HomeMy WebLinkAboutT-34301067
0
3
w
i
a
Y
N 1 1
1
0 1 11
,n 1
Q
V -
cP _ -
W
J I 1
v 1 I
1
Ili L
.10
c.
'E, h
r� A
i
i
C2 - - --
SEATTLE SUPER
SUPPLEMENT
uGP— uGP— u - — UGPQ= UDC— -�� VLF I.
IGP UGP - -
- -- _ - -
- -- — U13_ =�` UG UGP _
P 7j, � UGP i; _.C1 - -- -
- -- G
_ _ Pte.
J�� - --� �_
y _ PT = 749 +78.86
— — —
VE S
1 _
2 1 77- --
1
1 1 UGP UGP UGP
— UGP
L - - - UGP _
UGP _ .. -� F �
X31 {— UGP— :)
UGP
w
UiO
— V
—UGP -UG - =UGP UGP
_LGP U6P
r J- i�iP -'��" =-•tea¢ — _
- - - - - - - - - - - - - - - -
--- -_ - --- I -\ /J - - - - -- I
- /, --- -
/� A SOUND FORD
GENERAL JOINT UTILITY TRENCH PLAN NOTES
1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
GAS, COMCAST, AND CENTURYLINK. UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
FRANCHISE UTILITIES. STRUCTURES NO LONGER IN USE.
3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
CONVERSION. DESIGN.
4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
THE CITY OF RENTON.
5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
FOR THEIR CONVERSION.
6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT —OF —WAY TO EXISTING PRIVATE METERS.
/ - - --
5 �1
WALKER'S RENTON SUBARU P5
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
VAULT SCHEDULE
c
Gl
r
�oP
w
0
0
0
_= N
ti
L
J
U
I ;II
0 5 10 20 40 60
SCALE IN FEET
CONSTRUCTION NOTES
Q2 4" DIAMETER CONDUIT — CENTURYLINK (1 CONDUIT)
Q7 3" DIAMETER CONDUIT— COMCAST (1 CONDUIT)
A4" DIAMETER CONDUIT —PSE POWER (1 CONDUIT)
ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT CONDUIT OUT /TO
UTILITY ID IN /FROM LEFT RIGHT
P4 THREE PHASE J —BOX J08 PSE PSE CONTRACTOR 5p,6p 7p,8p,9p,1Op
C3 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 5c,6c 7c,8c
P5 5106 DEEP VAULT VO4 PSE PSE CONTRACTOR — 11p
Q5 264 TA #917 CENTURYLINK CENTURYLINK CONTRACTOR — 11q
C4 17 "x30" — COMCAST COMCAST CONTRACTOR 1 -3" —
P32 INTERCEPT POINT IP03 PSE — CONTRACTOR 1 -4" —
P33 INTERCEPT POINT IP02 PSE — CONTRACTOR 2p,4p —
P59 REMOVE VAULT V02 PSE — CONTRACTOR — —
P60 REMOVE VAULT J09 PSE — CONTRACTOR — —
P61 REMOVE VAULT V05 PSE — CONTRACTOR — —
T- 3430106
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
CORRESPONDING SHEETS
CATEGORY SHEET
RIGHT OF WAY PLANS 9
EXISTING CONDITIONS 57
SITE PREPARATION & TESC PLAN 71
ALIGNMENT PLAN 83
ALIGNMENT PROFILE 95
DRAINAGE PLANS 106
DRAINAGE PROFILE 115,116
WATER PLAN 134
WATER PROFILE 148
JOINT UTILITY TRENCH PLAN —
JOINT UTILITY TRENCH PROFILES 182
PROPERTY RESTORATION PLANS 197
CHANNELIZATION & SIGNING PLAN 219
ILLUMINATION PLANS 230
IRRIGATION PLAN 284
LANDSCAPE PLAN 296
t1 -1441 SURVEYED: KPG CITY OF RENTON
1ostieXGAA I °s " DRAWN BY: SOD �� c } RAINIER AVENUES (SR ST DRAWING NO. 166
R S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
off` DESIGN BY: SOD 7539thpvenueN 2502 Jefferson Avenue BID Public Works Department FEDAIDNO. - CM0167(048)
h CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN
�STE6 Fqa (206)286 -1640 (253)627 -0720 APP FOR CONSTRUCTION DATE: NOV 2011
�� PROJ MGR: JF
NUMBER REVISION DESCRIPTION BY APP. DATE'voNnt FILE: 0655DJUT01.dwg vMlY kpg Oxn BY: DATE:j �/L STA 15 +50 TO STA 20 +00 SHEET NO. 166 OF 304
a
z
�y
N O
-n
c >
<
0
a
o w
N O
- /, --- -
/� A SOUND FORD
GENERAL JOINT UTILITY TRENCH PLAN NOTES
1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
GAS, COMCAST, AND CENTURYLINK. UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
FRANCHISE UTILITIES. STRUCTURES NO LONGER IN USE.
3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
CONVERSION. DESIGN.
4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
THE CITY OF RENTON.
5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
FOR THEIR CONVERSION.
6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT —OF —WAY TO EXISTING PRIVATE METERS.
/ - - --
5 �1
WALKER'S RENTON SUBARU P5
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
VAULT SCHEDULE
c
Gl
r
�oP
w
0
0
0
_= N
ti
L
J
U
I ;II
0 5 10 20 40 60
SCALE IN FEET
CONSTRUCTION NOTES
Q2 4" DIAMETER CONDUIT — CENTURYLINK (1 CONDUIT)
Q7 3" DIAMETER CONDUIT— COMCAST (1 CONDUIT)
A4" DIAMETER CONDUIT —PSE POWER (1 CONDUIT)
ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT CONDUIT OUT /TO
UTILITY ID IN /FROM LEFT RIGHT
P4 THREE PHASE J —BOX J08 PSE PSE CONTRACTOR 5p,6p 7p,8p,9p,1Op
C3 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 5c,6c 7c,8c
P5 5106 DEEP VAULT VO4 PSE PSE CONTRACTOR — 11p
Q5 264 TA #917 CENTURYLINK CENTURYLINK CONTRACTOR — 11q
C4 17 "x30" — COMCAST COMCAST CONTRACTOR 1 -3" —
P32 INTERCEPT POINT IP03 PSE — CONTRACTOR 1 -4" —
P33 INTERCEPT POINT IP02 PSE — CONTRACTOR 2p,4p —
P59 REMOVE VAULT V02 PSE — CONTRACTOR — —
P60 REMOVE VAULT J09 PSE — CONTRACTOR — —
P61 REMOVE VAULT V05 PSE — CONTRACTOR — —
T- 3430106
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
CORRESPONDING SHEETS
CATEGORY SHEET
RIGHT OF WAY PLANS 9
EXISTING CONDITIONS 57
SITE PREPARATION & TESC PLAN 71
ALIGNMENT PLAN 83
ALIGNMENT PROFILE 95
DRAINAGE PLANS 106
DRAINAGE PROFILE 115,116
WATER PLAN 134
WATER PROFILE 148
JOINT UTILITY TRENCH PLAN —
JOINT UTILITY TRENCH PROFILES 182
PROPERTY RESTORATION PLANS 197
CHANNELIZATION & SIGNING PLAN 219
ILLUMINATION PLANS 230
IRRIGATION PLAN 284
LANDSCAPE PLAN 296
t1 -1441 SURVEYED: KPG CITY OF RENTON
1ostieXGAA I °s " DRAWN BY: SOD �� c } RAINIER AVENUES (SR ST DRAWING NO. 166
R S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
off` DESIGN BY: SOD 7539thpvenueN 2502 Jefferson Avenue BID Public Works Department FEDAIDNO. - CM0167(048)
h CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN
�STE6 Fqa (206)286 -1640 (253)627 -0720 APP FOR CONSTRUCTION DATE: NOV 2011
�� PROJ MGR: JF
NUMBER REVISION DESCRIPTION BY APP. DATE'voNnt FILE: 0655DJUT01.dwg vMlY kpg Oxn BY: DATE:j �/L STA 15 +50 TO STA 20 +00 SHEET NO. 166 OF 304
a
z
�y
N O
-n
c >
<
0
a
o w
N O
/ - - --
5 �1
WALKER'S RENTON SUBARU P5
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
VAULT SCHEDULE
c
Gl
r
�oP
w
0
0
0
_= N
ti
L
J
U
I ;II
0 5 10 20 40 60
SCALE IN FEET
CONSTRUCTION NOTES
Q2 4" DIAMETER CONDUIT — CENTURYLINK (1 CONDUIT)
Q7 3" DIAMETER CONDUIT— COMCAST (1 CONDUIT)
A4" DIAMETER CONDUIT —PSE POWER (1 CONDUIT)
ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT CONDUIT OUT /TO
UTILITY ID IN /FROM LEFT RIGHT
P4 THREE PHASE J —BOX J08 PSE PSE CONTRACTOR 5p,6p 7p,8p,9p,1Op
C3 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 5c,6c 7c,8c
P5 5106 DEEP VAULT VO4 PSE PSE CONTRACTOR — 11p
Q5 264 TA #917 CENTURYLINK CENTURYLINK CONTRACTOR — 11q
C4 17 "x30" — COMCAST COMCAST CONTRACTOR 1 -3" —
P32 INTERCEPT POINT IP03 PSE — CONTRACTOR 1 -4" —
P33 INTERCEPT POINT IP02 PSE — CONTRACTOR 2p,4p —
P59 REMOVE VAULT V02 PSE — CONTRACTOR — —
P60 REMOVE VAULT J09 PSE — CONTRACTOR — —
P61 REMOVE VAULT V05 PSE — CONTRACTOR — —
T- 3430106
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
CORRESPONDING SHEETS
CATEGORY SHEET
RIGHT OF WAY PLANS 9
EXISTING CONDITIONS 57
SITE PREPARATION & TESC PLAN 71
ALIGNMENT PLAN 83
ALIGNMENT PROFILE 95
DRAINAGE PLANS 106
DRAINAGE PROFILE 115,116
WATER PLAN 134
WATER PROFILE 148
JOINT UTILITY TRENCH PLAN —
JOINT UTILITY TRENCH PROFILES 182
PROPERTY RESTORATION PLANS 197
CHANNELIZATION & SIGNING PLAN 219
ILLUMINATION PLANS 230
IRRIGATION PLAN 284
LANDSCAPE PLAN 296
t1 -1441 SURVEYED: KPG CITY OF RENTON
1ostieXGAA I °s " DRAWN BY: SOD �� c } RAINIER AVENUES (SR ST DRAWING NO. 166
R S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
off` DESIGN BY: SOD 7539thpvenueN 2502 Jefferson Avenue BID Public Works Department FEDAIDNO. - CM0167(048)
h CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN
�STE6 Fqa (206)286 -1640 (253)627 -0720 APP FOR CONSTRUCTION DATE: NOV 2011
�� PROJ MGR: JF
NUMBER REVISION DESCRIPTION BY APP. DATE'voNnt FILE: 0655DJUT01.dwg vMlY kpg Oxn BY: DATE:j �/L STA 15 +50 TO STA 20 +00 SHEET NO. 166 OF 304
a
z
�y
N O
-n
c >
<
0
a
o w
N O
T- 3430106
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
CORRESPONDING SHEETS
CATEGORY SHEET
RIGHT OF WAY PLANS 9
EXISTING CONDITIONS 57
SITE PREPARATION & TESC PLAN 71
ALIGNMENT PLAN 83
ALIGNMENT PROFILE 95
DRAINAGE PLANS 106
DRAINAGE PROFILE 115,116
WATER PLAN 134
WATER PROFILE 148
JOINT UTILITY TRENCH PLAN —
JOINT UTILITY TRENCH PROFILES 182
PROPERTY RESTORATION PLANS 197
CHANNELIZATION & SIGNING PLAN 219
ILLUMINATION PLANS 230
IRRIGATION PLAN 284
LANDSCAPE PLAN 296
t1 -1441 SURVEYED: KPG CITY OF RENTON
1ostieXGAA I °s " DRAWN BY: SOD �� c } RAINIER AVENUES (SR ST DRAWING NO. 166
R S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
off` DESIGN BY: SOD 7539thpvenueN 2502 Jefferson Avenue BID Public Works Department FEDAIDNO. - CM0167(048)
h CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN
�STE6 Fqa (206)286 -1640 (253)627 -0720 APP FOR CONSTRUCTION DATE: NOV 2011
�� PROJ MGR: JF
NUMBER REVISION DESCRIPTION BY APP. DATE'voNnt FILE: 0655DJUT01.dwg vMlY kpg Oxn BY: DATE:j �/L STA 15 +50 TO STA 20 +00 SHEET NO. 166 OF 304
a
z
�y
N O
-n
c >
<
0
a
o w
N O
t1 -1441 SURVEYED: KPG CITY OF RENTON
1ostieXGAA I °s " DRAWN BY: SOD �� c } RAINIER AVENUES (SR ST DRAWING NO. 166
R S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
off` DESIGN BY: SOD 7539thpvenueN 2502 Jefferson Avenue BID Public Works Department FEDAIDNO. - CM0167(048)
h CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN
�STE6 Fqa (206)286 -1640 (253)627 -0720 APP FOR CONSTRUCTION DATE: NOV 2011
�� PROJ MGR: JF
NUMBER REVISION DESCRIPTION BY APP. DATE'voNnt FILE: 0655DJUT01.dwg vMlY kpg Oxn BY: DATE:j �/L STA 15 +50 TO STA 20 +00 SHEET NO. 166 OF 304
a
z
�y
N O
-n
c >
<
0
a
o w
N O