HomeMy WebLinkAboutT-3430105V
0
3
0
S2
a
„IMF Pg4tEl
r -F'I
USA MINI -MART
v J
J 1
r
G —
i _
�I -
-', / UGP UGP_ -
177' 0
u I
-� B1
1
1
1
1
1
1
HG 4"- s - - -
— Ss&,__I Gr _ - - -- - - - - -- ------ - - - - -- - -
�_ - -- -- - -- B - -- —
CO__
5
to r— W
r I 24 5
w L, >\ s�
,A 13 14
LO
.,A _ 1� -- — — - -� I— 15 i
-- — I—
RAINIER AVE S I )
UJ II
\ ---------------------------------------------
I!il Q
j \ - - -- .......
UGP UGPs.UGP� 1tJGP
- -t
1
1
I 1
1
1
1
VAULT SCHEDULE
PLAN
0 5 10 20 40 60
SCALE IN FEET
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN /FROM LEFT
CONDUIT OUT /TO RIGHT
P3
THREE PHASE J -BOX
J06
PSE
PSE
CONTRACTOR
1p,3p
5p,6p,1 -4"
Q3
264 TA
#915
CENTURYLNK
CENTURYLINK
CONTRACTOR
2q,3q
4q,5q,1 -4"
C39
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
3c,4c
5c,6c,1 -3"
P31
INTERCEPT POINT
IP01
PSE
-----------------------------
CONTRACTOR
1 -4"
-
Q4
264 TA
#914
CENTURYLINK
CENTURYLINK
CONTRACTOR
-
1 -4"
P57
REMOVE VAULT
J05
PSE
-
CONTRACTOR
-
-
P58
REMOVE VAULT
J07
PSE
-
CONTRACTOR
SOUND FORD
-
I
VAULT SCHEDULE
PLAN
0 5 10 20 40 60
SCALE IN FEET
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN /FROM LEFT
CONDUIT OUT /TO RIGHT
P3
THREE PHASE J -BOX
J06
PSE
PSE
CONTRACTOR
1p,3p
5p,6p,1 -4"
Q3
264 TA
#915
CENTURYLNK
CENTURYLINK
CONTRACTOR
2q,3q
4q,5q,1 -4"
C39
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
3c,4c
5c,6c,1 -3"
P31
INTERCEPT POINT
IP01
PSE
-
CONTRACTOR
1 -4"
-
Q4
264 TA
#914
CENTURYLINK
CENTURYLINK
CONTRACTOR
-
1 -4"
P57
REMOVE VAULT
J05
PSE
-
CONTRACTOR
-
-
P58
REMOVE VAULT
J07
PSE
-
CONTRACTOR
-
-
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
<. _.
CONSTRUCTION NOTES
GENERAL JOINT UTILITY TRENCH PLAN NOTES
1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
GAS, COMCAST, AND CENTURYLINK.
2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
FRANCHISE UTILITIES.
3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
THE CITY OF RENTON.
5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
FOR THEIR CONVERSION.
6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS.
8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
2Q 4" DIAMETER CONDUIT - CENTURYLINK (1 CONDUIT)
24 BEGIN INSTALLATION OF 10" DIAMETER CONDUIT -PSE GAS - APPROXIMATE STA 12 +20, LT
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
T- 3430105
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
8
EXISTING CONDITIONS
56
SITE PREPARATION & TESC PLAN
70
ALIGNMENT PLAN
82
ALIGNMENT PROFILE
94
DRAINAGE PLANS
105
DRAINAGE PROFILE
114,115
WATER PLAN
133
WATER PROFILE
147
JOINT UTILITY TRENCH PLAN
-
JOINT UTILITY TRENCH PROFILES
181
PROPERTY RESTORATION PLANS
196
CHANNELIZATION & SIGNING PLAN
218
ILLUMINATION PLANS
229
IRRIGATION PLAN
283
LANDSCAPE PLAN
295
11 -14-11 SURVEYED: KPG
OS4'4X G- AAy0�9 DRAWN BY: SOD Kp� i3 '� CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 165
1 _ 02✓ DESIGN BY: SOD 7539th Avenue 2502 Jefferson Avenue BID wu Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
H CHECKBY: JLF Sealde,WA98109 TaoOma,WA9MU DOCUMENTS FED AID NO. - CM0167(048)
'd+ 26320 ma APPROVE FOR CONSTRUCTION JOINT UTILITY TRENCH PLAN
A 1p ,srE 1t'�' PROJ MGR: JF (���0 (253)627 -0720 DATE: NOV 2011
NUMBER REVISION DESCRIPTION BY APP. DATE NAL FILE: 0655DJUTOt.dwg BY: DATE://Atl/Z STA 12 +00 TO STA 15 +50 SHEET NO. 165 OF 304