Loading...
HomeMy WebLinkAboutT-3430107Y \ /J � �r l i Qs----- -- \V \ // cq �Nv \ 34 { \ k 34\ \' 1 VGG UGP / UGP / P � �G v JVQ \\ i - UGP �66P \\\ \ UGP GPI GCp_ 0 pro => D1 \< >= _y UGP i7r- -- —� R G = ------ - - - - -- v Iw C) I I A V A N- x.22, I- -29 - - - -- -_ - v - o RAINIER AVE S a I p2 III li D2 ----- - - - - -- 11 \ LES SCHWAB -- T �. D4 / J�Q GENERAL JOINT UTILITY TRENCH PLAN NOTES ve UGC o Q,1 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY / \ COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE PLAN THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE / FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE 0 5 10 20 40 60 GAS, COMCAST, AND CENTURYLINK. SCALE IN FEET 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY \\ JOINT UTILITY TRENCH LEGEND REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL � CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE \y\ FRANCHISE UTILITIES. \GP� 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CIO CONVERSION. \\ ARBY ` Q7 \\ 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. D$ \II 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED _ _ _ _ rte; _ FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLNK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE JGP G u� v - � _ PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. _ UGP— UGP r� -. �� r 7 uGP GP— UGFi -- uGP— uGP 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS - -- - - — UGP - - -UGP- -UGP _.UGP —.UGP —llL,E?---UGR--T--UGP— - AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND -� \ \--------- - - - - -- --- - - - - -- 00 VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND i PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM PEA GRAVEL AND PERFORATED PIPE ARE w COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER j O ANTICIPATED APPROX. 7' BELOW GROUND 0 = UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE J \ SURFACE, SEE JOINT UTILITY TRENCH 1 N TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE PROFILE, SHT 183. ° UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO —J \ 23 c\ 24 + AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL \ s EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS d\ COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, z CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 7 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. U -- -�__ -\ ------ - - - -�/ L --- -------- --- - - - -- ¢ SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER \ 4A g DESIGN \ 5 17 ♦ r ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT P6 THREE PHASE J -BOX J10 PSE PSE CONTRACTOR 7p,8p,11p 1 -4" Q6 264 TA #916 CENTURYLINK CENTURYLINK CONTRACTOR 4q,5q 6q,7q,8q,9q,10q C5 17 "x30" - COMCAST COMCAST CONTRACTOR - 9c, 50c Q7 264 TA #918 CENTURYLINK CENTURYLINK CONTRACTOR 9q,10q 12q,13q Q26 CONNECT TO EX. VAULT - CENTURYLNK - CONTRACTOR 6q,7q,8q,11q - P34 SECONDARY HANDHOLE H8B PSE PSE CONTRACTOR - 1 -4" P49 INTERCEPT POINT IP04 PSE - CONTRACTOR 1 -4" - P50 SECONDARY HAND HOLE H8A PSE PSE CONTRACTOR - 12p P62 REMOVE VAULT J11 PSE - CONTRACTOR - - P93 REMOVE VAULT - PSE - CONTRACTOR - - CALL 2 DAYS BEFORE YOU DIG 1- 800 -424 -5555 JUU I JILI a �4g GIq p08 77 -1417 SURVEYED: KPG ]K�� SOS wn 92 DRAWN BY: SOD DESIGN BY: SOD 7539thAvenueN 2502 Jefferson Avenue y CHECK BY: JLF Seattle, WA 98109 Tacoma, WA 98402 zo3zo �w� (20612861640 PROJ MGR: JF (253)627 -0720 vww.k com REVISION DESCRIPTION BY APP. DATE 0L FILE: 0655DJUT01.dwg TL 3 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. kJG GP wcii 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. O�ER f u- CONSTRUCTION NOTES I — Q2 4" DIAMETER CONDUIT- CENTURYLINK (1 T=3430107 CONDUIT) BOB BRIDGE SCION �CO DIUIT) CONDUIT-CENTURYLINK (4 4" DIAMETER CONDUIT -PSE POWER (1 CORRESPONDING SHEETS \T , BID DOCUMENTS S, \ \ ys"A 0 CONDUIT) q \ A6" DIAMETER CONDUIT -PSE GAS (1 � \\ CONDUIT) c " / .✓ 20 BEGIN INSTALLATION OF 4" DIAMETER \o\ \ ¢ CV CONDUIT -PSE GAS - APPROXIMATE STA F 22 +10, LT 22 BEGIN INSTALLATION OF 6" DIAMETER slAQPIPE CONDUIT -PSE GAS - APPROXIMATE STA �S2 \ D- V 22 +85, LT r,¢ ID °O 2 END INSTALLATION OF 6" DIAMETER CONDUIT -PSE GAS - APPROXIMATE STA 23 +50, RT �2 \^ \� / • 2A END INSTALLATION OF 10" DIAMETER CONDUIT -PSE GAS - APPROXIMATE STA 22 +10, LT 34 COORDINATE WITH LTS GROUP AT 206 - 619 -1570 TO ADJUST TRAFFIC BEARING MANHOLE LID TO GRADE. CATEGORY SHEET RIGHT OF WAY PLANS 10 EXISTING CONDITIONS 58 SITE PREPARATION & TESC PLAN 72 ALIGNMENT PLAN 84 ALIGNMENT PROFILE 96 DRAINAGE PLANS 107 DRAINAGE PROFILE 116,117 WATER PLAN 135 WATER PROFILE 149 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 183 PROPERTY RESTORATION PLANS 198 CHANNELIZATION & SIGNING PLAN 220 ILLUMINATION PLANS 231 IRRIGATION PLAN 285 LANDSCAPE PLAN 297 J& CITY OF FENTON RAINIER AVENUE S (SR 167) DRAWING NO. 167 WL S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 Public Works Department FED AID NO. - CM0167(048) APPROV D FOR CONSTRUCTION JOINT UTILITY TRENCH PLAN DATE: NOV 2011 BY: DATE:11 :9L STA 20 +00 TO STA 24 +50 SHEET NO. 167 OF 304 z �y j.1.j 03 O a 4 G, �t w > •p 0 0 0