Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract
* . CAG-02-072 Now Ntere 1997 Edition -Electronic Format AIA Document A101-1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the 20th day of June in the year of 2002 THIS DOCUMENT HAS IMPORTANT LEGAL (In words,indicate day,month and year) CONSEQUENCES.CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH BETWEEN the Owner: RESPECT TO ITS COMPLETION OR MODIFICATION.AUTHENTICATION OF (Name,address and other information) THIS ELECTRONICALLY DRAFTED AIA City of Renton DOCUMENT MAY BE MADE BY USING AIA 1055 South Grady Way DOCUMENT D401. Renton, Washington 98055 AIA Document A201-1997,General and the Contractor: Conditions of the Contract for (Name,address and other information) Construction,is adopted in this document CHG Building Systems. Inc. by reference.Do not use with other 1120 SW 16th, Suite 4 general conditions unless this document is modified. Renton,Washington 98055 425-255-5747 This document has been approved and endorsed by The Associated General The Project is: Contractors of America. (Name and location) A CBC steel building to be erected for Police Evidence Vehicle Storage at the site commonly known as 3555 NE 2nd St., Renton, WA 98055. located south of the City Facility Shops, in King County, WA. The Architect is: (Name,address and other information) Pacific Engineering Technologies, Inc. 1300 Dexter Ave N., Suite 100 Seattle, Washington 98109 The Owner and Contractor agree as follows. ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Immo Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications ,;" issued issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the ., .2sr entire and integrated agreement between the parties hereto and supersedes prior negotiations, " representations or agreements, either written or oral. An enumeration of the Contract Documents,other than Modifications,appears in Article 8. ®1997 AIM) AIA DOCUMENT A101-1997 ARTICLE 2 THE WORK OF THIS CONTRACT OWNER-CONTRACTOR AGREEMENT The Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. The American Institute of Architects 1735 New York Avenue, N.W. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION Washington, D.C. 20006-5292 ® 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, O 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/19/2002.AIA License Number 1008538,which expires on 3/30/2003. 1 CAG-02-072 Now Nisi' 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or,if applicable,state that the date will be fixed in a notice to proceed.) The date of commencement shall be the date of the Notice to Proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests,the Owner's time requirement shall be as follows: THIS DOCUMENT HAS IMPORTANT LEGAL 3.2 The Contract Time shall be measured from the date of commencement. CONSEQUENCES.CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than MODIFICATION.AUTHENTICATION OF days from the date of commencement,or as follows: THIS ELECTRONICALLY DRAFTED AIA (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of DOCUMENT MAY BE MADE BY USING AIA commencement. Unless stated elsewhere in the Contract Documents,insert any requirements for earlier Substantial DOCUMENT D401. Completion of certain portions of the Work.) The Contractor shall achieve Substantial Completion of the entire Work no later than AIA Document A201-1997,General five (5)weeks upon slab completion or December 31, 2002, whichever comes first. Conditions of the Contract for Construction,is adopted in this document ,subject to adjustments of this Contract Time as provided in the Contract Documents. by reference.Do not use with other (Insert provisions,if any, for liquidated damages relating to failure to complete on time or for bonus payments for general conditions unless this document is early completion of the Work.) modified. Liquid Damages in the amount of Two Hundred ($200.00)will be assessed for each calendar day that the Contractor exceeds the final completion date a stipulated This document has been approved and above. endorsed by The Associated General Contractors of America. ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be One Hundred Nineteen Thousand, Three Hundred Dollars and no/100 (which includes Washington State Sales Tax)Dollars($ 119,300.00, which includes Washington State Sales Tax. ), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any,which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates.If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement,attach a schedule of such other alternates showing the amount for each and the date when that amount expires) The Contract Sum is based on the base bid of$119,300.00 (figures include Washington State Sales Tax). 4.3 Unit prices,if any,are as follows: N/A by • ARTICLE 5 PAYMENTS mom 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor 01997 AIA® and Certificates for Payment issued by the Architect,the Owner shall make progress payments AIA DOCUMENT A101-1997 on account of the Contract Sum to the Contractor as provided below and elsewhere in the OWNER-CONTRACTOR AGREEMENT Contract Documents. The American Institute of Architects 1735 New York Avenue,N.W. 5.1.2 The period covered by each Application for Payment shall be one calendar month Washington,D.C.20006-5292 ending on the last day of the month,or as follows: O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, ® 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/19/2002.AIA License Number 1008538,which expires on 3/30/2003. 2 CAG-02-072 The Contractor will be provided wra copy of the City's Accounts Payable Calendar. The Contractor shall submit each Application for Payment a minimum of one week before each month's Cut Off date. Payment will be made according to the City's Accounts Payable Calendar. 5.1.3 Provided that an Application for Payment is received by the Architect Contractor not later than the day of a month,the Owner shall make payment to the Contractor not later than the day of the month. If an Application for Payment is received by the Architect after the application date fixed above,payment shall be made by the Owner not later than days after the Architect receives the Application for Payment. N/A THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES.CONSULTATION WITH 5.1.4 Each Application for Payment shall be based on the most recent schedule of values RESPECT PECT ATTORNEY ITS IS ENCOURAGED COMPLETION WITH PP Ym RESPECT 70 ITS COMPLETION OR submitted by the Contractor in accordance with the Contract Documents. The schedule of MODIFICATION.AUTHENTICATION OF values shall allocate the entire Contract Sum among the various portions of the Work. The THIS ELECTRONICALLY DRAFTED AIA schedule of values shall be prepared in such form and supported by such data to substantiate its DOCUMENT MAY BE MADE BY USING AlA accuracy as the Architect may require. This schedule,unless objected to by the Architect,shall DOCUMENT D401. be used as a basis for reviewing the Contractor's Applications for Payment. AIA Document A201-1997,General 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion Conditions of the Contract for of the Work as of the end of the period covered by the Application for Payment. Construction,is adopted in this document by reference.Do not use with other 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress general conditions unless this document is modified. payment shall be computed as follows: This document has been approved and .1 Take that portion of the Contract Sum properly allocable to completed Work as endorsed by The Associated General determined by multiplying the percentage completion of each portion of the Work by Contractors of America. the share of the Contract Sum allocated to that portion of the Work in the schedule of values,less retainage of Five percent ( 5%). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Subparagraph 7.3.8 of AIA Document A2o1-1997. .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction(or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing),less retainage of Five percent( 5%); .3 Subtract the aggregate of previous payments made by the Owner;and .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Paragraph 9.5 of AIA Document A2o1-1997. 5.1.7 The progress payment amount determined in accordance with Subparagraph 5.1.6 me shall be further modified under the following circumstances: 14Ij ./. . .1 Add,upon Substantial Completion of the Work,a sum sufficient to increase the total t,`. ;,. t- payments to the full amount of the Contract Sum,less such amounts as the Architect 1. shall determine for incomplete Work,retainage applicable to such work and unsettled ammo claims;and (Subparagraph 9.8.5 of AIA Document A2o1-1997 requires release of applicable retainage upon Substantial 01997 AIA® Completion of Work with consent of surety,if any.) AIA DOCUMENT A101-1997 OWNER-CONTRACTOR AGREEMENT .2 Add,if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph The American Institute of Architects 9.10.3 of AIA Document A2o1-1997. 1735 New York Avenue, N.W. Washington,D.C.20006-5292 5.1.8 Reduction or limitation of retainage,if any,shall be as follows: (If it is intended,prior to Substantial Completion of the entire Work,to reduce or limit the retain age resulting from the percentages inserted in Clauses 5.1.6.1 and 51.6.2 above, and this is not explained elsewhere in the Contract Documents,insert here provisions for such reduction or limitation.) 0 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, O 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/19/2002.AIA License Number 1008538,which expires on 3/30/2003. 3 CAG-02-072 '411w vftmor 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when: THIS DOCUMENT HAS IMPORTANT LEGAL .1 the Contractor has fully performed the Contract except for the Contractor's CONSEQUENCES.CONSULTATION WITH responsibility to correct Work as provided in Subparagraph 12.2.2 of AIA Document ATTORNEY IS ENCOURAGED WITH A2o1-1997, and to satisfy other requirements, if any, which extend beyond final RESPECT TO ITS COMPLETION OR payment;and MODIFICATION.AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA .2 a final Certificate for Payment has been issued by the Architect Owner. DOCUMENT D401. 5.2.2 The Owner's final payment to the Contractor shall be made no later than 3o days after AIA Document A201-1997,General the issuance of the Architect's. Owner's final Certificate for Payment,or as follows: Conditions of the Contract for Construction,is adopted in this document by reference.Do not use ARTICLE 6 TERMINATION OR SUSPENSION this other general conditions unless this document is 6.1 The Contract may be terminated by the Owner or the Contractor as provided in modified. Article 14 of AIA Document A2o1-1997. This document has been approved and 6.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document endorsed by The Associated General A2o1-1997. Contractors of America. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of AIA Document A2o1-1997 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon,if any.) Usury laws and requirements under the Federal Truth in Lending Act,similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business,the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) r111•11 7.3 The Owner's representative is: (Name,address and other information) yl� City of Renton Tracy Coleman ... .- 1055 South Grady Way mormi 5th Floor Renton. Washington 98055 M997 A1A® AIA DOCUMENT A101-1997 7.4 The Contractor's representative is: OWNER-CONTRACTOR AGREEMENT (Name,address and other information) CHG Building Systems. Inc. The American Institute of Architects Ryan Grouws. VP/Estimator 1735 New York Avenue,N.W. y Washington,D.C.20006-5292 1120 SW 16th, Suite 4 Renton, Washington 98055 425-255-5747 t 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, O 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/19/2002.AIA License Number 1008538,which expires on 3/30/2003. 4 'New *Ho CAG-02-072 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. 7.6 Other provisions: The Contractor shall supply the Owner with four(4) sets of metal building shop drawings on or before July 19, 2002. ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS 8.1 The Contract Documents, except for Modifications issued after execution of this THIS DOCUMENT HAS IMPORTANT LEGAL Agreement,are enumerated as follows: CONSEQUENCES.CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement RESPECT TO ITS COMPLETION OR MODIFICATION.AUTHENTICATION OF Between Owner and Contractor,AIA Document Aioi-1997. THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the DOCUMENT 0401. Contract for Construction,AIA Document A2o1-1997. AIA Document A201-1997,General 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the-Conditions of the Contras for Project Manual dated ,and arc as follows: exhibits attached, and are as follows: Construction,is adopted in this document by reference.Do not use with other Document Title Pages general conditions unless this document is modified. Exhibit A Insurance Requirements 1 This document has been approved and endorsed by The Associated General 8.1.4 The Specifications are those contained in the Project Manual dated as in Contractors of America. Subparagraph 8.1.3,and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Pages Exhibit B Section 13121, Pre-Engineered Buildings 13121-1 to 13121-5 Exhibit C Additional Requirements 2 8.1.5 The Drawings are as follows,and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date C1 Drainage Plan 04/24/02 Al Site Plan 01/30/02 A2 Floor Plan 01/30/02 A3 Elevations 01/30/02 I_ S1 Foundation Plan 08/09/00 Sections& Structural Notes !'4 ' 8.1.6 The Addenda,if any,are as follows: mom Number Date Pages 01997 AIA® AIA DOCUMENT A101-1997 OWNER-CONTRACTOR AGREEMENT Portions of Addenda relating to bidding requirements are not part of the Contract Documents The American Institute of Architects unless the bidding requirements are also enumerated in this Article 8. 1735 New York Avenue,N.W. Washington,D.C.20006-5292 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, ® 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/19/2002.AIA License Number 1008538,which expires on 3/30/2003. 5 • CAG-02-072 441400 ',awe 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. 7.6 Other provisions: The Contractor shall supply the Owner with four(4) sets of metal building shop drawings on or before July 19, 2002. ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS 8.1 The Contract Documents, except for Modifications issued after execution of this THIS DOCUMENT HAS IMPORTANT LEGAL Agreement,are enumerated as follows: CONSEQUENCES.CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement RESPECT TO ITS COMPLETION OR MODIFICATION.AUTHENTICATION OF Between Owner and Contractor,AIA Document Aim-1997. THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the DOCUMENT 0401. Contract for Construction,AIA Document A2o1-1997. AIA Document A201-1997,General 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the-Conditions of the Contract for Construction,is adopted in this document Project Manual dated ,and are as follows: exhibits attached, and are as follows: by reference.Do not use with other Document Title Pages general conditions unless this document is modified. Exhibit A Insurance Requirements 1 This document has been approved and endorsed by The Associated General 8.1.4 The Specifications are those contained in the Project Manual dated as in Contractors of America. Subparagraph 8.1.3,and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Pages Exhibit B Section 13121, Pre-Engineered Buildings 13121-1 to 13121-5 Exhibit C Additional Requirements 2 8.1.5 The Drawings are as follows,and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date Cl Drainage Plan 04/24/02 Al Site Plan 01/30/02 A2 Floor Plan 01/30/02 A3 Elevations 01/30/02 Si Foundation Plan 08/09/0 '.' Sections & Structural Notes ' 8.1.6 The Addenda,if any,are as follows: Number Date Pages 01997 AIA® �n/ �j. AIA DOCUMENT A101-1997 Addendum#1 IW` June 27, 2002 1 OWNER-CONTRACTOR AGREEMENT Portions of Addenda relating to bidding requirements are not part of the Contract Documents The American Institute of Architects unless the bidding requirements are also enumerated in this Article 8. 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, © 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/28/2002.AIA License Number 1008538,which expires on 3/30/2003. 5 CAG-02-072 vire Now 8.1.7 Other documents,if any,forming part of the Contract Documents are as follows: (List here any additional documents that are intended to form part of the Contract Documents.AIA Document A201- 1997 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders,sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) N/A This Agreement is entered into as of the day and year first written above and is executed in at least three original copies, of which one is to be delivered to the Contractor, ene-te-he- - . • • -- .. - ,and the remainder to the Owner. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES.CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH OWNER (Signature) CO TRACTOR (Signature) RESPECT TO ITS COMPLETION OR g MODIFICATION.AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA Toni Nelsotl1Mayor Pro Tem DOCUMENT MAY BE MADE BY USING AIA Charles Grouws, President DOCUMENT D401. (printed name and tide) 4711 /V oo L rioted n. d title) AIA Document A201-1997,General . VlA %�''✓n- si.nature si.nature Conditions of the Contract for Construction,is adopted in this document Attest: Michele Neumann, Deputy City Clerk Ryan Gr. ws. Project Manager by reference.Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. M .,Sr 01997 AIA® AIA DOCUMENT A101-1997 OWNER-CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue,N.W. Washington,D.C.20006-5292 0 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: chg aia contract.aia -- 6/19/2002.AIA License Number 1008538,which expires on 3/30/2003. 6 v CAG-02-072 o) o> 1 §§N§yg § §§§ g §1 cL CC Q H H yf aq W H N H Z Z N N Q m §§§Z § "§ CaN §§§ § 1§ N •A H• HfNA Boa 0 n N co N 2 C §§§ § ?y $ g$g g7 N * • c• N N VC 7 O • I 1" p O O O O g N▪ C HHN H• p� M N W p 0-i §g E • H N fA all— _ � n o �� § ��� $§ c-0- .� °p n � p8 p p °°C V E C y3 c E 38 ; ita3 H q O 0 1.0 = _ O S . 01 d = U c H d N W m 0 §§ 51 0 0 8 § a gig 11 o §c 3 s g H a 44 H HH NH N H L. .N = V A 5�S2 5� 5� ffi N 2Q5 5Z�S§g § c�i�t� Q Q i• i• N LI 3x N I4 N 0 81• N 0 CL 0 an N pppp 88 pppp § 8 8 u CO 088008 § �i`-� Q0Q Q0Q C-c. •N 7.1r H N H H N N o Ca C §fA§§ § § ii ..q. M N N 4* N N c... N O m .0 _ E A' ? o 3 a ?. E a E Z _ fn 5 O. a ft � g _� � aJ w cc - -° a° cU ° 5 oY E off° xeg a° a 1 g z as a° a „ w„ CAG-02-072 EXHIBIT "B” SECTION 13121 PRE-ENGINEERED BUILDINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pre-engineered,shop-fabricated structural steel building frame. B. Insulated Metal wall and roof panels including soffits. C. Exterior doors, overhead doors, and louvers. 1.02 REFERENCES A. AISC S335-Specification for Structural Steel Buildings—Allowable Stress Design, Plastic - Design; American Institute of Steel Construction, Inc.; 1989. B. ASTM A 153/A 153M-Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware;2000. C. ASTM A 307-Standard Specification for Carbon Steel Bolts and Studs,60 000 PSI Tensile Strength; 2000. D. ASTM A 325-Standard Specification for Structural Bolts,Steel, Heat Treated, 1201105 ksi Minimum Tensile Strength; 2000. E. ASTM A 500 -Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes; 1999. F. ASTM A 501 -Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing;1999. G. ASTM A 529/A 529M-Standard Specification for High-Strength Carbon-Manganese Steel of Structural Quality;2000. H. ASTM A 653/A 653M-Standard Specification for Steel Sheet,Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process;2000. I. ASTM C 665-Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing; 1998. J. ASTM C 1107-Standard Specification for Packaged Dry, Hydraulic-Cement Grout(Nonshrink); 1999. K. AWS A2.4-Standard Symbols for Welding, Brazing,and Nondestructive Examination; American Welding Society; 1998. L. AWS D1.1 -Structural Welding Code-Steel;American Welding Society;2000. M. MBMA(LR)-Low Rise Building Systems Manual;Metal Building Manufacturers Association; 1996,with Rev 1 (4/97). N. SSPC-Paint 20-Zinc-Rich Primers(Type I,"Inorganic,"and Type II,"Organic"); Society for Protective Coatings; 1982 (Ed. 2000). O. UL 580 - Standard for Tests for Uplift Resistance of Roof Assemblies;Underwriters Laboratories Inc.; 1994. 1.03 DESIGN REQUIREMENTS A. Installed Thermal Resistance of Wall System: R value of 13. Insulation 4"thick. 20114 1 Police Evidence Vehicle Storage 13121 - 1 PRE-ENGINEERED BUILDINGS '..✓ N CAG-02-072 B. Installed Thermal Resistance of Roof System: R value of 19.Insulation 6"thick. C. Design members to withstand 25 psf live load and 80 MPH exposure "C"wind load. D. Design members to withstand UL 580 Uplift Class 90. E. Exterior wall and roof system shall withstand imposed loads with maximum allowable deflection of 1/180 of span.Walls 1/90. F. Permit movement of components without buckling, failure of joint seals, undue stress on fasteners or other detrimental effects,when subject to temperature range of 90 degrees F. G. Size and fabricate wall and roof systems free of distortion or defects detrimental to appearance or performance. 1.04 SUBMITTALS A. See Section 01300-Administrative Requirements,for submittal procedures. B. Product Data: Provide data on profiles, component dimensions,fasteners. C. Shop Drawings: Indicate assembly dimensions, locations of structural members,connections; wall and roof system dimensions,panel layout, general construction details, anchorages and method of anchorage, installation, and braced frame-locations; framing anchor bolt settings, sizes,and locations from datum,foundation loads; indicate welded connections with AWS A2.4 welding symbols;indicate net weld lengths; provide professional seal and signature. Provide design calculations with State of Washington structural engineer's stamp. D. Samples: Submit two samples of precoated metal panels for each color selected,6x6 inch in size illustrating color and texture of finish. E. Manufacturer's Instructions: Indicate preparation requirements, anchor bolt placement. F. Erection Drawings: Indicate members by label,assembly sequence, and temporary erection bracing. 1.05 QUALITY ASSURANCE A. Design structural components,develop shop drawings, and perform shop and site work under direct supervision of a Professional Structural Engineer experienced in design of this Work and licensed in the State of Washington. 1. Conform to applicable code for submission of design calculations as required for acquiring permits. 2. Cooperate with regulatory agency or authority and provide data as requested. B. Perform work in accordance with AISC "Specification for Structural Steel Buildings—Allowable Stress Design, Plastic Design". C. Perform welding in accordance with AWS D1.1. D. Manufacturer Qualifications: Company specializing in manufacturing the Products specified in this section with minimum 10 years documented experience. E. Erector Qualifications: Company specializing in performing the work of this section with minimum 10 years experience. 1.06 WARRANTY A. See Section 01780-Closeout Submittals,for additional warranty requirements. B. Correct defective Work within a one year period after Date of Substantial Completion. C. Provide 35 year manufacturer warranty for roof and wall paint. 20114/Police Evidence Vehicle Storage 13121 -2 PRE-ENGINEERED BUILDINGS CAG-02-072 low -,400 PART 2 PRODUCTS 2.01 MANUFACTURERS A. Pre-Engineered Buildings: 1. CBC; Product Steel Buildings. 2. Substitutions: Substitutions shall comply with the requirements of this section.See Section 01600-Product Requirements. 2.02 PRE-ENGINEERED BUILDING A. Single span rigid frame. B. Bay Spacing: 30 ft. C. Primary Framing: Rigid frame of rafter beams and columns, canopy beams, and wind bracing. D. Secondary Framing: Purlins, and other items detailed. E. Wall System: Preformed metal panels of vertical profile,with sub-girt framing/anchorage assembly, and accessory components.Wall girts @ 4'-0"O.C.Maximum. F. Roof System: Preformed metal panels oriented parallel to slope,with sub-girt framing/anchorage assembly, insulation, and liner panels,and accessory components. G. Roof Slope: 1 inches in 12 inches. 2.03 MATERIALS -FRAMING A. Structural Steel Members: ASTM A 572/A 572M, Grade 50. B. Structural Tubing: ASTM A 500,Grade B cold-formed. C. Plate or Bar Stock: ASTM A 529/A 529M. D. Anchor Bolts: ASTM A 307, galvanized to ASTM A 153/A 153M. E. Bolts, Nuts, and Washers: ASTM A 325 (ASTM A 325M),galvanized to ASTM A 153/A 153M. F. Welding Materials: Type required for materials being welded. G. Primer: SSPC-Paint 20,Red Oxide. 2.04 MATERIALS -WALLS AND ROOF A. Steel Sheet:Zincalume Coated. B. Insulation: ASTM C 665 Type I;6 inches thick at roof and 4 inches thick at walls.TIMA Striped. 1. Facing: Sheet vinyl,.x inch thick,white. C. Insulation facing: HD VRP facing w/double seal tabs and white PVC retaining strips. D. Joint Seal Gaskets: Manufacturer's standard type. E. Fasteners: Manufacturer's standard type,galvanized to comply with requirements of ASTM A 153/A 153M, finish to match adjacent surfaces when exterior exposed. F. Sealant: Manufacturer's standard. G. Trim, Closure Pieces, Caps, Flashings, Facias: Same material,thickness and finish as exterior sheets; brake formed to required profiles. 2.05 COMPONENTS A. Doors and Frames: Commercial grade 18 gauge insulated galavaized metal walk-in doors with 16 ga. frames, 16 ga.sub-jambs,commercial lever locksets, deadbolt locks,stainless steel ball 20114/Police Evidence Vehicle Storage 13121 -3 PRE-ENGINEERED BUILDINGS __ CAG-02-072 bearing hinges,heavy duty closers,threshold,weather stripping and factory prime paint. B. Overhead Doors and Frames: Insulated sectional overhead doors with full perimeter weather seal, full vertical lift two inch track(except at main doors under exhaust fans where doors to be horizontal lift) heavy duty manual lift hardware and factory primed paint. C. Fan: US electric fan Model USDC42J-42" belt drive propeller wall exhaust fan. Capacity of 13,834 CFM @ 1/4"SP and 485 RPM. Fitted with a 1 HP 460/3/60 TEAO motor,six bladded steel propeller and an epoxy finish. Provide WC42DC wall collar and WAG46 shutter/damper. D. Duct:Custom fabricated 20 gauge steel.Connect to US fan shutter mounted wall collar to 6'-0" X 6'-0"wall louver.Wall collar flange will be positioned 24"back of the wall louver. Ducting is not load bearing, fan to be supported by purlins above. E. Control Damper: Model AC41 72"X 72"parallel blade control damper.Construct in two 36"X 72"sections with 16 gauge galvanized steel and channel frame. ML-415 operator jack shafting and spring return. F. Wall Louvers: Storm proof type Z blade design,same finish as adjacent material,with#2 steel mesh 19 gauge bird screen, blank sheet metal at unused portions.Louvers to be 6'-O"X 6'-0"X 4"deep,Model FG-4004-MB stationary blade louvers.Fabricate louvers of 18 gauge galvanized steel fitted with metal building flanges. Custom color backed enamel finish to match building. 2.06 FABRICATION -FRAMING A. Fabricate members in accordance with AISC Specification for plate, bar,tube, or roiled structural shapes. B. Anchor Bolts: Formed with bent shank, assembled with template for casting into concrete. 2.07 FABRICATION -WALL AND ROOF PANELS A. Siding: Minimum 26 Ga. metal thickness,with manufacturers standard profile, 1 1/2 inch deep, lapped edges. B. Roofing: Minimum 26 Ga. metal thickness,with manufacturers standard profile, lapped edges. C. Girts/Purlins: Rolled formed structural shape to receive siding, roofing sheet. D. Internal and External Corners: Same material thickness and finish as adjacent material, profile brake formed to required angles. Back brace mitered internal corners with 26 Ga.thick sheet. E. Flashings, Closure Pieces,Fascia,Infills, and Caps: Same material and finish as adjacent material, profile to suit system. F. Fasteners: To maintain load requirements and weather tight installation, same finish as cladding, non-corrosive type. 2.08 FABRICATION -GUTTERS AND DOWNSPOUTS A. Form gutters and downspouts of 24 Ga. profile and size to collect and remove water. Fabricate with connection pieces. Provide six downspout, 1 at each corner and one in the center of each side of the building. B. Form sections in maximum possible lengths. Hem exposed edges. C. Fabricate support straps of same material and finish as roofing metal, color as selected. 2.09 FINISHES A. Framing Members: Clean, prepare, and shop prime. Do not prime surfaces to be field welded. B. Exterior Surfaces of Wall Components and Accessories: Precoated enamel on steel of 20114/Police Evidence Vehicle Storage 13121 -4 PRE-ENGINEERED BUILDINGS CAG-02-072 vow Igo modified silicone finish, color as selected from manufacturer's standard range. C. Interior Surfaces of Wall Components and Accessories: Precoated enamel on steel of modified silicone finish,white color. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that foundation,floor slab, mechanical and electrical utilities, and placed anchors are in correct position 3.02 ERECTION -FRAMING A. Erect framing in accordance with AISC Specification for Structural Steel Buildings. B. Provide for erection and wind loads. Provide temporary bracing to maintain structure plumb and in alignment until completion of erection and installation of permanent bracing. Locate braced bays as indicated. C. Do not field cut or alter structural members without approval. D. After erection, prime welds, abrasions, and surfaces not shop primed. 3.03 ERECTION -WALL AND ROOF PANELS A. Install in accordance with manufacturer's instructions. B. Exercise care when cutting prefinished material to ensure cuttings do not remain on finish surface. C. Fasten cladding system to structural supports,aligned level and plumb. D. Locate end laps over supports. End laps minimum 2 inches. Place side laps over bearing. E. Provide expansion joints where indicated. F. Install sealant and gaskets to prevent weather penetration. 3.04 ERECTION-GUTTERS AND DOWNSPOUTS A. Rigidly support and secure components. Join lengths with formed seams sealed watertight. Flash and seal gutters to downspouts. B. Connect downspouts to tight line storm sewer system. 3.05 INSTALLATION -ACCESSORIES A. Install door frames, doors, and overhead doors in accordance with manufacturer's instructions. 3.06 TOLERANCES A. Framing Members: 1/8 inch from level; 1/8 inch from plumb. B. Siding and Roofing: 1/8 inch from true position. END OF SECTION 20114/Police Evidence Vehicle Storage 13121 -5 PRE-ENGINEERED BUILDINGS • CAG-02-072 ` EXHIBIT "C" City of Renton New CBC Steel Building for Police Evidence Additional Requirements 1. Size One CBC steel building, 110 feet in width by 90 feet in length with an eave height of 18 feet. The roof will have an 1:12 pitch. There will be three 30- foot bays. 2. Design Loads 25 PSF live load 3 PSF mechanical load 80 MPH exposure "C" wind load 3. Special Framing The main frames will be clear-span with no interior center columns. End wall frames will be standard post and beam design. There will be standard "X" bracing in one bay of each sidewall to resist wind loads. Sidewall girt spacing will be 4 foot on center nominal. Main frames will be shop prime painted. Secondary framing may be shop prime painted or galvanized. 4. Insulation Insulation to be TIMA striped UL rated fiberglass blanket with a heavy duty reinforced vinyl (VRP) facing. The insulation side laps are to be held with double seal tabs and white PVC strips to complete the vapor barrier. Roof— R-19 (6") Walls — R-13 (4") 5. Roof Sheeting Roof sheeting to be CBC's Delta Line design 26 gauge "Zincalume" coated steel with a baked-on "Kynar 500" white finish coating. Roof sheeting to carry a full "Thirty-five Year Paint Finish Warranty." 6. Wall Sheeting Wall sheeting to be CBC's Delta Line design 26 gauge "Zincalume" coated steel with a baked-on "Kynar 500" standard color finish coating. Wall fasteners to be color matched to sheeting. Wall sheeting to carry a full "Thirty-five Year Paint Finish Warranty." 7. Walk-In Doors Two 3070 commercial grade 18 gauge insulated galvanized metal walk-in doors with 16 gauge frames, 16 gauge sub-jambs, commercial lever lockset, deadbolt locks, stainless steel ball-bearing hinges, heavy duty closer, threshold, weather stripping and factory prime paint finish. 2002-105aa • CAG-02-072 wrre 8. Overhead Doors Two 12' X 10' and two 8' X 10' insulated sectional overhead doors with full perimeter weather seal, high lift two-inch track, heavy duty manual lift hardware, and factory prime paint finish. 9. Gutters, Downspouts, and Trim One hundred eighty lineal feet of Deluxe large-capacity 24 gauge gutter with six downspouts. Deluxe gable end trim to match gutter for special finished appearance. 10. Anchor Bolts Contractor to supply all required anchor bolts for attaching structural steel. Anchor bolts to be placed and set by others. Contractor will inspect placement of anchor bolts for accuracy. 11. Erection Service Contractor to provide all required equipment, machinery, supervision and prevailing wage manpower to erect the CBC steel building and accessories listed above. 12. Drawings Contractor to supply complete steel structural drawings including calculations, anchor bolt layout and details; all stamped by a registered Washington State Engineer. 2002-105aa