Loading...
HomeMy WebLinkAboutT-3430105V 0 3 0 S2 a „IMF Pg4tEl r -F'I USA MINI -MART v J J 1 r G — i _ �I - -', / UGP UGP_ - 177' 0 u I -� B1 1 1 1 1 1 1 HG 4"- s - - - — Ss&,__I Gr _ - - -- - - - - -- ------ - - - - -- - - �_ - -- -- - -- B - -- — CO__ 5 to r— W r I 24 5 w L, >\ s� ,A 13 14 LO .,A _ 1� -- — — - -� I— 15 i -- — I— RAINIER AVE S I ) UJ II \ --------------------------------------------- I!il Q j \ - - -- ....... UGP UGPs.UGP� 1tJGP - -t 1 1 I 1 1 1 1 VAULT SCHEDULE PLAN 0 5 10 20 40 60 SCALE IN FEET ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT P3 THREE PHASE J -BOX J06 PSE PSE CONTRACTOR 1p,3p 5p,6p,1 -4" Q3 264 TA #915 CENTURYLNK CENTURYLINK CONTRACTOR 2q,3q 4q,5q,1 -4" C39 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 3c,4c 5c,6c,1 -3" P31 INTERCEPT POINT IP01 PSE ----------------------------- CONTRACTOR 1 -4" - Q4 264 TA #914 CENTURYLINK CENTURYLINK CONTRACTOR - 1 -4" P57 REMOVE VAULT J05 PSE - CONTRACTOR - - P58 REMOVE VAULT J07 PSE - CONTRACTOR SOUND FORD - I VAULT SCHEDULE PLAN 0 5 10 20 40 60 SCALE IN FEET ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT P3 THREE PHASE J -BOX J06 PSE PSE CONTRACTOR 1p,3p 5p,6p,1 -4" Q3 264 TA #915 CENTURYLNK CENTURYLINK CONTRACTOR 2q,3q 4q,5q,1 -4" C39 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 3c,4c 5c,6c,1 -3" P31 INTERCEPT POINT IP01 PSE - CONTRACTOR 1 -4" - Q4 264 TA #914 CENTURYLINK CENTURYLINK CONTRACTOR - 1 -4" P57 REMOVE VAULT J05 PSE - CONTRACTOR - - P58 REMOVE VAULT J07 PSE - CONTRACTOR - - CALL 2 DAYS BEFORE YOU DIG 1- 800 -424 -5555 <. _. CONSTRUCTION NOTES GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. 2Q 4" DIAMETER CONDUIT - CENTURYLINK (1 CONDUIT) 24 BEGIN INSTALLATION OF 10" DIAMETER CONDUIT -PSE GAS - APPROXIMATE STA 12 +20, LT JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. T- 3430105 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 8 EXISTING CONDITIONS 56 SITE PREPARATION & TESC PLAN 70 ALIGNMENT PLAN 82 ALIGNMENT PROFILE 94 DRAINAGE PLANS 105 DRAINAGE PROFILE 114,115 WATER PLAN 133 WATER PROFILE 147 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 181 PROPERTY RESTORATION PLANS 196 CHANNELIZATION & SIGNING PLAN 218 ILLUMINATION PLANS 229 IRRIGATION PLAN 283 LANDSCAPE PLAN 295 11 -14-11 SURVEYED: KPG OS4'4X G- AAy0�9 DRAWN BY: SOD Kp� i3 '� CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 165 1 _ 02✓ DESIGN BY: SOD 7539th Avenue 2502 Jefferson Avenue BID wu Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 H CHECKBY: JLF Sealde,WA98109 TaoOma,WA9MU DOCUMENTS FED AID NO. - CM0167(048) 'd+ 26320 ma APPROVE FOR CONSTRUCTION JOINT UTILITY TRENCH PLAN A 1p ,srE 1t'�' PROJ MGR: JF (���0 (253)627 -0720 DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE NAL FILE: 0655DJUTOt.dwg BY: DATE://Atl/Z STA 12 +00 TO STA 15 +50 SHEET NO. 165 OF 304 z m a a n m a O ro� 6" U� w .p o W N O