS NOTED "auoHru, Ha isa� /Iasi .� RENTON OXE IHpI (!DIATU' V nr rvu sruc Planning /Building /Public Works Dept. IF Npi ONE INCH SG{f MURpIN0.Y \� 2013 Cleaning MAPLEWOOD CREEK SEDIMENT BASIN CLEANING & MAINTENANCE PROJECT DETAILS ,'L-a05-736 6/10/13 PILE onunlro ro 6 a x 6 mmmmmm